  #19221  
Old Posted Nov 15, 2018, 3:05 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,112
Quote:
“The Surrey Board of Trade does not want transportation investments to be delayed yet again in Surrey – and that is what will happen with this new direction,”
That's great, dear. Unfortunately you are not in city hall, so get rammed. SkyTrain isn't just for you. It's also for Langley and the valley to feel like you aren't screwing them out of future development.

Quote:
Perl also characterizes the linear-induction propulsion system used in SkyTrain as “a dead-end technology” monopolized by one supplier – Bombardier Inc. (TSX:BBD.B).

“If you buy a SkyTrain, there’s only one supplier and you can only get it at the price they give to you,” Perl said. “There’s no price competition.”
I mean, we tried Rotem when the Canada Line was done and that did turn out great***, however even if you went LRT you would still be segmenting the transit network in ways that make expansion difficult 20 or 30 years down the line. Again, it's nice to leave the horizon open for future expansion, especially when most of the critics will be dead at that point anyways.
     
     
  #19222  
Old Posted Nov 15, 2018, 3:44 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Such a weird argument anyway. Sure it provides little transportation improvement at a huge cost, but at least we might get it a couple years faster!!!!

Also, the whole premise is flawed. "The fastest-growing cities in the Lower Mainland – Surrey and Langley – desperately need some form of rapid transit." No, they don't. Broadway, with buses coming every 2 minutes packed to the brim, does. I'm all for improving transit around the region, but let's be honest as to why this is done. It's about connecting regional centres, uniting our metro. It has nothing to do with ravenous demand, which does not exist.
     
     
  #19223  
Old Posted Nov 15, 2018, 4:56 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,024
Also love the fear the SBOT tries to spread about Surrey’s project being “bumped” when the options layer out by Translink for the mayors to vote on tomorrow clearly state that that is not the case (as long as they vote for option 1 or 2, which immediately proceeds with implementing Skytrain and retains the 1.65 billion dollars for Surrey).

The ship has sailed but they will still kick and scream and try their best to spread lies.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #19224  
Old Posted Nov 15, 2018, 6:57 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by Metro-One View Post
Also love the fear the SBOT tries to spread about Surrey’s project being “bumped” when the options layer out by Translink for the mayors to vote on tomorrow clearly state that that is not the case (as long as they vote for option 1 or 2, which immediately proceeds with implementing Skytrain and retains the 1.65 billion dollars for Surrey).

The ship has sailed but they will still kick and scream and try their best to spread lies.
Great point.

I wonder how far that $1.65 billion can take them. I also wonder if they'd be able to come up with the funds on such a short notice to keep the line going all the way to Langley.

Fraser SkyTrain + L-Line BRT = Fraser + L-Line LRT, no? Hopefully once they conduct the larger review of SoF rapid transit as they mention in that same report it shows that the SkyTrain + BRT strategy is feasible.
     
     
  #19225  
Old Posted Nov 15, 2018, 3:57 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by GlassCity View Post
Great point.

I wonder how far that $1.65 billion can take them. I also wonder if they'd be able to come up with the funds on such a short notice to keep the line going all the way to Langley.

Fraser SkyTrain + L-Line BRT = Fraser + L-Line LRT, no? Hopefully once they conduct the larger review of SoF rapid transit as they mention in that same report it shows that the SkyTrain + BRT strategy is feasible.
Nobody said they have to construct the Skytrain extension as "two phases" at different periods of time, they can do both phases at the same time if they have the funding. What constrains the construction is materials and labor availability. If you're really building 4 extensions (two phases of Surrey and two phases of Broadway) at the same time, then the guideway construction equipment might not be available if they overlap.
     
     
  #19226  
Old Posted Nov 15, 2018, 4:35 PM
waves's Avatar
waves waves is offline
waves
 
Join Date: Jun 2015
Location: North Vancouver
Posts: 382
Quote:
Originally Posted by Kisai View Post
Nobody said they have to construct the Skytrain extension as "two phases" at different periods of time, they can do both phases at the same time if they have the funding. What constrains the construction is materials and labor availability. If you're really building 4 extensions (two phases of Surrey and two phases of Broadway) at the same time, then the guideway construction equipment might not be available if they overlap.
But isn't Broadway mostly underground and Surrey mostly above ground? Should be different equipment for both no?
     
     
  #19227  
Old Posted Nov 15, 2018, 8:42 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,670
Quote:
Originally Posted by waves View Post
But isn't Broadway mostly underground and Surrey mostly above ground? Should be different equipment for both no?
There is still an above ground portion of the Broadway extension.
     
     
  #19228  
Old Posted Nov 15, 2018, 9:36 PM
waves's Avatar
waves waves is offline
waves
 
Join Date: Jun 2015
Location: North Vancouver
Posts: 382
Quote:
Originally Posted by cganuelas1995 View Post
There is still an above ground portion of the Broadway extension.
It's pretty minuscule though. Like at most 1km.
     
     
  #19229  
Old Posted Nov 16, 2018, 12:40 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,112
Quote:
Originally Posted by waves View Post
It's pretty minuscule though. Like at most 1km.
We should be able to reuse the guideway construction gantry. Do we still have the unit from the Evergreen Line in storage or has it been scrapped?

Quote:
Originally Posted by Metro-One View Post
I wonder if you could always ask for one when they are replacing them?
My contact at TransLink seems to of moved out of province. Unless someone else knows how to butter up Asset Control and Disposal (or just slips me a note under the table) I'm SOL.
     
     
  #19230  
Old Posted Nov 21, 2018, 4:41 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,791
It looks like they are starting to do work on the Phibbs Exchange upgrades.
     
     
  #19231  
Old Posted Nov 21, 2018, 5:11 PM
interrobang interrobang is offline
Registered User
 
Join Date: Nov 2017
Location: North Vancouver
Posts: 22
Quote:
Originally Posted by jollyburger View Post
It looks like they are starting to do work on the Phibbs Exchange upgrades.
According to BCBid, the tender for the work closed Nov. 1, 2018. It's not clear if they awarded the contract already, or if this is a portion of pre-work previously awarded. It only lists the MOT Unverified Bid Results
     
     
  #19232  
Old Posted Nov 21, 2018, 6:09 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,178
They're closing the Park and Ride, and filling in the SW corner. Not sure how useful either of those would be.
     
     
  #19233  
Old Posted Nov 21, 2018, 9:11 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,104
TransLink just had the biggest month for ridership ever

Surpassed the record held in February 2010 during the Olympics.
     
     
  #19234  
Old Posted Nov 21, 2018, 10:35 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,791
Quote:
Originally Posted by Migrant_Coconut View Post
They're closing the Park and Ride, and filling in the SW corner. Not sure how useful either of those would be.
They are building a new highway exit over those areas then they'll start the exterior part of the exchange improvements then eventually build the new island. The new highway exit will connect with a new on-ramp onto the bridge for buses headed across to Burnaby/Vancouver.

And there's supposed to be funding for a massive (for the North Shore) park and ride in the other cloverleaf.
     
     
  #19235  
Old Posted Nov 21, 2018, 10:44 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,178
Quote:
Originally Posted by jollyburger View Post
They are building a new highway exit over those areas then they'll start the exterior part of the exchange improvements then eventually build the new island. The new highway exit will connect with a new on-ramp onto the bridge for buses headed across to Burnaby/Vancouver.

And there's supposed to be funding for a massive (for the North Shore) park and ride in the other cloverleaf.
Thanks. Found the plans, too.
     
     
  #19236  
Old Posted Nov 21, 2018, 11:20 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Since Second Narrows Bridge is most of the time a choke point, out of curiosity, I checked on google map how long it takes to walk from Phobos Exchange to Kootnay Loop.

It takes 43 minutes...
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #19237  
Old Posted Nov 21, 2018, 11:47 PM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by Dengler Avenue View Post
Since Second Narrows Bridge is most of the time a choke point, out of curiosity, I checked on google map how long it takes to walk from Phobos Exchange to Kootnay Loop.

It takes 43 minutes...
No wonder why it takes forever to get to Kootenay Loop, because it'll take you 4000 years to get there.
     
     
  #19238  
Old Posted Nov 22, 2018, 12:24 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by nname View Post
TransLink just had the biggest month for ridership ever

Surpassed the record held in February 2010 during the Olympics.
Wow, that's a huge year-over-year increase. See what happens when you fund the transit system?
     
     
  #19239  
Old Posted Nov 22, 2018, 12:27 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Quote:
Originally Posted by Firebrand View Post
No wonder why it takes forever to get to Kootenay Loop, because it'll take you 4000 years to get there.
I’m so sorry I meant to type Phibbs.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #19240  
Old Posted Nov 24, 2018, 7:04 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,121
__________________
belowitall
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.