HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia


Reply

 
Thread Tools Display Modes
     
     
  #961  
Old Posted Nov 9, 2018, 9:20 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,683
Quote:
Originally Posted by craner View Post
Isn't the 90km speed limit a Parks Canada thing ?
Oh well enforcement’s more lax on the BC side.
The speeding fine for 30 kph over in BC is probably around the same amount as that for 10 kph over in AB.
Reply With Quote
     
     
  #962  
Old Posted Nov 13, 2018, 7:16 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Quote:
Originally Posted by 240glt View Post
^ At least it's not 70 in large stretches like it is through Jasper park
It's been nearly 30 years since I've driven through Jasper but where on earth is the speed limit 70? That's absurd.
Reply With Quote
     
     
  #963  
Old Posted Nov 14, 2018, 3:37 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by lubicon View Post
It's been nearly 30 years since I've driven through Jasper but where on earth is the speed limit 70? That's absurd.
Wildlife zones. There's several stretches that it drops to 70. They can't be bothered to mitigate wildlife going on the road through Jasper for some reason. In those zones is where you see lots of idiots literally parking on the highway, letting their kids run around in traffic while they take pictures of the sheep. I hate driving though Jasper, especially in the summer months
Reply With Quote
     
     
  #964  
Old Posted Nov 15, 2018, 4:43 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,683
No Truck on Left Lane in the Snowhill Area on Coquihalla Highway

Reply With Quote
     
     
  #965  
Old Posted Nov 16, 2018, 4:03 AM
Mishpet1 Mishpet1 is offline
Registered User
 
Join Date: Aug 2011
Posts: 73
Hi guys, just found this story on the completion of two sections of highway in the Prince George area.

https://ckpgtoday.ca/article/545331/two-major-highway-projects-complete
Reply With Quote
     
     
  #966  
Old Posted Nov 16, 2018, 5:03 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,683
Only 3 km of twinning on 97 and the ministry of transportation bragged???
Reply With Quote
     
     
  #967  
Old Posted Nov 16, 2018, 4:50 PM
OzzyCalgary OzzyCalgary is offline
Registered User
 
Join Date: Apr 2016
Location: Calgary
Posts: 55
A new 5-km corridor in Prince Rupert received $15 million in funding from the government last week. This road will connect Ridley Island with the container port, moving heavy truck traffic from downtown Rupert and shortening the route by 15km.




https://www.rupertport.com/news/releases/transportation_infrastructure_investment
Reply With Quote
     
     
  #968  
Old Posted Nov 16, 2018, 8:01 PM
Denscity Denscity is offline
Registered User
 
Join Date: Jun 2008
Location: Laramidia
Posts: 12,783
Quote:
Originally Posted by Dengler Avenue View Post
Only 3 km of twinning on 97 and the ministry of transportation bragged???
Divided highway up the side of a mountain beside a river with a rerouted CN line sounds a bit complicated.
Reply With Quote
     
     
  #969  
Old Posted Nov 17, 2018, 5:25 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
https://globalnews.ca/news/4671808/new-224m-bridge-announced-for-sicamous-b-c/

I wonder if it'kk come with interchanges. Probably not.
Reply With Quote
     
     
  #970  
Old Posted Nov 19, 2018, 5:12 AM
jimmyboy95 jimmyboy95 is offline
Registered User
 
Join Date: Aug 2018
Posts: 66
The 28 highway maintenance contracts in BC are all up for review. The contracts are all being updated with higher standards required from each contractor. Their new standards include: better communication with the public, more frequent patrols during weather events and higher standards for plowing. Some of the previous contractors have been renewed but some are being replaced:

-Mid and North Island: Mainroad is taking over from Emcon on both contracts. The whole Vancouver Island is now under Mainroad's responsibility
-Howe Sound: Miller Maintenance taking over from Mainroad
-Okanagan Similkameen: Acciona International taking over from Argo. This is a Spanish multinational company who has never had a contract for highway maintenance in BC
-Okanagan Shuswap: Acciona International taking over from JPW
-Kootenay Boundary: Yellowhead Road and Bridge taking over from Emcon

The remainder of the contracts are either yet to be reviewed or have been renewed with the same contractor as before. I would really like to see VSA lose their Coquihalla/Nicola contract as there have been countless complaints about them.
Reply With Quote
     
     
  #971  
Old Posted Nov 21, 2018, 8:19 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,429
Sicamous Bridge

$224M seems like a lot - what makes it so expesive ?
Reply With Quote
     
     
  #972  
Old Posted Nov 21, 2018, 3:11 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by craner View Post
$224M seems like a lot - what makes it so expesive ?
I know they're doing some other work on the west side of the bridge. I think they're making it taller as well. But yeah seems expensive.
Reply With Quote
     
     
  #973  
Old Posted Nov 21, 2018, 4:03 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,683
Quote:
Originally Posted by craner View Post
$224M seems like a lot - what makes it so expesive ?
Unionized wage duh

Just watch: you all are again gonna pay more for less.
Reply With Quote
     
     
  #974  
Old Posted Nov 21, 2018, 4:51 PM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by Dengler Avenue View Post
Unionized wage duh

Just watch: you all are again gonna pay more for less.
You're probably right. No way should that project cost anywhere near $224.5 million.
Reply With Quote
     
     
  #975  
Old Posted Nov 21, 2018, 5:58 PM
DoubleK DoubleK is offline
Near Generational
 
Join Date: Sep 2011
Location: Calgary
Posts: 1,447
Quote:
Originally Posted by jimmyboy95 View Post
The 28 highway maintenance contracts in BC are all up for review. The contracts are all being updated with higher standards required from each contractor. Their new standards include: better communication with the public, more frequent patrols during weather events and higher standards for plowing. Some of the previous contractors have been renewed but some are being replaced:

-Mid and North Island: Mainroad is taking over from Emcon on both contracts. The whole Vancouver Island is now under Mainroad's responsibility
-Howe Sound: Miller Maintenance taking over from Mainroad
-Okanagan Similkameen: Acciona International taking over from Argo. This is a Spanish multinational company who has never had a contract for highway maintenance in BC
-Okanagan Shuswap: Acciona International taking over from JPW
-Kootenay Boundary: Yellowhead Road and Bridge taking over from Emcon

The remainder of the contracts are either yet to be reviewed or have been renewed with the same contractor as before. I would really like to see VSA lose their Coquihalla/Nicola contract as there have been countless complaints about them.
They were one of the partners that did the Southeast Stony Trail project in Calgary.
Reply With Quote
     
     
  #976  
Old Posted Nov 22, 2018, 5:16 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,429
Quote:
Originally Posted by Dengler Avenue View Post
Unionized wage duh

Just watch: you all are again gonna pay more for less.
Oh NDP
Reply With Quote
     
     
  #977  
Old Posted Nov 22, 2018, 6:46 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,032
Quote:
Originally Posted by Corndogger View Post
You're probably right. No way should that project cost anywhere near $224.5 million.
It won’t even have an interchange for the town’s main access...

I am okay with the protected T intersections for seldomly used access points in the boonies (such as those that service only a few scattered houses / cabins and small mountain access roads) but all major intersections (such as those that access entire communities) should be built as interchanges with all highway upgrade projects. If Pritchard was built as an interchange and Chase is getting two interchanges than so should this project.

Also, what ever happened to Kicking Horse phase 5B? That was going to upgrade the access points to Golden as interchanges.
Reply With Quote
     
     
  #978  
Old Posted Nov 22, 2018, 4:21 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by Metro-One View Post
It won’t even have an interchange for the town’s main access...

I am okay with the protected T intersections for seldomly used access points in the boonies (such as those that service only a few scattered houses / cabins and small mountain access roads) but all major intersections (such as those that access entire communities) should be built as interchanges with all highway upgrade projects. If Pritchard was built as an interchange and Chase is getting two interchanges than so should this project.

Also, what ever happened to Kicking Horse phase 5B? That was going to upgrade the access points to Golden as interchanges.
I think the difference between the intersections at Prichard and Chase and the intersection at Sicamous is that through the former the speed limit is 90 or 100 kph, whereas at the 97 turnoff in Sicamous the speed limit is 50. I've never really seen the intersection there backed up too badly so not sure if an interchange is really necessary.
Reply With Quote
     
     
  #979  
Old Posted Nov 22, 2018, 5:04 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,683
Quote:
Originally Posted by 240glt View Post
I think the difference between the intersections at Prichard and Chase and the intersection at Sicamous is that through the former the speed limit is 90 or 100 kph, whereas at the 97 turnoff in Sicamous the speed limit is 50. I've never really seen the intersection there backed up too badly so not sure if an interchange is really necessary.
I heard that intersection gets backed up really badly during summer though...
Reply With Quote
     
     
  #980  
Old Posted Nov 22, 2018, 7:22 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by Dengler Avenue View Post
I heard that intersection gets backed up really badly during summer though...
Perhaps it does in the peak of summer.. It never seemed too bad when I drove it regularly from Calgary but since '04 I've been in Edmonton so I take 16/5 to get to the Okanagan now. I know the tourist traffic from Alberta keeps going up every year, so maybe it is at a point where a flyover is needed to go south on 97 from westbound on the TCH
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia
Forum Jump



Forum Jump


All times are GMT. The time now is 3:30 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.