HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #6261  
Old Posted Nov 19, 2018, 3:55 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
Quote:
Originally Posted by Trainguy View Post
"This is Sky train for Langley not Surrey. Passing through low density areas and many areas of Surrey that can't even be developed for residential. Sky train to Newton Exchange should be first priority. Rapid transit for Surrey should make Surrey itself more interconnect."

I think this poster has it wrong. It isn't rapid transit for Surrey alone. This system serves the whole region and that is where Surrey 1st got it wrong. Regional money should serve the whole region and not some inner-city pet project. Good on the voters for rejecting it.
At least he said SkyTrain to Newton, not LRT
     
     
  #6262  
Old Posted Nov 19, 2018, 4:04 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by BirchTrain View Post
Uh huh. I see 2 stations in the Langley’s. The rest are in Surrey. :

Also Newton and Guildford are not getting left out, if Option 2 passes. Translink will look at an enhanced 96 B-Line for the SNG corridor.
That looks like a future Skytrain to White Rock.
     
     
  #6263  
Old Posted Nov 19, 2018, 4:58 AM
BirchTrain BirchTrain is offline
Eat the sun
 
Join Date: Oct 2018
Posts: 61
Quote:
Originally Posted by swimmer_spe View Post
That looks like a future Skytrain to White Rock.
It’s BRT
     
     
  #6264  
Old Posted Nov 19, 2018, 5:36 AM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Here is an informative link on BRT.

My concern is that 104th will get hacked down to 2 lanes if BRT follows the route of LRT. Better not.

https://www.itdp.org/library/standards-and-guides/the-bus-rapid-transit-standard/what-is-brt/
     
     
  #6265  
Old Posted Nov 19, 2018, 5:55 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by BirchTrain View Post
It’s BRT
So is the 99.
     
     
  #6266  
Old Posted Nov 19, 2018, 5:55 AM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by Trainguy View Post
Here is an informative link on BRT.

My concern is that 104th will get hacked down to 2 lanes if BRT follows the route of LRT. Better not.

https://www.itdp.org/library/standards-and-guides/the-bus-rapid-transit-standard/what-is-brt/
What TransLink could do is have the outermost two lanes be dedicated bus lanes only between at the start of service to 7:00 pm at weekdays. You could also have multiple bus routes using the same lane, not just the 96, and allow driving permits at certain times of the day. You can't do that on two pairs of tracks.

King George Blvd is much easier to implement because it is wide enough to accommodate bus lanes without disrupting car traffic.

The enhanced 96 can also expand beyond Guildford, and can connect it to Coquitlam Centre if demand is there. It can also extend beyond Newton as shown by the map. Since it's essentially an upgraded B-Line, some trips can interline with other routes, especially the 319, which could use some help with 60fters. All of these added features won't be seen with the LRT.
     
     
  #6267  
Old Posted Nov 19, 2018, 5:59 AM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by swimmer_spe View Post
Quote:
Originally Posted by BirchTrain View Post
It’s BRT
So is the 99.
They're both not. Both the 99 and 96 are more like express routes—BRT creep to be more precise—rather than a true BRT.
     
     
  #6268  
Old Posted Nov 19, 2018, 6:02 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Firebrand View Post
They're both not. Both the 99 and 96 are more like express routes—BRT creep to be more precise—rather than a true BRT.
My point is that once the 99 is replaced with a Skytrain route, and the Skytrain is built to Langley, this might be the next extension. We are talking at least 20 years, but still, it is a future possibility.
     
     
  #6269  
Old Posted Nov 19, 2018, 6:42 AM
BirchTrain BirchTrain is offline
Eat the sun
 
Join Date: Oct 2018
Posts: 61
Quote:
Originally Posted by swimmer_spe View Post
My point is that once the 99 is replaced with a Skytrain route, and the Skytrain is built to Langley, this might be the next extension. We are talking at least 20 years, but still, it is a future possibility.
McCallum has said he wants the “phase 2” of SkyTrain in Surrey to be from city centre down King George to White Rock Centre. We probably would see some rail on that corridor in the near future, possible connecting north to Coquitlam.
     
     
  #6270  
Old Posted Nov 19, 2018, 7:48 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,100
Quote:
Originally Posted by swimmer_spe View Post
My point is that once the 99 is replaced with a Skytrain route, and the Skytrain is built to Langley, this might be the next extension. We are talking at least 20 years, but still, it is a future possibility.
Keeping in mind that this all depends on being able to build two $2-3B SkyTrain routes every decade. Every addition to the network multiplies TransLink's spending power, but in the meantime, we need to make sure the province and feds keep delivering.
     
     
  #6271  
Old Posted Nov 20, 2018, 2:33 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
Keeping in mind that this all depends on being able to build two $2-3B SkyTrain routes every decade. Every addition to the network multiplies TransLink's spending power, but in the meantime, we need to make sure the province and feds keep delivering.
With the momentum behind building transit, I doubt any government, federally or provincially will ever completely put the brakes on.
     
     
  #6272  
Old Posted Nov 20, 2018, 3:19 AM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by swimmer_spe View Post
With the momentum behind building transit, I doubt any government, federally or provincially will ever completely put the brakes on.
Especially when the Federal election is a year away. The Feds want the money to be used soon before another party comes by and may use that money for something else.
     
     
  #6273  
Old Posted Nov 20, 2018, 8:31 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Firebrand View Post
Especially when the Federal election is a year away. The Feds want the money to be used soon before another party comes by and may use that money for something else.
Absolutely. I can expect that this next year will be promises to every transit idea out there.
     
     
  #6274  
Old Posted Nov 20, 2018, 8:41 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
How soon can we have both Expo and Millennium line extensions shovel ready?
     
     
  #6275  
Old Posted Nov 20, 2018, 9:07 PM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Quote:
Originally Posted by Trainguy View Post
Here is an informative link on BRT.

My concern is that 104th will get hacked down to 2 lanes if BRT follows the route of LRT. Better not.

https://www.itdp.org/library/standards-and-guides/the-bus-rapid-transit-standard/what-is-brt/
Most likely scenario is that it'll only have dedicated lanes along KGB. 104th just isn't wide enough. Unless someone can magically create space out of thin air, it won't be full BRT. Basically think a la 98 b-line, which only had ROW in Richmond.
     
     
  #6276  
Old Posted Nov 20, 2018, 9:41 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Quote:
Originally Posted by ilikeredheads View Post
Most likely scenario is that it'll only have dedicated lanes along KGB. 104th just isn't wide enough. Unless someone can magically create space out of thin air, it won't be full BRT. Basically think a la 98 b-line, which only had ROW in Richmond.
Surrey 1st tried to do that by magically thinking that everyone would just shift over to 105th ave or other streets because 104th would be a walking/biking/transit route. This isn't Mayberry!!! People use 104th because it is the most direct route for getting where they need to go.

Doug has the right idea about creating a spine (Skytrain) that routes can feed into.
     
     
  #6277  
Old Posted Nov 20, 2018, 9:45 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
I don't see this posted here:

'You do a backbone first': Surrey's mayor defends SkyTrain plan, talks 10-year vision

Quote:
“You do a backbone first, which is Fraser Highway from City Centre to Langley and from City Centre to Newton then to South Surrey. That’s the backbone,” he explained.

“Into that backbone, we put fast bus lanes from Cloverdale into Fraser Highway … from Guildford into Fraser Highway … from Guildford also down 104th to our City Centre. And before the second phase goes along, fast bus lanes from Newton into King George Station at our City Centre.”

McCallum says that is the 10-year plan.
     
     
  #6278  
Old Posted Nov 21, 2018, 1:12 AM
Sheba Sheba is online now
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,588
Quote:
Originally Posted by nname View Post
I really hope that their future phase Surrey Central to Newton / South Surrey is planned to be a subway at least part of the way - that would remove not only conflicts with cars but also with the existing elevated Expo Line.

(subway the whole way would be nice but I'm guessing the ground won't allow it - just like through the ALR on Fraser Highway)
     
     
  #6279  
Old Posted Nov 21, 2018, 1:46 AM
BirchTrain BirchTrain is offline
Eat the sun
 
Join Date: Oct 2018
Posts: 61
Quote:
Originally Posted by Sheba View Post
I really hope that their future phase Surrey Central to Newton / South Surrey is planned to be a subway at least part of the way - that would remove not only conflicts with cars but also with the existing elevated Expo Line.

(subway the whole way would be nice but I'm guessing the ground won't allow it - just like through the ALR on Fraser Highway)
Yeah part of it would literally go through an area even more prone to flooding than the ALR Fraser Hwy passes through.

It would probably go underground through City Centre and maybe Newton, and elevated the rest of the way. The southern terminus could be White Rock Beach, but NIMBYs might force it to stop at the current White Rock Centre bus exchange. Hopefully there will be a gondola connection to the beach.
     
     
  #6280  
Old Posted Nov 21, 2018, 2:29 AM
Sheba Sheba is online now
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,588
Quote:
Originally Posted by BirchTrain View Post
Yeah part of it would literally go through an area even more prone to flooding than the ALR Fraser Hwy passes through.

It would probably go underground through City Centre and maybe Newton, and elevated the rest of the way. The southern terminus could be White Rock Beach, but NIMBYs might force it to stop at the current White Rock Centre bus exchange. Hopefully there will be a gondola connection to the beach.
If people want to go all Nimby then stop it at the South Surrey Park & Ride and let them bus / drive from there.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:14 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.