Quote:
Originally Posted by Kitchissippi
I really doubt it. If that was their intention then they built this station ass-backwards. The T-line platform should have been on the east side, resulting in a concourse below the C-line tracks that could be entered with a ramp down instead of stairs up (kind of like uOttawa). Such a concourse could have had the potential of being extended under Albert and integrated more elegantly into the Trinity development, not to mention facilitate bus transfers.
Also, seeing that they had to completely rebuild the bridge, this station should have been a centre platform configuration for the C-line which would have resulted in less elevators.
|
Good Day.
Agreed. Totally.
As mentioned before, Bayview has been a complete cluster-F from day 2 when they kept redrawing it per continuously changing plans/priorities/budgets/intersection/overlaps/interlining/Gatineau access/ etc/etc/etc.
They never got the thing straight since no one wanted to admit to closing off options and possibilities.
It should have been triple tracked to allow freight off to the far west side (when freight was still a thing and requirement (saving the whole mOOse gerfuffle) at base grade) and double-tracked the T-Line station right from the get-go, saving everybody a lot of grief.
But center-platform C-Line would have involved some ups-and-downs for everybody anyway given the Albert/Scott overpass .vs. ground-level conundrum. It absolutely demanded some thinking-outside-the-box, which never happened.
Now I think they are hoping for a miracle from RVL for the north-side west-bound, and I think it will be a major disappointment no matter who/what/when/how.
At this point - the whole thing beats me !!
NoJoy.