Old Posted Nov 11, 2018, 1:27 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,842
Quote:
Originally Posted by Kitchissippi View Post
You're picking at the smaller point of my larger opinion which is Metcalfe was hardly a hero of Canadian democracy, and it's ironic to have a street leading up to Parliament named after him. He was a British colonial governor sent to dictate British rule on on pre-Confederation British North America.
So being a hero of Canadian Democracy is a requirement for street naming.

Besides concerns about trying to erase our history, it is impractical to rename all the streets every time the zeitgeist changes.
     
     
  #8602  
Old Posted Nov 11, 2018, 1:34 AM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Quote:
Originally Posted by acottawa View Post
Well, I know how to use the Wikipedia.
__________________
Loin des yeux, loin du coeur.
     
     
  #8603  
Old Posted Nov 11, 2018, 1:38 AM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 312
The final Snapshot update for this week. This time for Cyrville and Blair Stations.

https://www.otrainfans.ca/blogs/snapshot-of-cyrville-and-blair-stations-november-10-2018
     
     
  #8604  
Old Posted Nov 11, 2018, 1:41 AM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Quote:
Originally Posted by acottawa View Post
So being a hero of Canadian Democracy is a requirement for street naming.

Besides concerns about trying to erase our history, it is impractical to rename all the streets every time the zeitgeist changes.
I actually raised the topic of Ottawa street and other names in another thread a few days ago:

https://forum.skyscraperpage.com/showpost.php?p=8372737&postcount=167

As for Metcalfe, he was governor general after and in terms of streets that have banal, irrelevant or useless names, it's certainly not the worst offender in downtown Ottawa.
__________________
Loin des yeux, loin du coeur.
     
     
  #8605  
Old Posted Nov 11, 2018, 2:02 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,045
Quote:
Originally Posted by acottawa View Post
So being a hero of Canadian Democracy is a requirement for street naming.

Besides concerns about trying to erase our history, it is impractical to rename all the streets every time the zeitgeist changes.
+eleventyzillion
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #8606  
Old Posted Nov 11, 2018, 2:03 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,045
Quote:
Originally Posted by Acajack View Post
As for Metcalfe, he was governor general after and in terms of streets that have banal, irrelevant or useless names, it's certainly not the worst offender in downtown Ottawa.
I am a much bigger fan of the banal, irrelevant, and useless names, than the god-awful tacky and inappropriate naming (and renaming) practices that have taken hold in this city. But maybe that should be a different thread.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #8607  
Old Posted Nov 11, 2018, 3:56 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,259
Tweet from Mathieu Fleury:

Quote:
Nice recent picture of Rideau Station’s West Entrance. #LRT #Ottcity @ottawacity
     
     
  #8608  
Old Posted Nov 11, 2018, 5:27 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 28,933
Ugh. They really have no intention to finish before Christmas. Do they?

Even Cyrville looks like they will take the full month to finish and demobilize.
     
     
  #8609  
Old Posted Nov 11, 2018, 5:51 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Truenorth00 View Post
Ugh. They really have no intention to finish before Christmas. Do they?

Even Cyrville looks like they will take the full month to finish and demobilize.
What made you think they would? The earliest I heard that it would open is February, so with 1 month of testing, that means they won't be finished until January.
     
     
  #8610  
Old Posted Nov 11, 2018, 6:37 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 28,933
Quote:
Originally Posted by roger1818 View Post
What made you think they would? The earliest I heard that it would open is February, so with 1 month of testing, that means they won't be finished until January.
It was me speculating they would open in Feb. To do that though, they'd really have to finish by Christmas. At least to the point where all that's left are minor deficiencies and operational testing. This would give them sufficient time for testing and a modicum of slack.

If they aren't wrapping up till Jan, good chance that service launch might be end Feb to early March.
     
     
  #8611  
Old Posted Nov 11, 2018, 7:17 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Truenorth00 View Post
It was me speculating they would open in Feb. To do that though, they'd really have to finish by Christmas. At least to the point where all that's left are minor deficiencies and operational testing. This would give them sufficient time for testing and a modicum of slack.

If they aren't wrapping up till Jan, good chance that service launch might be end Feb to early March.
When the plan was to hand the line over Nov. 2, they said it would be operational by the end of the month, which is less than a month. I don’t see why that would be different now. There are always risks of major deficiencies that could cause additional delays, but hopefully those will be sorted out prior to the handover.
     
     
  #8612  
Old Posted Nov 11, 2018, 7:19 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Quote:
Originally Posted by Uhuniau View Post
I am a much bigger fan of the banal, irrelevant, and useless names, than the god-awful tacky and inappropriate naming (and renaming) practices that have taken hold in this city. But maybe that should be a different thread.
You mean you like names like Havenlea Dr more than Sir John A Macdonald Pkwy?
__________________
Loin des yeux, loin du coeur.
     
     
  #8613  
Old Posted Nov 11, 2018, 7:19 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,842
I still think May.
     
     
  #8614  
Old Posted Nov 11, 2018, 8:24 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by acottawa View Post
I still think May.
Good Day.

Me Three !

     
     
  #8615  
Old Posted Nov 11, 2018, 9:23 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by acottawa View Post
I still think May.
It may not open in February but unless they find a serious problem, I think it will open before May. If they want to open it in April, I could see the universities pushing to have them wait until after exams are over though.
     
     
  #8616  
Old Posted Nov 11, 2018, 10:02 PM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Quote:
Originally Posted by acottawa View Post
I still think May.
Same here. Still think it'll be in May / spring service change.
     
     
  #8617  
Old Posted Nov 12, 2018, 1:32 AM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,840
Quote:
Originally Posted by kevinbottawa View Post
Tweet from Mathieu Fleury:
Went through the tweet's comments; guy asked "Do we have a confirmed start date yet?" and Watson replied "By the end of March".

https://twitter.com/JimWatsonOttawa/status/1061365923712524294
     
     
  #8618  
Old Posted Nov 12, 2018, 1:33 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,618
Honestly, at this point, just do it right and make sure all is up and running for Canada Day to shuttle locals and tourists around. Gonna be cool for tourists that come to Ottawa via rail and transfer downtown on our fancy schmansy LRT line and tunnel.
     
     
  #8619  
Old Posted Nov 12, 2018, 2:30 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,780
Quote:
Originally Posted by O-Town Hockey View Post
Honestly, at this point, just do it right and make sure all is up and running for Canada Day to shuttle locals and tourists around. Gonna be cool for tourists that come to Ottawa via rail and transfer downtown on our fancy schmansy LRT line and tunnel.
It won't be able to handle Canada Day crowds. It is designed to handle peak period service on a normal work day. There will have to be parallel bus service to handle the overflow, otherwise we will be waiting for hours. I don't think I would want to be underground in a crush load situation.
     
     
  #8620  
Old Posted Nov 12, 2018, 2:50 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by lrt's friend View Post
It won't be able to handle Canada Day crowds. It is designed to handle peak period service on a normal work day. There will have to be parallel bus service to handle the overflow, otherwise we will be waiting for hours. I don't think I would want to be underground in a crush load situation.
If mostly regular bus service could handle Canada day, shouldn't the Confederation Line also be able to? Granted there may be plenty of safety concerns with that, and parallel bus service may not be a bad idea either.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:40 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.