Quote:
Originally Posted by haljackey
Day 147 Nov 9
Snowed this morning. They better giddy up.

|
Well, the first phase of the flex street was due to be completed by October 31. We're now almost into mid-November, and I'd say only 60% is complete, if what I see is anything to go by when I leave the office to get lunch or take a break. There are still spots where they've had to rip things up because something got missed the first time around.
I'm also annoyed that the sewer repairs at York and Ridout are still not done and over two months behind schedule, since the deadline was August 31. And starting last week, they've ripped up the part of York just east of Talbot and York and closed off the street to all eastbound traffic in that area.
The rush-hour snarl-ups this is causing in the York/Talbot/Ridout/Richmond blocks are a thing to behold. Luckily, they don't last too long.
Is someone asleep at the switch here? I've never seen any construction project in London so badly coordinated.