HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Nov 8, 2018, 8:36 PM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Would it be better to have the North Shore Line use the old Interurban ROW via Strathcona? It wouldn't have to be bored all the way, and there IS a somewhat deep section on the path that might screw things up, but:


This is bascially the proposed change in alignment. Somewhat longer and deeper line in Burrard Inlet and less development opprotunity around line- in exchange for a cheaper alignment through Vancouver, being able to use an abandoned port as the tunnel port, reducing costs, and giving a staging area for the project (the port was originally for BC cruise ships, but was abandoned, I forgot its name) and less severe turns at Lonsdale Quay.

(My Line in purple)
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:05 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.