Quote:
Originally Posted by montydawg
That 5 billion number is the best case scenario, where someone like amazon shows up. They would get up to 1.9 billion in incentives if it is build out to the maximum size/value. Most likely the project will be smaller and get a much smaller tax incentive rebate. Everyone is throwing around numbers from the best case scenario. Also, this will likely be built out over 20 years, like Atlantic station.
|
In one of the documents the city released, it was implied that CIM "expects" to do a development valued at around $3.8 billion. Meaning that with no Amazon, they are planning on a $3.8 billion development which would be eligible to gain approximately $1.5 billion in incentives.
Quote:
Originally Posted by Dale
Okay, wake me up when something happens.
|
NS does plan to use the proceeds from the sale of their land in the Gulch to build a new HQ tower in Midtown.