Quote:
Originally Posted by lrt's friend
But decreasing travel time allows you to run trains more frequently. If we were to get travel time on the current Trillium Line back down to 12 minutes with a 3 minute layover at the end of the line for a total of 15 minutes, we could run trains every 7.5 minutes. Right now, end to end travel including waiting time is 24 minutes (of which 16 to 17 minutes is actual travel time). This is why we have 12 minute frequency. To a large degree, poorly located passing tracks is making it impossible to improve on the 12 minute frequency and reduce the wait time at the end of the line.
|
If the issue is lack of equipment, that would be true. However, the bigger issue is waiting for the block to clear and the switch to be thrown, and given the number of stops, the speed is not a significant factor (dwell times and acceleration are bigger factors).
Quote:
|
We will be improving the location of passing tracks and eliminating the VIA Rail diamond that will eliminate some delays following Phase 2. Whether that results in improved frequency is questionable but it is possible.
|
The diamond will make things more reliable (waiting for a VIA rail train causes a domino effect of delays). The lengthening of the passing tracks should help a bit, but there is only so much you can do with single track. Even if they can improve the frequency to every 10 minutes, it would be huge as it would make it easier to co-ordinate bus schedules and would go from 5 to 6 trains an hour (a 20% increase in capacity).
Quote:
|
We also have to remember that we will be reducing wait times at the south end, because trains will have to reach the next passing track at South Keys, whereas today, they wait at Greenboro. This will mean that we have less wait time that can be reduced in order to improve frequency.
|
Once again, wait time at the end of the line is only an issue if limited equipment is the issue affecting frequency. By having the dwell time equal to the frequency, they can have a train depart almost as soon as the previous train arrives, so the time spend alighting and boarding doesn't affect block ocupancy.
Quote:
|
Furthermore, single tracking between South Keys and the Walkley underpass may be sufficient to limit frequency improvements for the entire line. That is quite a distance with no passing track.
|
It is about 1900m from the passing track north of Walkley to the one north of South Keys, which is about the same distance as will be from the Carleton siding to the Gladstone siding (it is currently longer though).
Quote:
|
Even if just the Dow's Lake tunnel was left single track, it would be sufficiently limiting that it would minimize the possible service improvements possible by double tracking everything else.
|
They could probably reduce the effect by making the stretch of single track as short as possible, but it would still limit things significantly.