Quote:
Originally Posted by kmcamp
Well, in a slightly positive view the western stations went from an empty shells to about the same level of completion the Eastern stations were a month ago at a much much faster pace, so obviously RTG can speed things up when they want to. Maybe there is hope they can catch all the way up by the end of the month.
|
Sure. They are working faster. But we’re still a full month away from completion on these stations. At best. Even in the Eastern stations, we’re looking at another 2 weeks till they completely finish and demobilize.
And given how fast they are working, and the temperature swings these days, we have to be worried about quality for some of the work too. We shouldn’t be happy that they are imitating the student who crams the night before the big exam.
Quote:
Originally Posted by kmcamp
As for Blair, they could have at least sprung for some cans of paint. It wouldn't look quite as jarring if they repainted all the red to match the new color scheme
|
Yeah. That would have actually been good. A nice paint job, and some work on the floors and ceiling (for the bridge) and the platform for the bus station would have gone a long way. I can’t imagine the total cost for all that would have been more than a few million.
If they could scrounge up the budget, for the bridge, I wish they had done this:
https://www.durhamregion.com/news-story/8930093-lighting-up-the-pickering-skyline/
That cost $23 million. But it’s one of the longest pedestrian bridges in the world and at 250m, crosses 14 lanes of traffic and 6 railroad tracks, with only a support in the middle of the highway. Ours could have been done for less than $20 million right up to the mall. And probably less than $15 milllion if I had to guess.