HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Oct 27, 2018, 9:11 PM
DoTheRightThing's Avatar
DoTheRightThing DoTheRightThing is offline
 
Join Date: Jun 2010
Posts: 44
Quote:
Originally Posted by acottawa View Post
Not a walk in the park, but also 600M less than the tunnel for a more useful piece of infrastructure. Also, the surface route is probably less vulnerable to delays and cost overruns. You could spend 100M on additional mitigation and still be a half billion ahead.
Lot of assumptions there behind one's definition of "useful".
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:12 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.