HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #5861  
Old Posted Oct 24, 2018, 11:29 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
is anyone surprised this emphasis on LRT is actually about re-developing an area (not better transit for the area)?

the "successful" streetcar / tram lines in places like the often-cited Portland are only "successful" because the cities end up subsidising the local real estate developers to rebuild blocks along the line, adding density which in turn adds people who might end up using the tram. the cities end up spending billions on the new tram/ streetcar at the same time they are giving billions in incentives to get developers to rebuild the areas along the line

https://www.youtube.com/watch?v=RftqoygXXHk


https://www.youtube.com/watch?v=VpUQ_EMV23c
     
     
  #5862  
Old Posted Oct 25, 2018, 1:49 AM
ronthecivil ronthecivil is offline
Registered User
 
Join Date: Nov 2016
Posts: 69
Quote:
Originally Posted by officedweller View Post
The other thing about a Fraser Hwy Skytrain alignment - it's a straight shot.
No (or few) complicated designs for curves or special structures / bridges.
It's definately straight. The option they showed on the news this morning showed it being at grade through fraser timbers park and through the ALR (serpentine valley) section.

If it's at grade through the park, you can build it on the north side if you really want to kill a LOT of trees without too many issues. You would have to bridge over the crossing at 140th street but that's not too complicated.

However, I can tell you that building in the Serperentine River Valley is not fun. The soil has a consistantcy like peanut butter and it gets even weaker when distrurbed. Even to build a road your looking at doing a close mowing of the grass and then extensive preloading, with close controls of the final grading. So if you are relocating roads for this part, that's what you have to do.

To build a skytrain, it can be at grade, but it's still going to be on piles the whole way. No way the tolerences of the skytrain can deal with settlement, so even preloading or light weight fill aren't going to cut the mustard. That whole stretch will be piles. Might as well elevate it the whole way. And if you don't, you have to figure out how to elevate highway 15 instead, which isn't exactly much cheaper.

In short, the structures through the muck in the ALR are going to be geotechnical masterpeices......
     
     
  #5863  
Old Posted Oct 25, 2018, 1:54 AM
Galaxy's Avatar
Galaxy Galaxy is offline
Registered User
 
Join Date: Mar 2017
Location: Vancouver
Posts: 474
How much does it cost to build an OMC? Translink was going to have to build one for the existing Skytrain system with the new trains sets on order. Translink was also planning to build one for the Surrey LRT so now if they combine the two OMC projects into one big procurement design and build out would they save money? Also, would they get a better deal if they added the rolling stock for both the Millenium line UBC and Surrey Extension orders as a single order? Just thinking like when you buy just about anything the more you usually get the more of a better deal you can get from the manufacturer.
     
     
  #5864  
Old Posted Oct 25, 2018, 2:32 AM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
A lot of Rhetoric is being tossed around, as evident in the article below. There is no way the mayor's council will force Surrey to accept LRT when they clearly rejected it October 20th. No way the new mayors of each city would want the same thing to happen to them if they campaigned on changing course. Even if no new money is forthcoming, they can still build Skytrain along Fraser Hwy, just not all the way to Langley for this phase.


Switching from LRT to SkyTrain Could Delay Surrey Rail Expansion by a Decade

Vancouver British Columbia - One of the few returning mayors in Metro Vancouver has some advice for Surrey's mayor-elect, Doug McCallum, Switching from light rail transit to SkyTrain would be throwing away money and time already spent, while delaying expanded rail transit by years.

"The plan is approved, implemented, money has been spent on it," Richard Stewart, re-elected mayor of Coquitlam on Saturday, said.

"We're well down the path."

McCallum ran on a platform that included scrapping the at-grade Surrey-Newton-Guilford LRT plan to instead build a SkyTrain expansion from the King George station that would run to Langley.

McCallum has not returned phone calls made by Postmedia since Sunday.

The existing LRT agreement between the parties, including the province and TransLink's Mayors' Council, is based on Surrey's transportation plan.

Surrey Board of Trade CEO Anita Huberman told Postmedia News on Monday that flipping the $1.65 billion light rail transit project over would hinder the city's economic development goals.

The Mayors' Council is made up of 21 municipalities, the electoral area that includes UBC's Endowment Lands, and Tsawwassen First Nation.

It is the body that assembled the transportation plan in conjunction with the communities affected.

It approved Vancouver and Surrey rail expansion (SkyTrain on Broadway in Vancouver, light rapid transit in Surrey) along with bus and other expansions.

About $50 million has already been spent on LRT, according to TransLink.

Surrey has spent $20 million in pre-construction.

"I don't think it's a case of just switching technologies," from light rail to SkyTrain in Surrey, Stewart said.

"It will be interesting to see the argument put forward. I worry though that if someone succeeds in getting the current work cancelled, it could result in another decade of work to get SkyTrain for Surrey. It took a decade to get the current plan."

Stewart has a unique perspective on switching transportation projects midstream.

Light rail transit planning had begun in Coquitlam early last decade, but in 2008 the provincial government and TransLink announced SkyTrain would go ahead instead.

"The engineering work begins long before shovels break the ground," Stewart said.

"We'd done environment work and then had to throw out everything we had done. It took another decade from that decision to open the new line, it probably set us back six years. I would caution Surrey not to cancel the project, because that is what they would be doing."

If Surrey does go back to the chalkboard, get the region's mayors to agree on a SkyTrain plan, and then get the province's go-ahead, Surrey could use the money committed by the federal government for light rapid transit and instead use it for SkyTrain, Ken Hardie, MP for Fleetwood-Port Kells said on Tuesday.

The feds have committed $483.8 million to the 10.5 kilometre, 11 stop light street level rail project, with a completion target of 2024.

The project was proposed by then-mayor Dianne Watts in 2012.

"The money we have committed would be available for SkyTrain," Hardie said.

"But a number of steps would need to take place first."

Sixteen new mayors-elect were chosen in Metro Vancouver on Saturday night.

"That will make it interesting with so many new players at the Metro Vancouver board of directors table," Hardie said.

"As far as the federal government is concerned, if there is an agreement between the province and the region, unless something drastic changed, the federal government would be on board."

Gordon McIntyre.
     
     
  #5865  
Old Posted Oct 25, 2018, 2:33 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
At this point were would the OMC be? (Canada Line if it had only been SkyTrain technology).

How many 5-car trains does the OMC need to hold?
     
     
  #5866  
Old Posted Oct 25, 2018, 2:37 AM
BirchTrain BirchTrain is offline
Eat the sun
 
Join Date: Oct 2018
Posts: 61
Quote:
Originally Posted by ronthecivil View Post
It's definately straight. The option they showed on the news this morning showed it being at grade through fraser timbers park and through the ALR (serpentine valley) section.

If it's at grade through the park, you can build it on the north side if you really want to kill a LOT of trees without too many issues. You would have to bridge over the crossing at 140th street but that's not too complicated.

However, I can tell you that building in the Serperentine River Valley is not fun. The soil has a consistantcy like peanut butter and it gets even weaker when distrurbed. Even to build a road your looking at doing a close mowing of the grass and then extensive preloading, with close controls of the final grading. So if you are relocating roads for this part, that's what you have to do.

To build a skytrain, it can be at grade, but it's still going to be on piles the whole way. No way the tolerences of the skytrain can deal with settlement, so even preloading or light weight fill aren't going to cut the mustard. That whole stretch will be piles. Might as well elevate it the whole way. And if you don't, you have to figure out how to elevate highway 15 instead, which isn't exactly much cheaper.

In short, the structures through the muck in the ALR are going to be geotechnical masterpeices......
https://globalnews.ca/video/4589038/new-...pZ5ZMUofRyHPrD8Vyppsw7feS1aUueTJYxJEhpNE

I believe this was made by McCallum to cut down on costs for the SkyTrain. The estimate of 2.9 billion made by Translink assumed a fully elevated extension. I don’t think it’s a great idea to do at grade through the ALR either, given that the area will probably flood when sea levels rise from climate change.
     
     
  #5867  
Old Posted Oct 25, 2018, 3:27 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
Quote:
Originally Posted by ronthecivil View Post
If it's at grade through the park, you can build it on the north side if you really want to kill a LOT of trees without too many issues. You would have to bridge over the crossing at 140th street but that's not too complicated.

However, I can tell you that building in the Serperentine River Valley is not fun. The soil has a consistantcy like peanut butter and it gets even weaker when distrurbed. Even to build a road your looking at doing a close mowing of the grass and then extensive preloading, with close controls of the final grading. So if you are relocating roads for this part, that's what you have to do.

To build a skytrain, it can be at grade, but it's still going to be on piles the whole way. No way the tolerences of the skytrain can deal with settlement, so even preloading or light weight fill aren't going to cut the mustard. That whole stretch will be piles. Might as well elevate it the whole way. And if you don't, you have to figure out how to elevate highway 15 instead, which isn't exactly much cheaper.

In short, the structures through the muck in the ALR are going to be geotechnical masterpeices......
Same thing if you are going to build an at-grade LRT. LRT cannot deal with settlements either, and even if it's in the middle of the road, it still need to rebuild to reinforce as well as relocate everything that's under the track.

The at-grade and semi-at-grade section of Evergreen is just about as bad, or might be even worse, than the ALR. West of Inlet Centre was entirely done by piling and low elevated structures, even if it's officially "at-grade". Near Moody Centre, so much concrete was mixed into the soil so that the guideway won't sink due to unstable ground. The section where the guideway running at-grade might possibly be part of the Burrard Inlet long time ago before the ground raises after glacier melt since the last ice age.

Quote:
In Coquitlam, just east of Port Moody, engineers have found highly unstable soils. “We had a situation where soil conditions were highly liquefiable,” says Preece. The solution was to use timber densification on the soil. A 10-metre wide swath measuring 700 metres in length will have 12-15-metre long timbers driven into the ground at 1.2 metre intervals. A total of over 6,000 timber piles will be used to create seismic stability for the line’s guideways. While the technique of timber densification is not new and has also been used on the South Fraser Perimeter Road, “this is probably the most timber that has been used on a transit project,” he says.

Originally, the contract called for not using timbers because of a fear they would degrade. But EGRT was able to demonstrate that by ensuring the timbers in the ground remained wet, they would not be affected. The decision to use the timbers was made in collaboration with the province after other solutions did not provide the stability that was needed.

The technical director for the Province of B.C., Raymond Louie, says the solutions being implemented on the new line will “help our knowledge here” on rapid transit construction. One such application is soil mixing, which is more common in the U.S. but is having its first application in the Lower Mainland’s new transit line. Its use again arises from the need to bring sites in the Port Moody and Coquitlam area up to the seismic standards required. The process involves an on-site batch plant for low-strength concrete. The concrete is injected into the ground in columns, with the boring machine’s head able to inject the concrete and mix it with soil beginning at the bottom. The ensuing column will not only prevent the ground from moving but also provide vertical support for the guideways.

Soil mixing, which costs less than timber piles for soil stabilization, is being used on the portion of grade-level guideway by Golden Spike Lane that runs through Port Moody by the CPR tracks. Timbers are being used on a 750-foot stretch by rail tracks book-ended by the Balmoral Drive area through to Bond Street in Coquitlam.
https://www.canadianconsultingengineer.c...footing-metro-vancouvers-evergreen-line/

Last edited by nname; Oct 25, 2018 at 3:45 AM.
     
     
  #5868  
Old Posted Oct 25, 2018, 4:20 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,109
Geological map, if anybody's interested.
     
     
  #5869  
Old Posted Oct 25, 2018, 5:58 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,782
Quote:
Originally Posted by Migrant_Coconut View Post
Geological map, if anybody's interested.
Cool map, thanks!

Here's the legend for the various geologic types shown on the map.

And here's the page that describes the geologic types.
     
     
  #5870  
Old Posted Oct 25, 2018, 6:23 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
Wow, the mayor of Coquitlam kind of sounds bizarre.

Yes Coquitlam had to wait around 6 more years for their transit line to open, but for nearly the same cost ended up with a far superior system.

Also believe that Coquitlam at the time also welcomed the switch from LRT to Skytrain. Who is this guy?

Or is he playing the classic Burnaby style card where his community has what it needs and now he wants to cheap out on all other communities?

Also more of the same fear mongering rhetoric.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #5871  
Old Posted Oct 25, 2018, 7:47 AM
Colin4567 Colin4567 is offline
Registered User
 
Join Date: Oct 2017
Location: Lower Mainland-ish
Posts: 234
Quote:
Originally Posted by Metro-One View Post
Wow, the mayor of Coquitlam kind of sounds bizarre.

Yes Coquitlam had to wait around 6 more years for their transit line to open, but for nearly the same cost ended up with a far superior system.

Also believe that Coquitlam at the time also welcomed the switch from LRT to Skytrain. Who is this guy?

Or is he playing the classic Burnaby style card where his community has what it needs and now he wants to cheap out on all other communities?

Also more of the same fear mongering rhetoric.
I've talked to Richard quite a bit and essentially:
-he's pro-Burnaby gondola
-he's pro B-Lines having dedicated lanes for their 2019 opening and all other measures
-He's pro Broadway subway

But he thinks the Evergreen Line should have been LRT on the original Lougheed Highway route.
     
     
  #5872  
Old Posted Oct 25, 2018, 9:49 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
Quote:
Originally Posted by Trainguy View Post
A lot of Rhetoric is being tossed around, as evident in the article below. There is no way the mayor's council will force Surrey to accept LRT when they clearly rejected it October 20th. No way the new mayors of each city would want the same thing to happen to them if they campaigned on changing course.
Honestly, I think they're just panicking. After a history of LRT plans being replaced by SkyTrain through an override that usually happened through a senior government switch of some sort, now we have the same override but now it is a result of the will of the municipal government and the people who elected them. I do believe this is a first in our region! And as such it is also a situation we are not familiar with handling. The one example that might come to mind in Canada would be Toronto (the Scarborough/Rob Ford debacle), and the other Mayors probably have fears of a Rob Ford style scenario happening but at the end of the day you just cannot frame the Surrey situation in the same way. I don't recall Torontonians mass rejecting Transit City (Toronto's LRT vision), whereas in Surrey/Langley residents perceived the entire Surrey LRT vision to be seriously flawed and many people really did vote to have it scrapped, regardless of the costs and risks to funding (both of these caveats were publicized extremely well in advance of the election).

The one thing that everyone seems to be forgetting is that the replacement project (SkyTrain) probably offers more benefits to the region as a whole. The SNG LRT was meant to serve transit patterns within Surrey but have little to no contribution outside of Surrey. With a SkyTrain extension, there would be spill-off benefits as suddenly areas of Surrey and Langley have transit access to regional job centres and there's an economic boost that likely goes beyond the South-of-Fraser region. I am hoping that there are some mayors that will appreciate that. If Burnaby's Mayor does (and I think he will, Metrotown and Brentwood will see some of the activity generated by the UBC and Langley extensions and would reap immense economic benefits), that's 12 votes and it would be enough to make the SkyTrain switch go ahead.

One other thing I am really bothered about is how there is suddenly no one bringing up how Surrey is the one being "left behind" in the region or is "paying their share but not getting enough in return". It's funny that not even the ones who were really enthusiastic about pushing that viewpoint before (ahem, Watts, ahem) are talking about that anymore. It's suddenly a forgotten policy standpoint. I'm pretty sure people in Surrey still have this sentiment at large in their minds, and those who do not follow will be punished if they don't deliver (feds, you'd better stay on our side).

Last edited by xd_1771; Oct 25, 2018 at 10:14 AM.
     
     
  #5873  
Old Posted Oct 25, 2018, 3:11 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by xd_1771 View Post
Honestly, I think they're just panicking. After a history of LRT plans being replaced by SkyTrain through an override that usually happened through a senior government switch of some sort, now we have the same override but now it is a result of the will of the municipal government and the people who elected them. I do believe this is a first in our region! And as such it is also a situation we are not familiar with handling. The one example that might come to mind in Canada would be Toronto (the Scarborough/Rob Ford debacle), and the other Mayors probably have fears of a Rob Ford style scenario happening but at the end of the day you just cannot frame the Surrey situation in the same way.
Important to note that Toronto has always had some manner of street-car/light-rail system, and thus pushing LRT there is an easier sell on the "cheaper" argument. However Rob Ford was right, Expanding the Subway is, and always will be the better option. It's also important to note that they also don't have interlined Subway systems, they have effectively three separate Subways, and the problem with the Scarborough RT was that it was intentionally run poorly, into the ground, and thus people saw it just an annoying transfer to get anywhere to/from the Scarborough area. That was not rejection of "Skytrain" there, but rather just calling a spade a spade and recognizing that they should have built the subway all the way there in the first place instead of experimenting with LRT, but hey without that line there would have been no Vancouver Skytrain so it is what it is.

Sounds familiar to what Surrey would have been saddled with anyway. Surrey would have wound up with a LRT system that people largely hate because it was an extra transfer that takes them nowhere. If the Skytrain comes every 75 seconds at maximum, you still get stuck waiting in Surrey for 7 minutes on each end. At the slowest the Skytrain is like 6 minutes, where as the Surrey LRT would have been 15 minutes all day except the rush hour. That's only a minor improvement over the bus schedule, and still assumed perfect reliability, which LRT's are lucky to have any when they're at grade.

It's like nobody wants to learn from history. Use only one kind of rolling stock that can be swapped out as it ages. London, New York and Toronto have all had to learn this lesson. We're going to see the Scarborough RT problem here with the Canada Line as well, since even though new cars can be ordered, that will only go to increase capacity. When it comes time to refurbish the cars, that will come at a reduction in capacity of the line since the cars will have to be physically removed from the line and transported somewhere to be torn down and refurbished. Can't just transfer some of Expo Line's rolling stock to it to make up for it, nor borrow some Subway cars from someone else.

So if the Surrey Line can be an extension of the Expo line to Langley, there can be expansions options put in to eventually have lines that go directly to Newton/Guildford in Surrey and White Rock.

But it's also important to point out that Langley is important as a gateway to the Fraser Valley, as 67% of travel trips from Metro Vancouver go to Abbotsford.

https://www.bctransit.com/documents/1507213420730

     
     
  #5874  
Old Posted Oct 25, 2018, 7:10 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Quote:
Originally Posted by Kisai View Post
Important to note that Toronto has always had some manner of street-car/light-rail system, and thus pushing LRT there is an easier sell on the "cheaper" argument. However Rob Ford was right, Expanding the Subway is, and always will be the better option. It's also important to note that they also don't have interlined Subway systems, they have effectively three separate Subways, and the problem with the Scarborough RT was that it was intentionally run poorly, into the ground, and thus people saw it just an annoying transfer to get anywhere to/from the Scarborough area. That was not rejection of "Skytrain" there, but rather just calling a spade a spade and recognizing that they should have built the subway all the way there in the first place instead of experimenting with LRT, but hey without that line there would have been no Vancouver Skytrain so it is what it is.

Sounds familiar to what Surrey would have been saddled with anyway. Surrey would have wound up with a LRT system that people largely hate because it was an extra transfer that takes them nowhere. If the Skytrain comes every 75 seconds at maximum, you still get stuck waiting in Surrey for 7 minutes on each end. At the slowest the Skytrain is like 6 minutes, where as the Surrey LRT would have been 15 minutes all day except the rush hour. That's only a minor improvement over the bus schedule, and still assumed perfect reliability, which LRT's are lucky to have any when they're at grade.

It's like nobody wants to learn from history. Use only one kind of rolling stock that can be swapped out as it ages. London, New York and Toronto have all had to learn this lesson. We're going to see the Scarborough RT problem here with the Canada Line as well, since even though new cars can be ordered, that will only go to increase capacity. When it comes time to refurbish the cars, that will come at a reduction in capacity of the line since the cars will have to be physically removed from the line and transported somewhere to be torn down and refurbished. Can't just transfer some of Expo Line's rolling stock to it to make up for it, nor borrow some Subway cars from someone else.

So if the Surrey Line can be an extension of the Expo line to Langley, there can be expansions options put in to eventually have lines that go directly to Newton/Guildford in Surrey and White Rock.

But it's also important to point out that Langley is important as a gateway to the Fraser Valley, as 67% of travel trips from Metro Vancouver go to Abbotsford.

https://www.bctransit.com/documents/1507213420730

Not sure how the LRT ever got approved. No one ever ask for my vote until this election and I voted the right way. Extending Skytrain to Langley and other areas is the smart move as mentioned above because equipment is common. The roads are not messed with like KG and 104th ave. For what LRT was going to provide was not worth the $1.6B. The NBA (Newton) is screaming because they seem to speak for everyone in Newton. Obviously not because the election speaks for itself. November is going to be a wild ride. Exciting times ahead.
     
     
  #5875  
Old Posted Oct 25, 2018, 9:50 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
Quote:
Originally Posted by Migrant_Coconut View Post
Geological map, if anybody's interested.
Nice, thanks.

Port Moody, Richmond and Scott Road area of Surrey all appear to have soft soils too (not to mention Terminal Ave).
Remember that Surrey was chosen as a "Growth Concentration Area" under the Livable Region Strategic Plan because it's largely on bedrock.


https://www.cgenarchive.org/uploads/2/5/2/6/25269392/themap.jpg
     
     
  #5876  
Old Posted Oct 25, 2018, 10:06 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,109
Yeah, the ALR segment's going to be a problem. Though unless there's information we're not privy to, I don't see why a trench or viaduct would be any harder to build than Scott Road or Richmond/Sea Island.
     
     
  #5877  
Old Posted Oct 25, 2018, 10:56 PM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
One question; Does anyone know if the new SOF Skytrain is going to be the L-line (but the line turned into Skytrain), or a Fraser Highway alignment?

I'm pretty sure this depends on the land acquisition; someone showed a graph showing the land acquisition for Surrey LRT *should* have been completed, meaning that it's the L-line, not the Fraser HWY alignment.

But everyone seems to prefer the Expo Extension.
     
     
  #5878  
Old Posted Oct 25, 2018, 11:16 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Quote:
Originally Posted by fredinno View Post
One question; Does anyone know if the new SOF Skytrain is going to be the L-line (but the line turned into Skytrain), or a Fraser Highway alignment?

I'm pretty sure this depends on the land acquisition; someone showed a graph showing the land acquisition for Surrey LRT *should* have been completed, meaning that it's the L-line, not the Fraser HWY alignment.

But everyone seems to prefer the Expo Extension.
My understanding of what Doug M promised is to cancel anything to do with the L Line and start building east from KG on the Expo line.
     
     
  #5879  
Old Posted Oct 25, 2018, 11:45 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,589
Quote:
Originally Posted by Trainguy View Post
My understanding of what Doug M promised is to cancel anything to do with the L Line and start building east from KG on the Expo line.
Yeah he promised to cancel the L Line and extend the Expo Line towards Langley.
     
     
  #5880  
Old Posted Oct 26, 2018, 1:59 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by Sheba View Post
Yeah he promised to cancel the L Line and extend the Expo Line towards Langley.
Would the L-line provisions be maintained for Skytrain on the L-line? (I guess so, but it might take 20 years to get the L-line built if the Expo is the way to go)- I mean, they bought what I presume were provisions for LRT Stations- the Skytrain Stations are the same as the LRT Stations, at least in spacing, so I'd assume they use the same land.


Then again, long-term thinking is a weakness of these regions' municipalities.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:34 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.