  #181  
Old Posted Oct 9, 2018, 4:33 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 124 Oct 9

I am not counting weekend work as full construction days.

Sand is being placed in the Dundas & Talbot intersection



Reply With Quote
     
     
  #182  
Old Posted Oct 9, 2018, 7:18 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,360
They did say sometime back the Talbot intersection would be open first, so they must be planning to brick it and then move west along Dundas.
Reply With Quote
     
     
  #183  
Old Posted Oct 9, 2018, 10:36 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,994
Quote:
Originally Posted by Djeffery View Post
The flex street basically starts at the crosswalk at Ridout and Dundas, not into the intersection. No roadway changes to Ridout at all. Also, the entire surface is bricks (with concrete underneath as seen in the photos) and level. The traffic lanes and the sidewalks aren't really going to be physically separated by a curb, but by distinctive brick design. Which could make it pretty interesting in snow conditions. And for sure, people will probably pull over onto the pedestrian walkway to run into stores "because I'm only going to be a minute".
Sorry I screwed up the question. I was thinking that was Ridout but it`s Talbot. So I`ll try this again...……………...are the widened sidewalks taking up parking spots and if so are they putting in 2 lanes in one-direction or one lane in both?
Reply With Quote
     
     
  #184  
Old Posted Oct 10, 2018, 12:38 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,360
Quote:
Originally Posted by ssiguy View Post
Sorry I screwed up the question. I was thinking that was Ridout but it`s Talbot. So I`ll try this again...……………...are the widened sidewalks taking up parking spots and if so are they putting in 2 lanes in one-direction or one lane in both?
The renderings on dundasplace.ca show parking, although I don't know if it will be the same amount as now. Dundas, when it's open to traffic, will be a lane in each direction as it was before.
Reply With Quote
     
     
  #185  
Old Posted Oct 10, 2018, 4:59 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 125 Oct 10

Brick laying on Dundas & Tabot has stated







Reply With Quote
     
     
  #186  
Old Posted Oct 11, 2018, 4:47 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 126 Oct 11

Paving operations have begun east of Talbot



Reply With Quote
     
     
  #187  
Old Posted Oct 12, 2018, 5:19 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 127 Oct 12

Concrete pouring continues west of Talbot, lots of other things going on too! Moving quickly now.











Reply With Quote
     
     
  #188  
Old Posted Oct 12, 2018, 10:19 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,360
Talbot st will open this coming Wednesday, the 17th, to traffic in both directions. At the same time, Richmond will be closed at Dundas in both directions until the end of the construction season. Dundas and Richmond intersection will be paved with asphalt for the winter and then the concrete and brick will be added next spring during phase 2. Work is supposed to be going 24/6 (Sundays off) until the end of the season.
Reply With Quote
     
     
  #189  
Old Posted Oct 15, 2018, 4:15 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 128 Oct 15

A crummy day out but brick work is almost done at Talbot & Dundas intersection



Reply With Quote
     
     
  #190  
Old Posted Oct 16, 2018, 4:46 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 129 Oct 16

Talbot intersection is scheduled to open tomorrow





Apologies about the glare, bright day!
Reply With Quote
     
     
  #191  
Old Posted Oct 17, 2018, 4:47 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 130 Oct 17

Talbot street is open as expected, brick work continues on the roadway





Reply With Quote
     
     
  #192  
Old Posted Oct 18, 2018, 4:42 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 131 Oct 18

Walked to McDerps on my lunch today for free fries.. walkup window is closed due to construction so had to mingle in the store with the D&R folk lol

Lots of activity












Last edited by haljackey; Oct 18, 2018 at 5:12 PM.
Reply With Quote
     
     
  #193  
Old Posted Oct 19, 2018, 4:49 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 132 Oct 19

Finishing touches west of Talbot, concrete work east of Talbot







Reply With Quote
     
     
  #194  
Old Posted Oct 19, 2018, 6:01 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,994
This really is looking great.
Reply With Quote
     
     
  #195  
Old Posted Oct 19, 2018, 9:36 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,360
Quote:
Originally Posted by ssiguy View Post
This really is looking great.
I agree. I was really having trouble picturing what they were going to actually do. I'm glad for the flower boxes and light standards though because I don't think the concrete curb being flush with the pavers would be enough to show people where the roadway is. I am a but surprised that there isn't a straight line of one shade of bricks running down the centre of the road as a dividing line though. I think some people might have a drifting problem across the centre of the road.
Reply With Quote
     
     
  #196  
Old Posted Oct 20, 2018, 2:10 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Quote:
Originally Posted by Djeffery View Post
I agree. I was really having trouble picturing what they were going to actually do. I'm glad for the flower boxes and light standards though because I don't think the concrete curb being flush with the pavers would be enough to show people where the roadway is. I am a but surprised that there isn't a straight line of one shade of bricks running down the centre of the road as a dividing line though. I think some people might have a drifting problem across the centre of the road.
Renderings show a yellow line painted on the bricks, at least near intersections.


Weekly update:
https://www.dundasplace.ca/single-post/2018/10/19/Making-progress-brick-by-brick

Glad you have been enjoying the pics too!
Reply With Quote
     
     
  #197  
Old Posted Oct 22, 2018, 4:47 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 133 Oct 22

Paving work continues on both sides of Dundas east of Talbot





Reply With Quote
     
     
  #198  
Old Posted Oct 23, 2018, 5:03 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 134 Oct 23

Muddy - no concrete walkways for a portion of Dundas



Reply With Quote
     
     
  #199  
Old Posted Oct 24, 2018, 4:30 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 135 Oct 24

Brick work starting east of Talbot





Reply With Quote
     
     
  #200  
Old Posted Oct 25, 2018, 4:27 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,492
Day 136 Oct 25

Lighting work in progress today



Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:12 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.