Old Posted Oct 16, 2018, 12:24 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,687
Quote:
Originally Posted by CityTech View Post
Not to sound a little crass, but how many C-Train deaths are suicides? That's a different issue than accidents.
Some of these might be suicides, some might be accidents. However, sad as these cases are, the trains do come to a standstill during investigation every time this happens, potentially affecting the entire city and the reliability of the system. Calgary' predicament is due to being penny wise and pound foolish
     
     
  #8422  
Old Posted Oct 16, 2018, 12:49 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Kitchissippi View Post
Some of these might be suicides, some might be accidents. However, sad as these cases are, the trains do come to a standstill during investigation every time this happens, potentially affecting the entire city and the reliability of the system. Calgary' predicament is due to being penny wise and pound foolish
I was trying to find the actual difference. An opinion article claimed 1/3 were suicides, but had no facts to back it up. If that is the number, then that's quite concerning as that's a lot of accidental deaths. Toronto's subway has more deaths, but they are essentially all suicides and of course it's a much larger population

Ottawa will be an interesting comparison. While i expect there will definitely be suicide attempts, and some will succeed, the low floor nature of our system makes it way easier to yank someone back onto the platform. Then again, there's been no recorded otrain fatalities afaik in it's 17 years of operation
     
     
  #8423  
Old Posted Oct 16, 2018, 1:41 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by kmcamp View Post
I was trying to find the actual difference. An opinion article claimed 1/3 were suicides, but had no facts to back it up. If that is the number, then that's quite concerning as that's a lot of accidental deaths. Toronto's subway has more deaths, but they are essentially all suicides and of course it's a much larger population

Ottawa will be an interesting comparison. While i expect there will definitely be suicide attempts, and some will succeed, the low floor nature of our system makes it way easier to yank someone back onto the platform. Then again, there's been no recorded otrain fatalities afaik in it's 17 years of operation
Good Day.
Each system, be it LRT, SkyTrain, subway, Metro, etc. has gathered and analysed their own statistics concerning accident .vs. suicide, with the assistance of police and psychologists. Real numbers from most of those analyses have mostly only been alluded to or referenced, not really fully released. For reasons which can mostly be agreed with (copycat, seeming encouragement, a how-to, etc.). It can be stated anecdotally that a significant percentage are or seem to be suicide.
In our case, it is indeed a good thing that we are grade-separated, and it is a good reason to continue to do so, aside from any consideration of car-train interactions (stupidity rampant), political demonstrations and activism in the downtown, or other system delays. Yes, it costs more, and as the article discussed..... it must be decided if the trade-off is desirable/cost-effective. We have already penny-pinched in the determination of no platform door system, at the least for the downtown stations.

As for the T-Line.... IIRC we have indeed had approximately 2 deaths over the 17 years, causing shutdown, and cause never released.

.
     
     
  #8424  
Old Posted Oct 18, 2018, 3:49 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
     
     
  #8425  
Old Posted Oct 18, 2018, 4:03 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
They're still using that old-school looking POP logo. That's funny.
     
     
  #8426  
Old Posted Oct 18, 2018, 4:26 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,687
Some photos I took the other day.

Blair is where you can currently get as close to a train as possible, at the access to the ped bridge over the Queensway. I still think these trains look a bit unfinished, surely there must be more covering on the top as they seem vulnerable to snow build up, and there must be another external accordion covering on the bendy part that conceals the hoses?






Pimisi Station landscaping is looking good, too.

     
     
  #8427  
Old Posted Oct 18, 2018, 11:53 PM
Vixx Vixx is offline
Registered User
 
Join Date: Sep 2017
Location: Wild Rose Country/Worst Case Ontario
Posts: 398
Awesome pictures! Aesthetically, the majority of the stations look nice.
     
     
  #8428  
Old Posted Oct 19, 2018, 3:00 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,633
Bayview and Pimisi look spectacular IMO. I think it will be amazing to start with such a great looking and functional pieces and build the neighbourhood out from there. Let's see some shovels in the ground soon at Lebreton/Trinity! Time for a new arena too!
     
     
  #8429  
Old Posted Oct 19, 2018, 3:21 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day.

@Kitchissippi
Good photos.... Thx.
As for the exposure/open structure of the vehicles.... yup, that has been long noted.
And I do believe that what you see in your photo is indeed the final complete vehicle.
I guess they are depending on travel and flexure to keep the parts relatively snow and ice clear.
As always.... <snort> We Shall See !!
     
     
  #8430  
Old Posted Oct 19, 2018, 3:25 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day.

An interesting article printed by Hamilton's Raise The Hammer,
Fraser Pollock, 19 October 2018, apparently an Ottawa resident :

With Love from Ottawa: Lessons on Challenges of Upgrading BRT to LRT

http://www.raisethehammer.org/article/35...ns_on_challenges_of_upgrading_brt_to_lrt

EnJoy!
     
     
  #8431  
Old Posted Oct 19, 2018, 11:37 AM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
http://www.raisethehammer.org/article/35...ns_on_challenges_of_upgrading_brt_to_lrt
Quote:
With Love from Ottawa: Lessons on Challenges of Upgrading BRT to LRT
One of the key issues with BRT is that you are forced to spend a lot more money to continuously upgrade the BRT right of way as passenger levels grow.

By Fraser Pollock
Published October 19, 2018
     
     
  #8432  
Old Posted Oct 19, 2018, 4:16 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Noticed two new "O" pylons. St-Laurent now has one at the local bus level entrance. It's visible form the Queensway. They've also added a second one at Blair next to the entrance near the bike parking (a few meters south of the first one that had been installed a while back).
     
     
  #8433  
Old Posted Oct 19, 2018, 7:51 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,050
That looks like at least a month away from full completion.
     
     
  #8434  
Old Posted Oct 19, 2018, 8:33 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Truenorth00 View Post
That looks like at least a month away from full completion.
That is probably because it is at least a month from when it will be completed.
     
     
  #8435  
Old Posted Oct 19, 2018, 9:11 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post
Noticed two new "O" pylons. St-Laurent now has one at the local bus level entrance. It's visible form the Queensway. They've also added a second one at Blair next to the entrance near the bike parking (a few meters south of the first one that had been installed a while back).
Hurdman has gained one too on the North side entrance
     
     
  #8436  
Old Posted Oct 20, 2018, 1:26 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Those pylons are so simple yet seem like such a milestone!
     
     
  #8437  
Old Posted Oct 20, 2018, 2:02 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
A few from the Confederation Line update.

Pimisi



Rideau



St-Laurent





https://www.ligneconfederationline.ca/news/construction-update-196/
     
     
  #8438  
Old Posted Oct 20, 2018, 2:30 AM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,050
Quote:
Originally Posted by roger1818 View Post
That is probably because it is at least a month from when it will be completed.
Indeed. But once again, little to no schedule slack. Which makes the risk of more delays high. I was hoping they'd at least have the exeriors completely finished before the first flurries hit.
     
     
  #8439  
Old Posted Oct 20, 2018, 3:35 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Truenorth00 View Post
Indeed. But once again, little to no schedule slack. Which makes the risk of more delays high.
It depends how long the delay is until completion. If the transfer date is in January, they could finish the stations by the end of November and still have a month of wiggle room. If the date is even later, it buys them even more time.

Quote:
I was hoping they'd at least have the exeriors completely finished before the first flurries hit.
The first flurries seems needlessly early a objective. Before the snow sticks seems more reasonable for finishing exteriors, and that’s typically mid December (though it has been earlier). Certainly if they finish the exteriors by mid November, they should be safe.
     
     
  #8440  
Old Posted Oct 21, 2018, 8:34 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,050
Quote:
Originally Posted by roger1818 View Post
It depends how long the delay is until completion. If the transfer date is in January, they could finish the stations by the end of November and still have a month of wiggle room. If the date is even later, it buys them even more time.
You would think they would be getting pressured sufficiently on the transfer date. Especially given the penalties being exercised and the fact that the city is not waving the testing requirements. If they aren't, that's the city's fault at that point.

I should think the city would be worried with RTG's lackadaisical approach that keeps forcing an opening further into the winter. We're easily looking at probably an early Feb opening now. Do they want it even further into Feb?


Quote:
Originally Posted by roger1818 View Post
The first flurries seems needlessly early a objective. Before the snow sticks seems more reasonable for finishing exteriors, and that’s typically mid December (though it has been earlier). Certainly if they finish the exteriors by mid November, they should be safe.
From the looks of it, I am not sure they'll finish the exteriors by mid-November. That's what I meant. As it stands, I am sure some landscaping is being deferred to the spring with overnight freezing now happening.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:43 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.