I see the Scotiabank logo is up along the north side now. I'm guessing they'll do the south side today as well?
Reply With Quote
     
     
  #5322  
Old Posted Oct 5, 2018, 5:36 PM
BigG's Avatar
BigG BigG is offline
Ignore these four words.
 
Join Date: Mar 2004
Location: Fort Garryish
Posts: 1,110
New page.




Reply With Quote
     
     
  #5323  
Old Posted Oct 5, 2018, 6:02 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,344
Quote:
Originally Posted by esquire View Post
I see the Scotiabank logo is up along the north side now. I'm guessing they'll do the south side today as well?
They put the swing stage and scaffolding back up last week or maybe the week before, on the south side over the church. Looks ready to put the signage up, but no action today. Seeing as workers typically leave site at 3:00pm, I'd bet it will be next week.
Reply With Quote
     
     
  #5324  
Old Posted Oct 6, 2018, 8:10 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is offline
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 8,289

John (@john_paul_photo_addict) on Instagram
Reply With Quote
     
     
  #5325  
Old Posted Oct 7, 2018, 8:19 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
I heard that Starbucks is going to be going in TNS, can't confirm that 100% though. Still seems odd they'd close the other location way before opening a new one.
Reply With Quote
     
     
  #5326  
Old Posted Oct 7, 2018, 9:28 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,523
Quote:
Originally Posted by buzzg View Post
I heard that Starbucks is going to be going in TNS, can't confirm that 100% though. Still seems odd they'd close the other location way before opening a new one.
not really if a lease runs out a lease runs out
Reply With Quote
     
     
  #5327  
Old Posted Oct 9, 2018, 2:40 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,344
Edit: oopsy.
Reply With Quote
     
     
  #5328  
Old Posted Oct 12, 2018, 7:01 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,344
Skywalk connection in City Place looking out towards TNS.

Reply With Quote
     
     
  #5329  
Old Posted Oct 12, 2018, 7:18 PM
oftheMoon's Avatar
oftheMoon oftheMoon is offline
Registered User
 
Join Date: May 2013
Location: East Exchanger
Posts: 675
Quote:
Originally Posted by bomberjet View Post
Skywalk connection in City Place looking out towards TNS.

With retail/office space for lease within cityplace on the north side of that walkway.
Reply With Quote
     
     
  #5330  
Old Posted Oct 15, 2018, 7:17 PM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
Why is Scotia's sign on the North Face, where it's always in shade and blocked by the taller tower?
Reply With Quote
     
     
  #5331  
Old Posted Oct 15, 2018, 7:55 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
^ Based on the renderings and the space roughed in for signage, it appears that one will also go on the south side as well.
Reply With Quote
     
     
  #5332  
Old Posted Oct 15, 2018, 9:32 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,344
There will be a large sign that reads Scotiabank on the south side. North side is just the logo I think?

They're have a swing stage and scaffolding up for a couple weeks now in prep. Still no sign of the sign. ha
Reply With Quote
     
     
  #5333  
Old Posted Oct 16, 2018, 3:10 PM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
Makes sense, but I thought the east and west sides need them more anyway, since that's all the Portage traffic
Reply With Quote
     
     
  #5334  
Old Posted Oct 17, 2018, 6:57 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
It's too bad they didn't open up the north side of cityplace with windows (like old CV office) to have an open, airy feeling drawing people into TNS.
Reply With Quote
     
     
  #5335  
Old Posted Oct 17, 2018, 8:21 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,276
Quote:
Originally Posted by buzzg View Post
It's too bad they didn't open up the north side of cityplace with windows (like old CV office) to have an open, airy feeling drawing people into TNS.
That would go a really long way to making hargrave more inviting and would really make a nice visual cue for those walking towards tns
__________________
"Enlightened statesmen will not always be at the helm."
Federalist #10, James Madison
Reply With Quote
     
     
  #5336  
Old Posted Oct 18, 2018, 3:21 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,344
Drill rig is on site at Sutton Place. Probably geotech work going on. Things are moving.
Reply With Quote
     
     
  #5337  
Old Posted Oct 18, 2018, 7:39 PM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
Quote:
Originally Posted by bomberjet View Post
Drill rig is on site at Sutton Place. Probably geotech work going on. Things are moving.
Exciting times ahead. Would love to have more travellers downtown!
Reply With Quote
     
     
  #5338  
Old Posted Oct 18, 2018, 8:02 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,922
Quote:
Originally Posted by bomberjet View Post
Drill rig is on site at Sutton Place. Probably geotech work going on. Things are moving.
Geotech work should have been done LONG ago if actual construction is imminent.

Geotech - design - drawings - submit to City - review period - permit - start construction.
Reply With Quote
     
     
  #5339  
Old Posted Oct 18, 2018, 8:46 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,344
Weren't they doing test holes at each caisson for TNS while they were doing excavation and shoring? Confirming bedrock depth and condition? Would seem to be a similar timeline here maybe. I don't know. How imminent is actual construction beyond the fall timeline we've heard?
Reply With Quote
     
     
  #5340  
Old Posted Oct 18, 2018, 9:30 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,344
This guy from Paddock is out there.

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 3:29 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.