Quote:
Originally Posted by jammer139
Between Richmond and Talbot ain't happening before the snows. They might want to start early next year east of Richmond if they want to finish all 4 blocks by end of next construction season.
|
I wonder if that's why they haven't been putting the bricks down on the roadway portion west of Talbot. Maybe they are looking at just getting the concrete base down east of Talbot before winter and driving on that until next spring. At the very least, the underground work in the Richmond intersection will be done, so next year it's a bit less than 2 full blocks and only one intersection that need to get done.
Hopefully we get York open before winter.