  #161  
Old Posted Sep 24, 2018, 4:30 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 110 Sept 24

Crosswalk at Talbot has shifted to the west side. First time you can walk on the new concrete and bricks!



__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Sep 26, 2018 at 12:37 AM.
Reply With Quote
     
     
  #162  
Old Posted Sep 25, 2018, 4:28 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 111 Sept 25

Rainy but work getting done. More brick laying by Bud Gardens and wooden frames being set up for crosswalks on the east side of Talbot.



__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Sep 26, 2018 at 12:36 AM.
Reply With Quote
     
     
  #163  
Old Posted Sep 25, 2018, 8:56 PM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,313
Flip your directions from yesterday and today.
Reply With Quote
     
     
  #164  
Old Posted Sep 26, 2018, 12:37 AM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Quote:
Originally Posted by Djeffery View Post
Flip your directions from yesterday and today.
Wow, my mental compass sucks this week. Thanks! Fixed.
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #165  
Old Posted Sep 26, 2018, 4:51 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 112 Sept 26

Work on all crosswalk curbs now in progress



__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #166  
Old Posted Sep 28, 2018, 4:08 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 117 Sept 27

Half of Talbot and Dundas paved





-----

Day 118 Sept 28

All of Talbot and Dundas paved



__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #167  
Old Posted Oct 1, 2018, 4:35 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 119 Oct 1

It's October! Will it really be ready next month?



__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #168  
Old Posted Oct 2, 2018, 4:21 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 120 Oct 2

Not too much in this area changed between yesterday and today, but curb work continues



__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #169  
Old Posted Oct 2, 2018, 6:13 PM
inimrepus inimrepus is offline
Registered User
 
Join Date: Jan 2017
Location: Earth
Posts: 175
I don't see how they are going to finish in a month, but it looks great.
Reply With Quote
     
     
  #170  
Old Posted Oct 2, 2018, 6:27 PM
ssiguy ssiguy is online now
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,965
So the spotted pavement is widen sidewalks? If so does Ridout become one-way, one lane, with no parking and if so will it be going north or south?
Reply With Quote
     
     
  #171  
Old Posted Oct 3, 2018, 4:54 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Quote:
Originally Posted by ssiguy View Post
So the spotted pavement is widen sidewalks? If so does Ridout become one-way, one lane, with no parking and if so will it be going north or south?
No changes to Ridout as far as I know

-----

Day 121 Oct 3

Ground leveling efforts between Talbot and Richmond







__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #172  
Old Posted Oct 3, 2018, 8:57 PM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,313
Quote:
Originally Posted by ssiguy View Post
So the spotted pavement is widen sidewalks? If so does Ridout become one-way, one lane, with no parking and if so will it be going north or south?
The flex street basically starts at the crosswalk at Ridout and Dundas, not into the intersection. No roadway changes to Ridout at all. Also, the entire surface is bricks (with concrete underneath as seen in the photos) and level. The traffic lanes and the sidewalks aren't really going to be physically separated by a curb, but by distinctive brick design. Which could make it pretty interesting in snow conditions. And for sure, people will probably pull over onto the pedestrian walkway to run into stores "because I'm only going to be a minute".
Reply With Quote
     
     
  #173  
Old Posted Oct 3, 2018, 10:37 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,332
Between Richmond and Talbot ain't happening before the snows. They might want to start early next year east of Richmond if they want to finish all 4 blocks by end of next construction season.
Reply With Quote
     
     
  #174  
Old Posted Oct 4, 2018, 2:07 AM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,313
Quote:
Originally Posted by jammer139 View Post
Between Richmond and Talbot ain't happening before the snows. They might want to start early next year east of Richmond if they want to finish all 4 blocks by end of next construction season.
I wonder if that's why they haven't been putting the bricks down on the roadway portion west of Talbot. Maybe they are looking at just getting the concrete base down east of Talbot before winter and driving on that until next spring. At the very least, the underground work in the Richmond intersection will be done, so next year it's a bit less than 2 full blocks and only one intersection that need to get done.

Hopefully we get York open before winter.
Reply With Quote
     
     
  #175  
Old Posted Oct 4, 2018, 9:47 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 122 Oct 4

Brick laying up to the cross walk now and light fixtures being installed





__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #176  
Old Posted Oct 5, 2018, 4:45 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 123 Oct 5

Traffic lights being installed, sand going between bricks





__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #177  
Old Posted Oct 5, 2018, 4:57 PM
GeneralLea's Avatar
GeneralLea GeneralLea is online now
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,976
Man, that's looking great, thanks for the updates!
__________________
"Living life on the edge"
Reply With Quote
     
     
  #178  
Old Posted Oct 6, 2018, 11:44 PM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,313
Weekly blog says they will be working weekends through October to try to make up time from some rain delays.
Reply With Quote
     
     
  #179  
Old Posted Oct 7, 2018, 6:52 PM
ssiguy ssiguy is online now
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,965
So if there is no traffic changes does this mean that the widened sidewalks are just away street parking?
Reply With Quote
     
     
  #180  
Old Posted Oct 7, 2018, 6:57 PM
ssiguy ssiguy is online now
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,965
Quote:
Originally Posted by inimrepus View Post
I don't see how they are going to finish in a month, but it looks great.
I think the city will force them to work 24/7 to make sure it does or the downtown merchants will howl over the loss of the crucial Christmas shopping days and with good reason. I imagine that`s why the whole thing was promised to be done by November as there is no way in hell the merchants would allow a mess like what we have now during the busiest time of the shopping year. If they don`t finish on time then the law suits will begin and I`m sure the city knows it.

Anyway, it looks FANTASTIC!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:35 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.