Quote:
Originally Posted by Hatman
Sounds like the UVX route is doing well:
UTA finds a way to fill buses — offer free fare and frequent service
https://www.sltrib.com/news/politics/2018/09/25/uta-finds-way-fill-buses/
Who would have thought it? Free and frequent buses actually do get used. I think that by opening the BRT route before the BRT sections of it were complete, UTA has proven to themselves that with no fares, higher frequency, and perhaps a bit of descent branding people will ride the bus at rates many multiples of what is currently occurring.
I hope we don't need to wait until 200 miles of BRT are built in order to spread these benefits system-wide. This single 10-mile route has taken a decade and a half of planning and construction, so if they really do want to build 200 miles of bus-exclusive lanes then it will take then roughly until 2318 to finish that project. The 'bus-plus' of simply applying the principles of good transit (free, frequent, obvious stations with the obvious convenience features, etc) ought to become UTA's top priority now (besides the $3 billion FrontRunner project, of course!).
|
I do hope that we see progress this next Legislative Session for funds to possibly go towards double tracking and electrifying FrontRunner. I would also expect that some funds may also go to an extension of the Trax Blue Line into Utah County, this may come with an automatic sales tax increase or 2 for Utah County though.
In the mean time to help boost ridership, I would think it might be good for UTA to use some of their funds from the 40/40/20 split starting in July of next year to begin further exploration and planning for Free Fares in SL County.
They are currently buying additional CNG and Electric buses to replace the existing Diesel fleet as well as for the Salt Lake City Transit Master Plan that will begin starting in August of next year. They are also hiring additional drivers for these new routes and backups for existing routes.
For routes to expand the Free Fares on, how about the following:
217 - Redwood Road
35M - Max BRT (15 minute frequency)
209 - 9th East (15 minute frequency)
54 - 5400 South (15 minute frequency)
S-Line - Soon to be at 15 minute frequency
I think these routes would be great to do testing on for Free Fares in SL County. There should already be baseline ridership numbers for these routes. The only route that isn't currently at or soon to be at a 15 minute frequency is 217 - Redwood Road.
3500 South does need to have the BRT lanes redone to allow for parallel lanes. The stations can be on opposite sides of the intersections since they can't widen the road to allow for center stations. Adding a 2nd full dedicated lane as opposed to the current partial second lane that is there in places now would allow for increased frequencies. The increased frequencies with the fare removed should be enough for UDoT to agree to reduce the lanes from 3 to 2 for each direction between 40th West and I-215.
I think the additional riders on the routes would push for the same Free Fare treatment on additional routes. UTA could make the case at that point that it isn't able to expand the Free Fare routes without additional funds which could come from a portion of the City section of the 40/40/20 Sales Tax for within SL, Weber, and Davis Counties.
I don't think UTA should go Fare Free though until FrontRunner is both double tracked and electrified only because it is near max capacity currently and while adding additional cars could help, many stations can't handle the longer trains and that would confuse many riders without additional staff on each train to direct people between the cars when needed.
I think Trax might become very crowded at times requiring higher frequencies in the morning and evening peak times with Free Fares. With an upgraded FrontRunner, some could swap over from Trax to FrontRunner at the Murray Station if crowding is heavy.
Numbers time...
Just doubling the existing average daily ridership for Trax and Bus would put both around 130K+ daily.
With a fully upgraded FrontRunner UTA could be well over 200K in daily ridership in just Trax and FrontRunner and would be close to 340K in average daily ridership between Bus, Trax and FrontRunner.
Add in the other projects in the coming years - Trax extensions, BRT lines and more, plus the growth rate and hopefully we start to see more projects happen that have less required parking and more walkable neighborhoods and TODs happen with all the improved transit options.