Old Posted Aug 1, 2018, 9:29 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,141
The fourth tower (I guess tower 'D') will no longer have the dark colour palette I've been told.

I like that the buildings are all distinct, makes it look more like an organic ubran block and less like a multi-tower suburban development.
Reply With Quote
     
     
  #1142  
Old Posted Aug 2, 2018, 11:35 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,684
From Quorum Group twitter:

August 1st:

Big columns, lots of rebar in the core.


Our Quorum team worked through intense heat conditions at Burrard Place
for the L4 south concrete pour while the north side had scaffolding erected.

https://twitter.com/TheQuorumGroup


https://twitter.com/TheQuorumGroup


https://twitter.com/TheQuorumGroup

July 27th:


The scene at Burrard Place yesterday as our Quorum team was lifting
a stair box into place in preparation for another concrete pour on the podium
.
https://twitter.com/TheQuorumGroup


https://twitter.com/TheQuorumGroup
Reply With Quote
     
     
  #1143  
Old Posted Aug 15, 2018, 8:16 PM
Feathered Friend Feathered Friend is offline
Registered User
 
Join Date: Jun 2016
Posts: 2,547
1261 Hornby Street (2 Burrard Place) - UDP

The Old









The New











Quote:
After a Rough Start Two Burrard Place Doesn’t Need a Second Act To Reach A Happy Ending

1261 Hornby Street (2 Burrard Place)
This almost could have been remembered as the UDP Meeting that never happened, as it nearly started off with a disaster. Maybe the applicant team was feeling a little rattled, as the panel had just finished imposing a long list of recommendations on a proposed hotel on Broadway, or maybe everyone was feeling a little off from the hot weather.

Perhaps the heat also effected whoever added the lights to the model, as the power cord was hidden under the base. This led to a tense couple of minutes as the applicant team had to tilt the large model over the table and try to fish the cord out. Ultimately, they were successful and the model, worth ten of thousands of dollars, did not become a failed seismic experiment.

Quickly regaining their composure, the applicant team explained their design rational, indicating that, despite the large design changes, this building should be viewed as the second half of One Burrard Place, which is already under-construction. These two buildings are designed to share the same amenity areas through connections in the podium, and will even tie together their 9 levels of parking. When the panel enquired as to whether a grocery store was planned in the retail level of this building, the applicant revealed that the original plan to host a Meinhardt Fine Foods store in One Burrard Place was still intact, but they hoped to locate a complementary food service in this tower as well.
https://cityduo.wordpress.com/2018/08/15...ed-a-second-act-to-reach-a-happy-ending/
Reply With Quote
     
     
  #1144  
Old Posted Aug 16, 2018, 12:24 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,684
Reply With Quote
     
     
  #1145  
Old Posted Aug 16, 2018, 4:47 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,063
it's so boring now
__________________
belowitall
Reply With Quote
     
     
  #1146  
Old Posted Aug 16, 2018, 5:40 AM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,168
Quote:
9 levels of parking
That's a lot of parking, and a very deep hole.
Reply With Quote
     
     
  #1147  
Old Posted Aug 17, 2018, 2:43 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,407
Trump Tower only has 6 levels of parking so that is indeed quite a bit of turning to get to the bottom.
Reply With Quote
     
     
  #1148  
Old Posted Aug 21, 2018, 6:55 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,655
Quote:
Originally Posted by logan5 View Post
That's a lot of parking, and a very deep hole.
This deep https://youtu.be/CxpM7ZixUmI
https://forum.skyscraperpage.com/showthread.php?p=7741453

Last edited by Zepfancouver; Aug 22, 2018 at 8:37 PM.
Reply With Quote
     
     
  #1149  
Old Posted Aug 22, 2018, 1:58 AM
dleung's Avatar
dleung dleung is offline
Registered User
 
Join Date: Nov 2009
Location: Toronto
Posts: 6,554
good, at least they're not twins. Twin towers mean lazy design
Reply With Quote
     
     
  #1150  
Old Posted Aug 29, 2018, 11:06 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,684
By Yellow Fever SSC Aug 12th:

Quote:
Originally Posted by Yellow Fever View Post
The Burrard Place, condo site,,

IMG_1432 by City Of Rain, on Flickr

IMG_1435 by City Of Rain, on Flickr
Reply With Quote
     
     
  #1151  
Old Posted Aug 30, 2018, 12:12 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
The office tower excavation today.




Aug.29 '18, my pics









Reply With Quote
     
     
  #1152  
Old Posted Aug 30, 2018, 12:27 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Aug.29 '18, my pics


















Reply With Quote
     
     
  #1153  
Old Posted Aug 30, 2018, 6:07 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,655
Thanks guys for the new pics, we were due.

Last edited by Zepfancouver; Aug 30, 2018 at 11:47 PM.
Reply With Quote
     
     
  #1154  
Old Posted Aug 30, 2018, 10:11 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,684
Thanks!

Cool columns in the alley.

Nice to see the randomized windows (for lack of a better description) will be edged by concrete columns, rather than precast or aluminum.
Reply With Quote
     
     
  #1155  
Old Posted Sep 12, 2018, 7:42 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Office tower excavation.




Sept.11 '18, my pics






Reply With Quote
     
     
  #1156  
Old Posted Sep 12, 2018, 8:01 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Tower podium.




Sept.11 '18, my pics





















Reply With Quote
     
     
  #1157  
Old Posted Sep 12, 2018, 10:41 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,964
Thanks for the update!

With Vancouver House topping out this is the next tower with decent height to watch rise.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #1158  
Old Posted Sep 14, 2018, 11:54 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,684
Reply With Quote
     
     
  #1159  
Old Posted Sep 22, 2018, 4:24 PM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Some views from Hornby Street and the alley.




Sept.19 '18, my pics





















Reply With Quote
     
     
  #1160  
Old Posted Sep 25, 2018, 9:58 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,141
Nearly through the transition floors. A few more to go and this one should start shooting up. Just in time too as the finishing touches go onto Vancouver House.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 11:41 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.