Quote:
Originally Posted by PHrenetic
Good Day.
Absolutely - top notch ! esp. if we simply install rechargers at each end.
Now....... will they/we ??
Given that the acquisition of vehicles was a separate contract, was it already signed and done, or can it be varied, or will Jimmy want it varied, or, or, or...... ?
Pessimistic me says no chance in H !
As always, We Shall See !
|
Jim Watson campaigned on piloting electric buses in this next term... so who knows? I can't see them switching over to an entire fleet of battery-powered trains, but I would love to see them pilot one or two to see how well it would work.
Quote:
Originally Posted by Truenorth00
Are they even building actual stations for Stage 2 or just extending the platforms a bit and putting up a few more bus shelters?
|
Isn't the Trillium Line contract now a DFBOM (with or without some of those letters) contract? We might get some better stations and platforms. At the very least I'd expect them to rebuild the existing platforms if for no other reason than to add heating tubes like in the platform at Bayview.
Quote:
Originally Posted by Truenorth00
That’s even more perfect than the hydrogen train. You don’t even need to electrify the whole corridor. Just the terminii. With the distance involved, they’ll have charged enough in the time it takes for the operator to go from one end to the next and settle in.
I wonder what the cost would be to switch to this and to get it certified to operate on the Trillium Line.
|
The trains will have 12-minute dwell times at each end so that ought to be plenty of time!
Apparently the demo vehicle they displayed was production ready and set to be used on "selected routes" beginning next year in Germany (I believe? That's the country the referenced the most and also where the demo took place). If it's certified for use in Germany, it's essentially certified for the Trillium Line since those are pretty much the guidelines they used for selecting the LINTs.
On a related note, and a bit of a callback to the "good old days", not long ago
Bombardier announced a battery-powered version of the Talent 3. It has a range of only 40km, but a new version set for next year will have a range of 100km. Same overhead charging.
I do wonder how well these trains would handle the cold weather though.