  #141  
Old Posted Sep 4, 2018, 3:50 PM
jaradthescot jaradthescot is offline
Registered User
 
Join Date: May 2011
Location: London
Posts: 160
Also just throwing in my thanks for all these pictures. Been keeping an eye on the development and it's great to see an overview of the progress.
Reply With Quote
     
     
  #142  
Old Posted Sep 5, 2018, 12:15 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 96 Sept 4

Molding frames being set up along Budwiser Gardens



__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Sep 18, 2018 at 4:21 PM.
Reply With Quote
     
     
  #143  
Old Posted Sep 5, 2018, 5:04 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 97 Sept 5

Sidewalk closed on both sides between Ridout and Richmond - probably paving taking place soon





I am out of the office until Tuesday, so no pics unitl then
__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Sep 18, 2018 at 4:21 PM.
Reply With Quote
     
     
  #144  
Old Posted Sep 11, 2018, 4:43 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 101 Sept 11

Back in the office.

Paving of the south side of Dundas has started. From Ridout heading east.



__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Sep 18, 2018 at 4:21 PM.
Reply With Quote
     
     
  #145  
Old Posted Sep 11, 2018, 5:29 PM
Dupcheck's Avatar
Dupcheck Dupcheck is offline
Registered User
 
Join Date: Jul 2016
Location: London
Posts: 255
I really hope they do not tear it up again after they laid it down to bury some utility they forgot about. That is usually typical with new road construction in our city. Brand new roads with new patch work.
__________________
Kick Bureaucracy in the Nardz
Reply With Quote
     
     
  #146  
Old Posted Sep 12, 2018, 1:14 AM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Paving in progress

Left around 7pm today and they were almost all the way up to Talbot by then!





__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #147  
Old Posted Sep 12, 2018, 4:42 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 102 Sept 12

Paving complete up to Talbot





Supplies - probably tiles

__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Sep 18, 2018 at 4:21 PM.
Reply With Quote
     
     
  #148  
Old Posted Sep 13, 2018, 1:26 AM
UpstairsCranberry UpstairsCranberry is offline
Registered User
 
Join Date: Aug 2018
Posts: 56
I see you took a picture at Ridout and Queens Ave. I saw at Ridout and Dundas that pavers have been placed on the north side.
Reply With Quote
     
     
  #149  
Old Posted Sep 13, 2018, 1:54 AM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,300
Quote:
Originally Posted by UpstairsCranberry View Post
I see you took a picture at Ridout and Queens Ave. I saw at Ridout and Dundas that pavers have been placed on the north side.
Looks like he's taking the picture from Queens looking south to Dundas. This would be the closest location for the truck to unload the bricks.
Reply With Quote
     
     
  #150  
Old Posted Sep 13, 2018, 11:43 AM
UpstairsCranberry UpstairsCranberry is offline
Registered User
 
Join Date: Aug 2018
Posts: 56
Quote:
Originally Posted by Djeffery View Post
Looks like he's taking the picture from Queens looking south to Dundas. This would be the closest location for the truck to unload the bricks.
No, I am talking about the pavers laid into place, not unplaced ones still on the pallattes.
Reply With Quote
     
     
  #151  
Old Posted Sep 13, 2018, 4:52 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 103 Sept 13

Brick laying has begun



__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Sep 18, 2018 at 4:21 PM.
Reply With Quote
     
     
  #152  
Old Posted Sep 14, 2018, 4:28 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 104 Sept 14

More brick laying and a lot of concrete cutting - LOUD today





__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Sep 18, 2018 at 4:21 PM.
Reply With Quote
     
     
  #153  
Old Posted Sep 14, 2018, 4:33 PM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,976
Awesome, it's getting there.
__________________
"Living life on the edge"
Reply With Quote
     
     
  #154  
Old Posted Sep 14, 2018, 7:03 PM
rml rml is offline
Registered User
 
Join Date: Feb 2017
Location: London
Posts: 53
confirmed...

Quote:
Originally Posted by Dupcheck View Post
I really hope they do not tear it up again after they laid it down to bury some utility they forgot about. That is usually typical with new road construction in our city. Brand new roads with new patch work.
i work outside of 217 York street (york at clarence) it has been dug up every year for 14 out of my 18 years working there.

thats how it's done in London
Reply With Quote
     
     
  #155  
Old Posted Sep 17, 2018, 5:04 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 105 Sept 17

More tile work

Dundas & Richmond is a COMPLETE mess today for pedestrian access



__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Sep 18, 2018 at 4:21 PM.
Reply With Quote
     
     
  #156  
Old Posted Sep 18, 2018, 4:20 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 106 Sept 18

Curb work at Dundas/Talbot today



__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #157  
Old Posted Sep 19, 2018, 4:04 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 107 Sept 19

Curbs have been molded, tiling work continues



__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #158  
Old Posted Sep 20, 2018, 12:45 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,181
Seems like good progress, I am going to the Knights home opener tomorrow so will get to see a close up
Reply With Quote
     
     
  #159  
Old Posted Sep 20, 2018, 4:22 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 108 Sept 20

Someone made a boo boo - curb being redone today?





Also some extra pics



__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #160  
Old Posted Sep 21, 2018, 4:23 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,485
Day 109 Sept 21

Last day of summer - hot and very windy / dusty on Dundas today



__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:16 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.