Quote:
Originally Posted by Denver
Submittal with LPC for the Block 162 Hotel. This is a big step forward. The LPC process is not a cheap or easy one to go through. They would not be jumping through these hoops unless they were serious. Also The designs look pretty good. If this gets LPC approval, do not expect the designs to change too dramatically as that would require resubmittal. This current submittal is for mass and form.
https://www.denvergov.org/content/dam/de...t_massformcontext_application_091818.pdf
|
That looks great! Hope it can make it into this market cycle.
I was driving through there earlier and the amount of new density in that area is impressive, and Block 162 is not even out of the ground yet. I still think 15th needs a makeover similar to what they did with 14th back in 2011. It's becoming an increasingly important corridor through downtown, and not just a speedway like it used to be.