  #8081  
Old Posted Sep 10, 2018, 3:41 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by H>T&T>P View Post
I am going to agree with you about a significant number of people crossing the Vimy bridge once the south extension is complete. I live in Barrhaven and it will be 5 mins closer than Fallowfield. In the end though it will be the length of trip that will make my decision. When the Baseline extension is complete I would probably switch back. Time will tell.
At the very least the 99 and 94 buses will connect to the Trillium Line when it opens. Based on this assumption alone, a good portion of Barrhaven will have easy access to the Trillium Line. It will then be up to residents to decide, which direction makes the most sense. Those who are most likely to take advantage will live in the southeast part of Barrhaven. But the wild card will be those who choose to use a Park n Ride lot along the Trillium Line. In this respect, extending the rail line to the underutilized Riverview P&R next to the Vimy Bridge would be very helpful to those living in Barrhaven and Manotick. But when will this happen?
     
     
  #8082  
Old Posted Sep 10, 2018, 3:44 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
Quote:
Originally Posted by H>T&T>P View Post
so 27 days ago they were confident

https://www.ottawamatters.com/local-news...t-it-will-meet-november-deadline-1014379

and now the contract is pushed back 28 days?

Maybe they should try being honest!
They need to impose the million dollar penalty. RTG has calculated that it was cheaper to miss the deadline and as a result didn't hire enough subs. We're a month or from handover and they're still doing tons of actual construction. This should not be the case.
     
     
  #8083  
Old Posted Sep 10, 2018, 3:44 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
The news of a further delay of the opening of the Confederation Line should surprise nobody. Just looking at the recent picture of the interior of Rideau Station had to send up red flags.
     
     
  #8084  
Old Posted Sep 10, 2018, 4:01 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by PHrenetic View Post
Specifically, Rideau Transit Group (RTG) wants to be excused from a requirement to have all 34 vehicles in operation, and have all stations "substantially" completed by the deadline.
Assuming Rideau is the only station that won't be completed and LRV34 is the only one that won't be complete, and given the right protection mechanisms to ensure they are completed in a timely manner (and the application of the $1M penalty), I think the city should consider excusing those requirements. The right deal could actually give the city more power as they could negotiate a second penalty if the February date for the last two items isn't met. In the meantime, they could do an extended free trial period.
     
     
  #8085  
Old Posted Sep 10, 2018, 4:16 PM
corynv corynv is offline
Registered User
 
Join Date: Jun 2018
Posts: 171
Quote:
Originally Posted by roger1818 View Post
Assuming Rideau is the only station that won't be completed and LRV34 is the only one that won't be complete, and given the right protection mechanisms to ensure they are completed in a timely manner (and the application of the $1M penalty), I think the city should consider excusing those requirements. The right deal could actually give the city more power as they could negotiate a second penalty if the February date for the last two items isn't met. In the meantime, they could do an extended free trial period.
It's not just 34 that isn't finished. 30 of the 34 are fine, 3 of the 34 have tech part missing (mainly things to do with the signaling, which isn't good. apparently RTG lost those parts and doesn't have them for 34 either). And 34 is still being assembled.

I don't remember who is was, but someone was tweeting from inside the FEDCO meeting saying something along those lines.
     
     
  #8086  
Old Posted Sep 10, 2018, 4:27 PM
RomanR27 RomanR27 is offline
Registered User
 
Join Date: Apr 2016
Posts: 2,040
Quote:
Originally Posted by corynv View Post
It's not just 34 that isn't finished. 30 of the 34 are fine, 3 of the 34 have tech part missing (mainly things to do with the signaling, which isn't good. apparently RTG lost those parts and doesn't have them for 34 either). And 34 is still being assembled.

I don't remember who is was, but someone was tweeting from inside the FEDCO meeting saying something along those lines.
https://twitter.com/KatePorterCBC/status/1039154186804326401
     
     
  #8087  
Old Posted Sep 10, 2018, 4:59 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,706
'I'm pretty angry right now': LRT likely won't be ready until 2019

Jon Willing, Ottawa Citizen
Updated: September 10, 2018


The Confederation Line LRT likely won’t be ready for customers by the end of 2018, councillors learned Monday.

Transportation general manager John Manconi told the finance and economic development committee that he received a call from RTG on the way home from work on Friday around 6 p.m. suggesting a new schedule of completion.

RTG was supposed to deliver the $2.1-billion LRT system on Nov. 2. The company has now suggested it can deliver it on Nov. 30. Based on the testing that would need to happen, the city doesn’t think the LRT system would open until the first quarter of 2019.

RTG wanted to “carve” out part of the delivery agreement that promised a Nov. 2 handover — which would have meant the partial opening of some stations and a reduced fleet size — but Manconi says the city won’t buckle on the transit system it’s paying for. That means having 34 vehicles and seeing all stations open.

Rideau Station is the one major area of construction that continues to be behind. City staff started raising warning flags about the timelines in August.

“We called them out. We did our due diligence,” Manconi said.

A $1-million penalty is now in play.

Councillors said they were upset during the Monday briefing.

“I’m pretty angry right now,” Coun. Stephen Blais said.

More to come.

[email protected]
twitter.com/JonathanWilling
     
     
  #8088  
Old Posted Sep 10, 2018, 6:37 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
So November 30th was what RTG expected with the carve out? So they may not even be able to deliver to contract spec till new year? They deserve that fine. They are at least 2 months late on a six month extension.
     
     
  #8089  
Old Posted Sep 10, 2018, 8:39 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Truenorth00 View Post
So November 30th was what RTG expected with the carve out? So they may not even be able to deliver to contract spec till new year? They deserve that fine. They are at least 2 months late on a six month extension.
Without giving up the right to fine, the city should actually take the carve out. Let's face it, the chances of things being kink free on handover is very low, and i always thought it was unlikely the city could start service 30 days after taking ownership. We could save ourselves from even further delays by letting the city actually start their testing, even if it's only partial
     
     
  #8090  
Old Posted Sep 10, 2018, 8:52 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by kmcamp View Post
Without giving up the right to fine, the city should actually take the carve out. Let's face it, the chances of things being kink free on handover is very low, and i always thought it was unlikely the city could start service 30 days after taking ownership. We could save ourselves from even further delays by letting the city actually start their testing, even if it's only partial
And without giving final payment.
     
     
  #8091  
Old Posted Sep 10, 2018, 9:09 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,930
I'm somewhat baffled that a 2.1B project has a 1M penalty for missing the deadline by almost a year. That hardly seems a sufficient inducement to get it done.
     
     
  #8092  
Old Posted Sep 10, 2018, 9:23 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
Quote:
Originally Posted by acottawa View Post
I'm somewhat baffled that a 2.1B project has a 1M penalty for missing the deadline by almost a year. That hardly seems a sufficient inducement to get it done.
The inducement is progress payments. $275 million outstanding. Think of the interest on that every month they are late. Also, think of their cash flow. They are paying out but not seeing anything come in.
     
     
  #8093  
Old Posted Sep 10, 2018, 9:27 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
Quote:
Originally Posted by kmcamp View Post
Without giving up the right to fine, the city should actually take the carve out. Let's face it, the chances of things being kink free on handover is very low, and i always thought it was unlikely the city could start service 30 days after taking ownership. We could save ourselves from even further delays by letting the city actually start their testing, even if it's only partial
It's a two fold problem here. RTG was either negotiating in bad faith or hiding the truth about the schedule. Which is now going to blow a hole in OC Transpo's budget. Keeping an extra 300+ drivers and lots of buses serviceable for at least another 3-4 months. The above lack of transparency means we can't ascertain if this is actually the last delay or not. They need to be incentivized to come clean.

If the city takes the carve-out, will RTG accept responsibility for defects found after handover. Part of where the city screwed up here is the insistence on something that's pretty close to hard launch. This means they need a very reliable system delivered to them. There's not much margin here.
     
     
  #8094  
Old Posted Sep 10, 2018, 9:34 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Truenorth00 View Post
It's a two fold problem here. RTG was either negotiating in bad faith or hiding the truth about the schedule. Which is now going to blow a hole in OC Transpo's budget. Keeping an extra 300+ drivers and lots of buses serviceable for at least another 3-4 months. The above lack of transparency means we can't ascertain if this is actually the last delay or not. They need to be incentivized to come clean.
This is actually more expensive than you might first think. I don't know, but I expect those drivers were given some sort of retention bonus with their severance package to ensure they stayed until the end. Most likely they will have to pay out that bonus and then offer another one for them to stay even longer.
     
     
  #8095  
Old Posted Sep 10, 2018, 10:35 PM
wrecked ‘em wrecked ‘em is offline
BANNED
 
Join Date: Sep 2018
Posts: 1
Has that sinkhole been found to be the reason for the first delay? Because I believe the city was at fault for that, right? So it looks to me like the city might want to ease off with the “I’m pretty angry right now” rhetoric.
     
     
  #8096  
Old Posted Sep 10, 2018, 10:50 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:35 AM.
     
     
  #8097  
Old Posted Sep 10, 2018, 11:16 PM
Luker Luker is offline
Registered User
 
Join Date: May 2008
Posts: 377
Quote:
Originally Posted by wrecked ‘em View Post
Has that sinkhole been found to be the reason for the first delay? Because I believe the city was at fault for that, right? So it looks to me like the city might want to ease off with the “I’m pretty angry right now” rhetoric.
Nice first post, lol. Don't happen to work for or be related to a company in the LRT consortium?
     
     
  #8098  
Old Posted Sep 10, 2018, 11:34 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
Quote:
Originally Posted by Reecemartin View Post
Given the scope of the project, I'm still not that surprised about the delay, just be thankful it's not the TYSSE open multi years late.
It'll be over a year later. That's substantial.

And at one point, they had talked about having it ready for Canada 150.
     
     
  #8099  
Old Posted Sep 10, 2018, 11:36 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
Quote:
Originally Posted by wrecked ‘em View Post
Has that sinkhole been found to be the reason for the first delay? Because I believe the city was at fault for that, right? So it looks to me like the city might want to ease off with the “I’m pretty angry right now” rhetoric.
Can you explain how the sinkhole resulted in parts for the LRVs being misplaced?
     
     
  #8100  
Old Posted Sep 10, 2018, 11:43 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Luker View Post
Nice first post, lol. Don't happen to work for or be related to a company in the LRT consortium?
Or just a troll stiring up trouble. We all know that it was the RTG that was found responsible for the sinkhole.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:53 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.