HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #621  
Old Posted Aug 27, 2018, 7:38 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:53 AM.
Reply With Quote
     
     
  #622  
Old Posted Aug 27, 2018, 7:44 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Reecemartin View Post
A few questions:

Any plans to have the airport branch made into a separate line? Maybe we will see Line 3 sooner rather than later. . .
No. Any new plans beyond what we know will wait for the new Transportation Master Plan and they are waiting to see the effects of LRT before starting that.

Quote:
Have we heard any more about electrification?
Just that we won't be doing it any time soon.

Quote:
Will the airport branch still have longer platforms?
No, short platforms. The plan is to use single Lints on the Airport Spur, since demand won't warent double lenght trains

Quote:
Is the plan to use 2 Lints connected together?
On the main line yes. On the airport spur, no.
Reply With Quote
     
     
  #623  
Old Posted Aug 27, 2018, 8:06 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by roger1818 View Post
No. Any new plans beyond what we know will wait for the new Transportation Master Plan and they are waiting to see the effects of LRT before starting that.
The way they decide to brand the Airport service could change without needing to wait for the TMP to be updated. In some ways, it could make sense to call the Airport train "Line 3" just to differentiate it from the Trillium Line since the two won't interline.

Quote:
Just that we won't be doing it any time soon.
Yeah, and to add to that: The FLIRTs will have electric drive motors and electrification will be as simple as installing pantographs and removing the power pack car.

Quote:
Originally Posted by Reecemartin View Post
A few questions:
With all that being said a 15 minute frequency isn't necessarily bad especially for an airport spur, it just requires us to admit that the Trillium Line really isn't LRT it's regional rail. The FLIRTs are certainly not LRVs . . .
What I would love to see is integrated PSDs at the Airport similar to the UP Express at Pearson that can open the doors on the train and the PSD on button press.
It's sad because the last upgrade "promised" 8 minute frequencies, and the design report for Stage 2 mentioned that it was designed with 10 minute frequencies in mind.

For now, capacity on the line will be doubled (with double-capacity trains), but I can imagine that this increase in capacity won't last long as more and more people use the line (with more stations, and better connections to other lines and routes). Hopefully these frequencies are constrained by the number of vehicles the have, and not by track capacity so that they can at least make incremental changes in the future.
Reply With Quote
     
     
  #624  
Old Posted Aug 27, 2018, 8:52 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by OCCheetos View Post
The way they decide to brand the Airport service could change without needing to wait for the TMP to be updated. In some ways, it could make sense to call the Airport train "Line 3" just to differentiate it from the Trillium Line since the two won't interline.


Yeah, and to add to that: The FLIRTs will have electric drive motors and electrification will be as simple as installing pantographs and removing the power pack car.



It's sad because the last upgrade "promised" 8 minute frequencies, and the design report for Stage 2 mentioned that it was designed with 10 minute frequencies in mind.

For now, capacity on the line will be doubled (with double-capacity trains), but I can imagine that this increase in capacity won't last long as more and more people use the line (with more stations, and better connections to other lines and routes). Hopefully these frequencies are constrained by the number of vehicles the have, and not by track capacity so that they can at least make incremental changes in the future.
I really think that the airport and bayshore branches will get the numbers 3 and 4 respectively. OC Transpo deliberately reserved those two with their route renumbering.

However nothing is really known until they announce something
Reply With Quote
     
     
  #625  
Old Posted Aug 27, 2018, 9:33 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
Yeah, and to add to that: The FLIRTs will have electric drive motors and electrification will be as simple as installing pantographs and removing the power pack car.
Almost all trains have electric drive motors. What makes the FLIRTs unique is that they have a removable diesel generator.

They also have the option of a hybrid configuration, keeping the power pack car in place so that it can run on an electric supply where there is power, and run on diesel where there isn't. That allows them to build the catenary in stages. For example, they might want to put it in the tunnel first.
Reply With Quote
     
     
  #626  
Old Posted Aug 27, 2018, 9:47 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by roger1818 View Post
Almost all trains have electric drive motors. What makes the FLIRTs unique is that they have a removable diesel generator.

They also have the option of a hybrid configuration, keeping the power pack car in place so that it can run on an electric supply where there is power, and run on diesel where there isn't. That allows them to build the catenary in stages. For example, they might want to put it in the tunnel first.
IIRC the LINTs we have don't have electric drive motors. (and similarly, I don't think the Talents did either.)

At the very least, they lack the distinct sound of electric motors when accelerating. (I've seen a video of a TEXRail FLIRT accelerating and it sounds just like a Toronto Rocket).
Reply With Quote
     
     
  #627  
Old Posted Aug 27, 2018, 9:54 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by roger1818 View Post
Almost all trains have electric drive motors. What makes the FLIRTs unique is that they have a removable diesel generator.

They also have the option of a hybrid configuration, keeping the power pack car in place so that it can run on an electric supply where there is power, and run on diesel where there isn't. That allows them to build the catenary in stages. For example, they might want to put it in the tunnel first.
This will never happen if they don't protect the right of way for a connection.
Reply With Quote
     
     
  #628  
Old Posted Aug 27, 2018, 10:15 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
IIRC the LINTs we have don't have electric drive motors. (and similarly, I don't think the Talents did either.)
You are right. According to this link, the LINT 41 has a diesel mechanical drive.
Reply With Quote
     
     
  #629  
Old Posted Aug 27, 2018, 10:22 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by lrt's friend View Post
This will never happen if they don't protect the right of way for a connection.
Initially they could tap off of the Confederation Line at Bayview Later they would want redundant connections when they remove the diesel-electric power pack.
Reply With Quote
     
     
  #630  
Old Posted Aug 27, 2018, 11:54 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by roger1818 View Post
Initially they could tap off of the Confederation Line at Bayview Later they would want redundant connections when they remove the diesel-electric power pack.
The pump building could be re-purposed into a TPSS building for electrification in that area.
Reply With Quote
     
     
  #631  
Old Posted Aug 28, 2018, 12:26 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:53 AM.
Reply With Quote
     
     
  #632  
Old Posted Aug 28, 2018, 12:57 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Reecemartin View Post
Isn't the Confederation Line interlining to Bayshore? In that case I don't see the logic in having a separate Line Number
Most of the time, yes. At ultra low peak, when the trains are running at 15 minute frequencies, they will have people transfer at Lincoln Field to going to Moodie. That seems hardly worth creating a new line number for though.
Reply With Quote
     
     
  #633  
Old Posted Aug 28, 2018, 11:23 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by roger1818 View Post
Most of the time, yes. At ultra low peak, when the trains are running at 15 minute frequencies, they will have people transfer at Lincoln Field to going to Moodie. That seems hardly worth creating a new line number for though.
The line number in Ottawa is a wayfinding convienience. It's more compact and easier for a rider to see the number 3 rather then the vancouver model "this train to yvr airport, this train to richmond-brighouse", especially when you then have to repeat it in French. There's no cost except maybe changing some signs, which they'd have to do anyway.

In fact, if they do this, expect to see a empty circle number downtown, and a filled circle past Lincoln Fields like they do with bus signs to show that service is not there at all times.

Anyway it's still all speculation at this point.

Last edited by kmcamp; Aug 28, 2018 at 11:58 AM.
Reply With Quote
     
     
  #634  
Old Posted Aug 28, 2018, 1:03 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by kmcamp View Post
The line number in Ottawa is a wayfinding convienience. It's more compact and easier for a rider to see the number 3 rather then the vancouver model "this train to yvr airport, this train to richmond-brighouse", especially when you then have to repeat it in French. There's no cost except maybe changing some signs, which they'd have to do anyway.

In fact, if they do this, expect to see a empty circle number downtown, and a filled circle past Lincoln Fields like they do with bus signs to show that service is not there at all times.

Anyway it's still all speculation at this point.
I agree, but for a split, a simple 1a and 1b would be better as it would be clearer for those going to stations before the split. You could even make it directional so that there is a separate letter for eastbound trains as well. That is where I wish they had gone with letters instead of numbers for the LRT lines and numbers for the destination suffix. With a number suffix, you could have, for example, odd numbers for west and north bound trains and even numbers for east and south bound trains (similar the the RER in Paris). For the Confederation Line, the Route/Destination numbers could be as follows:
A1 - Baseline
A2 - Trim Rd
A3 - Moodie Dr.
A4 - Place D'Orleans
A5 - Lincoln Fields
A6 - Blair Rd.
Reply With Quote
     
     
  #635  
Old Posted Aug 28, 2018, 5:54 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by roger1818 View Post
I agree, but for a split, a simple 1a and 1b would be better as it would be clearer for those going to stations before the split. You could even make it directional so that there is a separate letter for eastbound trains as well. That is where I wish they had gone with letters instead of numbers for the LRT lines and numbers for the destination suffix. With a number suffix, you could have, for example, odd numbers for west and north bound trains and even numbers for east and south bound trains (similar the the RER in Paris). For the Confederation Line, the Route/Destination numbers could be as follows:
A1 - Baseline
A2 - Trim Rd
A3 - Moodie Dr.
A4 - Place D'Orleans
A5 - Lincoln Fields
A6 - Blair Rd.
I'm thinking we won't have to wait too long to figure out, they'll probably make some branding decisions once they've picked consortiums.

I'm trying to think of interlining examples in North America:
Vancouver - Inconsistent. Destination names for Expo and Canada Lines, Line name for Millennium/Evergreen Extension, former overlap of Expo and Millennium lines
Edmonton - Two Line Names (Metro/Capital)
NYC - Numbers
LA - Line Names (Blue/Expo, and Red/Purple)
Calgary - Two Line Names (Red/Blue), but only interlined in a short section
Reply With Quote
     
     
  #636  
Old Posted Aug 28, 2018, 7:24 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:53 AM.
Reply With Quote
     
     
  #637  
Old Posted Aug 28, 2018, 7:34 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by Reecemartin View Post
Numbers akin to New York would actually be quite cool haha,

When do we expect the preferred proponent to be chosen?
By the end of the year, I believe.
Reply With Quote
     
     
  #638  
Old Posted Aug 28, 2018, 10:23 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by Reecemartin View Post
Isn't the Confederation Line interlining to Bayshore? In that case I don't see the logic in having a separate Line Number
The Confederation splits at Lincoln Fields. The system will be interlined during rush hour and weekdays, but a transfer will be needed for riders coming from one of the lines (not sure which one) nights and weekends when frequency is reduced to 15 minutes east of Lincoln fields (in order to maintain 15 minutes on both spurs).

So yes, I think they should have them as two lines - Confederation Line 1 to Moodie (and eventually Kanata) and maybe Kitchissippi Line 3 to Algonquin. Wish they would have reserved line 2 one of the Confederation splits.
Reply With Quote
     
     
  #639  
Old Posted Aug 28, 2018, 10:49 PM
corynv corynv is offline
Registered User
 
Join Date: Jun 2018
Posts: 171
Quote:
Originally Posted by J.OT13 View Post
The Confederation splits at Lincoln Fields. The system will be interlined during rush hour and weekdays, but a transfer will be needed for riders coming from one of the lines (not sure which one) nights and weekends when frequency is reduced to 15 minutes east of Lincoln fields (in order to maintain 15 minutes on both spurs).

So yes, I think they should have them as two lines - Confederation Line 1 to Moodie (and eventually Kanata) and maybe Kitchissippi Line 3 to Algonquin. Wish they would have reserved line 2 one of the Confederation splits.
I think depending on what they're going for, having odd numbered lines for east/west lines, and even for north-south is a good idea. (based off of the general direction of the main line)

Last edited by corynv; Aug 28, 2018 at 10:49 PM. Reason: spelling
Reply With Quote
     
     
  #640  
Old Posted Aug 28, 2018, 11:00 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by J.OT13 View Post
The Confederation splits at Lincoln Fields. The system will be interlined during rush hour and weekdays, but a transfer will be needed for riders coming from one of the lines (not sure which one) nights and weekends when frequency is reduced to 15 minutes east of Lincoln fields (in order to maintain 15 minutes on both spurs).

So yes, I think they should have them as two lines - Confederation Line 1 to Moodie (and eventually Kanata) and maybe Kitchissippi Line 3 to Algonquin. Wish they would have reserved line 2 one of the Confederation splits.
I guess when they numbered the lines Stage 2 hadn't been planned yet so there was no concept of a "split" on the Line 1.

Renumbering is possible of course, although in the grand scheme of things, not really necessary.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.