HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #7941  
Old Posted Aug 25, 2018, 7:48 PM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by kmcamp View Post
We're a long way off needing anything near that capacity. Even Vancouver is only now hitting 15k pphd, and they have 2.5 times the population of Ottawa
The point is, we do not need to just connect smaller trains to give a big long one. There are options.
     
     
  #7942  
Old Posted Aug 25, 2018, 9:29 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
 
Join Date: Sep 2015
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:35 AM.
     
     
  #7943  
Old Posted Aug 25, 2018, 9:45 PM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Reecemartin View Post
The current Expo Line rush hour capacity is close to 25kppdph and the individual train capacity is higher than was posted. We exceeded 15k on the Expo Line a long time ago, Canada Line and Millenium Line are both well below that but probably not for long. M-Line also can go to above 25k and Canada Maxes at 15k (though probably less in reality).

Also worth noting that the Skytrain is probably always going to be capable of higher frequency than Toronto and Ottawa even with ATO because the LIM motors used on Skytrain simply offer better acceleration and don't require "grip".
Once the M line reaches UBC, it will skyrocket.
     
     
  #7944  
Old Posted Aug 25, 2018, 9:45 PM
kmcamp kmcamp is offline
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Reecemartin View Post
The current Expo Line rush hour capacity is close to 25kppdph and the individual train capacity is higher than was posted. We exceeded 15k on the Expo Line a long time ago, Canada Line and Millenium Line are both well below that but probably not for long. M-Line also can go to above 25k and Canada Maxes at 15k (though probably less in reality).

Also worth noting that the Skytrain is probably always going to be capable of higher frequency than Toronto and Ottawa even with ATO because the LIM motors used on Skytrain simply offer better acceleration and don't require "grip".
I had read differently on expo line capacity

http://cartoview.blogspot.com/2017/01/filling-expo-line.html?m=1

As for the LIM that's why i said "near skytrain". I believe the fastest possible headway is 180s on the confed line.

As for a full length train, there wasn't even trains this long 10 years ago on the market, which is why other systems in NA use dinky 29m siemens s70s coupled in 2's or 3's. So when it comes time to start replacing trains in the fleet it might be a possibility
     
     
  #7945  
Old Posted Aug 25, 2018, 9:59 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
 
Join Date: Sep 2015
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:35 AM.
     
     
  #7946  
Old Posted Aug 26, 2018, 4:04 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by swimmer_spe View Post
The Toronto Rocket train is a long train that does not have doors connecting them. They are very long.
Same with the Montreal Azure. One can walk end to end. That's what I'm hoping we'll be able to have eventually. That and the elimination of the driver cab. That's one thing that is awesome about the Vancouver Skytrain; passengers can sit at the front or back window since trains have no drivers.


https://www.tripadvisor.ca/LocationPhoto...SkyTrain-Vancouver_British_Columbia.html
     
     
  #7947  
Old Posted Aug 26, 2018, 3:12 PM
sseguin sseguin is offline
 
Join Date: Aug 2018
Posts: 322
Over the past couple weeks, we have added photos for all the stations (minus the elusive St. Laurent) to the O-Train Fans website. You can see how the stations are progressing as well as the general layouts.

Also launched yesterday afternoon is our new forum, with a focus on the O-Train. It's just starting out and you are welcome to join us in the discussions we will have there.

www.otrainfans.ca
     
     
  #7948  
Old Posted Aug 26, 2018, 4:22 PM
roger1818's Avatar
roger1818 roger1818 is offline
 
Join Date: Feb 2016
Posts: 6,610
Quote:
Originally Posted by Reecemartin View Post
The current Expo Line rush hour capacity is close to 25kppdph and the individual train capacity is higher than was posted. We exceeded 15k on the Expo Line a long time ago, Canada Line and Millenium Line are both well below that but probably not for long. M-Line also can go to above 25k and Canada Maxes at 15k (though probably less in reality).
Do you have a reference for that? The best I can find from Translink is this document dated September 2010. I it, it says:
  • "As of 2009, the peak hour demand estimated at 14,600 pphpd exceeded the system capacity of 13,300 pphpd"
  • "capacity is now* at 16,000 pphpd" and
  • "The Expo Line suffers from a number of physical and technological constraints which prevent the system from reaching an ultimate capacity of 25,700 pphpd without targeted investments being made."
* at the time the document was written.

While I am sure that today the capacity has increased even further, especially with the introduction of Mark III trains, it would surprise me that if in 9 years they would have nearly doubled capacity. Also, I was also under the impression that to reach the ultimate capacity, they needed to run 5 car Mark II (or better yet III) trains to fully utilize their 80m platforms, but they are currently only using a 4 car configuration.

One advantage the Confederation Line has that the Expo line doesn't, is that the downtown stations are in the centre of the line, so that trains in both directions are going to/from the suburbs, almost doubling the usable capacity of the trains traveling through the downtown core.

Quote:
Also worth noting that the Skytrain is probably always going to be capable of higher frequency than Toronto and Ottawa even with ATO because the LIM motors used on Skytrain simply offer better acceleration and don't require "grip".
Interesting. I was not aware of that. However, acceleration rates are mostly limited by passenger comfort and not by "grip." Skytrian might get a bit of an advantage in that regard (especially in slippery conditions) but I don't see it being a massive difference.

The biggest advantages of Linear Induction Motors are that they provide faster emergency braking and and allow steeper grades.

The biggest limitation to frequency on an ATO system is station dwell time, especially when someone holds the doors.
     
     
  #7949  
Old Posted Aug 26, 2018, 7:52 PM
AuxTown's Avatar
AuxTown AuxTown is offline
 
Join Date: Apr 2006
Posts: 4,654
Quote:
Originally Posted by sseguin View Post
Over the past couple weeks, we have added photos for all the stations (minus the elusive St. Laurent) to the O-Train Fans website. You can see how the stations are progressing as well as the general layouts.

Also launched yesterday afternoon is our new forum, with a focus on the O-Train. It's just starting out and you are welcome to join us in the discussions we will have there.

www.otrainfans.ca
Great website with some very detailed updates!
     
     
  #7950  
Old Posted Aug 26, 2018, 7:56 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by sseguin View Post
Over the past couple weeks, we have added photos for all the stations (minus the elusive St. Laurent) to the O-Train Fans website. You can see how the stations are progressing as well as the general layouts.

Also launched yesterday afternoon is our new forum, with a focus on the O-Train. It's just starting out and you are welcome to join us in the discussions we will have there.

www.otrainfans.ca
Thanks. In a lot of ways, this is more informative and better laid out than anything the City has to offer.

Just an FYI, the St-Laurent Station mall level has been open for a few weeks.
     
     
  #7951  
Old Posted Aug 26, 2018, 9:33 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
 
Join Date: Nov 2005
Posts: 4,703
Quote:
Originally Posted by J.OT13 View Post
So much wasted space. Alstom has a 59 meter unit available, so what's stopping them from creating a continuous 96 meter train? I get that the City will only be running a 48 meter car on weekends, but I feel that for efficiency and maintenance wise, a full single car 96 meter train would have been better.


https://twitter.com/rail613/status/1032429158884929536
The joints between the cars look a bit unfinished, are they missing some sort of additional black accordion-like covering as in the renderings? I'm not thrilled with the vast whiteness on the length of the train, it could use a bit more red ( maybe a fifth or quarter of the total surface) like in the buses. An asymmetric one red end one white end would have been interesting too, with 3 different ways they could be coupled.
     
     
  #7952  
Old Posted Aug 26, 2018, 10:25 PM
sseguin sseguin is offline
 
Join Date: Aug 2018
Posts: 322
Thank you for the great feedback. Happy it's being well received.

Lots more content to come... stay tuned.
     
     
  #7953  
Old Posted Aug 26, 2018, 10:43 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
 
Join Date: Sep 2015
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:35 AM.
     
     
  #7954  
Old Posted Aug 26, 2018, 10:52 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
 
Join Date: Sep 2015
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:35 AM.
     
     
  #7955  
Old Posted Aug 26, 2018, 11:11 PM
kmcamp kmcamp is offline
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Reecemartin View Post
The more I look the more I feel like Ottawa has some of the best wayfinding in the country, its great!
Except for an unfortunate foray into "pastel square" signage a few years ago, i think OC Transpo has always had pretty decent wayfinding signage.
     
     
  #7956  
Old Posted Aug 26, 2018, 11:34 PM
sseguin sseguin is offline
 
Join Date: Aug 2018
Posts: 322
Quote:
Originally Posted by Reecemartin View Post
Would love to see a Youtube Channel!
Hi Reecemartin, we actually do have a YouTube channel, although currently there are only two videos, about the Kontinuum multimedia experience in Lyon Station from last year's Ottawa 2017 celebrations. One is a walk through (you get some interesting shots of the escalators and stairs, the platform and the Lyon/Queen kiosk exit. The other video was from the last day the show was open, reflecting on the LRT opening a year later. https://www.youtube.com/channel/UCJzzfzG95FxDCgeUO26FvCw

There are a few things planned as we get closer to the opening, and plenty more once it is open. There should start being videos sometime in September.

Last edited by sseguin; Aug 26, 2018 at 11:54 PM.
     
     
  #7957  
Old Posted Aug 28, 2018, 6:42 PM
PHrenetic PHrenetic is offline
 
Join Date: Jun 2016
Posts: 1,029
Good Day.

FYI - For all those who have been following Councillor Keith Egli's webpage of FEDCO updates on the LRT, please be aware, as stated at the bottom of the page :

Quote:
The City’s Election-Related Resources Policy (ERRP) prohibits Members of Council who are seeking re-election in a municipal election from using their office budgets and staff for newsletters and general communications from August 23, 2018 up to and including October 22, 2018 (known as the ‘blackout period’). As a sitting Member of Council, I must adhere to the City’s ERRP, meaning that this website will not be updated during the blackout period.

UnQuote.

Now, by inquiring of his staff as to where I could find the updates on the City (physical or web, no matter which) I got in reply the 10 page August memo in PDF.

So -
1) we have no source for the September or October updates.
2) what is the general opinion of my posting the August update here in what will amount to a rather large post ?

( ? waterloowarrior ? )

Standing by.........
     
     
  #7958  
Old Posted Aug 28, 2018, 7:34 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
 
Join Date: Nov 2005
Posts: 9,255
What about hosting on https://www.scribd.com/upload-document or a similar site?
     
     
  #7959  
Old Posted Aug 28, 2018, 7:51 PM
sseguin sseguin is offline
 
Join Date: Aug 2018
Posts: 322
You could probably share it to www.otrainfans.ca on the forums. If the document isn't confidential and considered public or sharable with the media, then I don't see a problem posting it to the forums.

You can attach images but also PDF, up to 32mb.
     
     
  #7960  
Old Posted Aug 28, 2018, 11:08 PM
OCCheetos OCCheetos is offline
 
Join Date: Aug 2017
Posts: 2,118
The City has reached an agreement with TELUS to provide cell service inside the tunnel.

https://ottawacitizen.com/news/local-new...ement-for-cell-service-in-the-lrt-tunnel


Apparently I missed that this article is a year old..

Last edited by OCCheetos; Aug 28, 2018 at 11:46 PM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:13 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.