Quote:
Originally Posted by K85
Yea I'm in the same boat. Been following this thread for months now, on a multiple daily check to see updates. You have two day 93's btw
|
Thanks - fixed. 95 days in now. Closing in on 100 days - wonder if we will see any work on the cobblestone or Talbot intersection before then.
With Fanshawe's new downtown campus opening up next week (in addition to the one they already have), things are about to get a lot busier downtown. An additional 2,000 people will be in the area from what I have read.
...And they still need to replace the sidewalks on Dundas between Talbot and Richmond - odd how Ridout to Talbot was being done first. That's going to be a big pedestrian choke point if you're down to one narrow sidewalk on Dundas. At least Carling should be opened up by the time Fanshawe opens to relieve some of the strain.