Quote:
Originally Posted by Orlando
I don't get it. Was Ritchie Group proposing to tear down the church? It's on the half block to the north of their first phase stuff on the vacant parking lot on the block south of the church.
|
They aren't planning to tear down the church nor the temple. My understanding is the only building that would be torn down is the RWP complex in the SE corner of the block during Phase 2. Phase 1 is already approved and will start construction once the height approval for Phase 2 is approved.
They are waiting on the approval because it is a master planned project and the whole project financially only works with the height allowance in Phase 2 because of the residential tower which is slated to be the first tower. The 3 towers in Phase 2 will be built on top of the parking garage. The garage will have 2 levels of below grade parking, a main level with grocery and shops plus the main entrance for the office, hotel and residential, and then 3 levels of parking above. The towers will then be built on top of the parking. Residential is first. Hotel is second and Commercial is third but could be moved up depending on market demand.
Ideally, they would like a D1 zone so that if demand is higher for Residential, Hotel or Commercial during Phase 2, they could possibly build taller than 375' but the D4 overlay is capped at 375' currently and that is all that is needed to make the project financially successful.
All current plans for both Phase 1 and Phase 2 are to have the entrances to the parking garages (Phase 1 will be entirely below grade) from within the project. The only concession that the developer had to do was the Loading dock entrance for Phase 1 is facing 1st South. They are spending extra money to install a quick open/close rolling door to limit exposure to the street and the church (across the street) to the loading/garbage area. They are trying to limit the overall impact to the street.
They have also talked with the Church and Temple leaders about incorporating the Festival into the project to give more space for various activities. As well as possibly additional festivities during the year. They are trying to help the community.