HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture


    The St. Regis Chicago in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Chicago Skyscraper Diagram

Map Location
Chicago Projects & Construction Forum

Reply

 
Thread Tools Display Modes
     
     
  #4061  
Old Posted Jul 28, 2018, 4:41 AM
bnk bnk is offline
BANNED
 
Join Date: Mar 2006
Location: chicagoland
Posts: 12,071
Quote:
Originally Posted by Notyrview View Post
Lololol yes oh Great Plumber Overlord preach!
Great intelligent response.


Ill let you google all night long to try to respond other than a lol, middle finger, stick it to the old man, or what ever.

Some people just don't want to learn. I have my teenagers that act like that.


That's not a compliment BTW.

You should not be proud of yourself. You contributed nothing in this said conversation other than pulling your pants down and … fill in the blank.
Reply With Quote
     
     
  #4062  
Old Posted Jul 28, 2018, 4:44 AM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,443
Don't worry about the plumbers, they can just cut holes where they need to and patch in anything damaged.
Reply With Quote
     
     
  #4063  
Old Posted Jul 28, 2018, 4:53 AM
Kumdogmillionaire's Avatar
Kumdogmillionaire Kumdogmillionaire is offline
Development Shill
 
Join Date: Nov 2015
Location: San Antonio
Posts: 1,136
Quote:
Originally Posted by bnk View Post
Great intelligent response.


Ill let you google all night long to try to respond other than a lol, middle finger, stick it to the old man, or what ever.

Some people just don't want to learn. I have my teenagers that act like that.


That's not a compliment BTW.

You should not be proud of yourself. You contributed nothing in this said conversation other than pulling your pants down and … fill in the blank.
The issue is there is a big gap between testing the plumbing once or twice and having the pipes filled with water and breaking due to cold weather. How stupid do you think these guys are? You remind me of my friend who always goes on the extremes for debates.

That's not a compliment BTW.

You should not be proud of yourself. You contributed nothing in this said conversation other than plumbing your pants down and ... fill in the broken pipes.
__________________
For you - Bane
Reply With Quote
     
     
  #4064  
Old Posted Jul 28, 2018, 4:57 AM
bnk bnk is offline
BANNED
 
Join Date: Mar 2006
Location: chicagoland
Posts: 12,071
Quote:
Originally Posted by LouisVanDerWright View Post
Don't worry about the plumbers, they can just cut holes where they need to and patch in anything damaged.
Right through all of the electrify and HVAC like others have probably wanted to or slightly stated.

Well stated brother.

Now that is an intelligent, tactful, intelligent, and rather humorous response.


Anyone care to lol at him? Flip him the finger and lol at him?


Thank you LVDW.


I didn't think so. Good night already.
Reply With Quote
     
     
  #4065  
Old Posted Jul 28, 2018, 2:49 PM
Notyrview Notyrview is offline
BANNED
 
Join Date: Dec 2012
Location: New York City
Posts: 1,648
Quote:
Originally Posted by bnk View Post
Right through all of the electrify and HVAC like others have probably wanted to or slightly stated.

Well stated brother.

Now that is an intelligent, tactful, intelligent, and rather humorous response.


Anyone care to lol at him? Flip him the finger and lol at him?


Thank you LVDW.


I didn't think so. Good night already.
You’re like my favorite thing on the internet in probably 6 months lolol
Reply With Quote
     
     
  #4066  
Old Posted Jul 28, 2018, 3:48 PM
Kumdogmillionaire's Avatar
Kumdogmillionaire Kumdogmillionaire is offline
Development Shill
 
Join Date: Nov 2015
Location: San Antonio
Posts: 1,136
Quote:
Originally Posted by Notyrview View Post
You’re like my favorite thing on the internet in probably 6 months lolol
It's like if you combined two people's comments into the same one for all of his posts here. It's amazing. The back and forth inner dialogue is intriguing
__________________
For you - Bane
Reply With Quote
     
     
  #4067  
Old Posted Jul 28, 2018, 6:15 PM
left of center's Avatar
left of center left of center is offline
1st Ward
 
Join Date: Sep 2006
Location: The Big Onion
Posts: 2,967
Well, all this is quite interesting lol.

My understanding is that HVAC goes in first (then plumbers, and electricians last), since they need the open and unencumbered space to route their duct work, and since electrical and plumbing can literally go through a duct of at least a certain minimum size if no work around is possible.

If the building isn't closed up by the time the HVAC installers are done and the plumbers need to go in, and if for whatever reason its too cold for them to do their work, I'd imagine that they would either have the electricians skipping ahead of the plumbers, or the contractor would just stall the project until glass goes up or the weather warms up. That said, I'm not sure why the plumbers couldn't install pipes in freezing temps so long as they did not connect and turn on the water. I understand this would most likely delay dry walling until spring next year when the water systems can be tested, but this project is already delayed out the 🞵🞵🞵, so whats new?
__________________
"Eventually, I think Chicago will be the most beautiful great city left in the world." -Frank Lloyd Wright
Reply With Quote
     
     
  #4068  
Old Posted Jul 29, 2018, 1:18 PM
ih8spires ih8spires is offline
Marina City
 
Join Date: Aug 2005
Posts: 120
Hey bnk, I appreciate the articles you post and your general positive outlook. Don't let the skyscraper bullies discourage you.
Reply With Quote
     
     
  #4069  
Old Posted Jul 30, 2018, 12:30 AM
City Wide City Wide is offline
Registered User
 
Join Date: Aug 2014
Posts: 1,627
Quote:
Originally Posted by left of center View Post
Well, all this is quite interesting lol.

My understanding is that HVAC goes in first (then plumbers, and electricians last), since they need the open and unencumbered space to route their duct work, and since electrical and plumbing can literally go through a duct of at least a certain minimum size if no work around is possible.

If the building isn't closed up by the time the HVAC installers are done and the plumbers need to go in, and if for whatever reason its too cold for them to do their work, I'd imagine that they would either have the electricians skipping ahead of the plumbers, or the contractor would just stall the project until glass goes up or the weather warms up. That said, I'm not sure why the plumbers couldn't install pipes in freezing temps so long as they did not connect and turn on the water. I understand this would most likely delay dry walling until spring next year when the water systems can be tested, but this project is already delayed out the 🞵🞵🞵, so whats new?

All the trades, except the window crews, are probably working according to plan. After the core is poured usually the utilities follow closely behind. This doesn't mean that wire is run to a individual outlet or light, but the systems in the individual units are just a relative small part of the total package. Drainage and vents can and often are run early on as they use gravity and don't have a lot of flexibility is where they can be placed. Pressure systems, like hot and cold water, if needed can be routed around and up and over if something is 'in the way', plus they are much smaller pipes and are intended to be run through and in the wall cavities. .
Reply With Quote
     
     
  #4070  
Old Posted Jul 30, 2018, 2:02 AM
SolarWind's Avatar
SolarWind SolarWind is offline
Chicago
 
Join Date: Jun 2006
Posts: 5,629
July 26, 2018









Reply With Quote
     
     
  #4071  
Old Posted Jul 30, 2018, 2:37 PM
gebs's Avatar
gebs gebs is offline
Registered User
 
Join Date: Jan 2017
Location: South Loop
Posts: 810
Quote:
Originally Posted by Kumdogmillionaire View Post
It's like if you combined two people's comments into the same one for all of his posts here. It's amazing. The back and forth inner dialogue is intriguing
I'm just tickled that someone finally got KDM and Notyrview on the same page.

As for this project, it sounds like we can all agree that its bare structure is striking enough to warrant constant photography, which bodes well for our enjoyment of this unfortunate glass delay. Plus, I don't think any of us are under contract ...
Reply With Quote
     
     
  #4072  
Old Posted Jul 30, 2018, 2:39 PM
gebs's Avatar
gebs gebs is offline
Registered User
 
Join Date: Jan 2017
Location: South Loop
Posts: 810
I haven't checked in a while, but does the spandrel glass continue to go up without issue?
Reply With Quote
     
     
  #4073  
Old Posted Jul 30, 2018, 3:31 PM
Skyguy_7 Skyguy_7 is offline
BANNED
 
Join Date: Dec 2012
Location: Chicago
Posts: 2,657
^^^ Any concern about MEP delays can be alleviated thanks to the pic above. I see lots of duct, plumbing & sprinkler pipe.
Reply With Quote
     
     
  #4074  
Old Posted Jul 30, 2018, 8:42 PM
jjk113 jjk113 is offline
Registered User
 
Join Date: Aug 2016
Posts: 59
Is there an estimated time when the building will top out ?
Reply With Quote
     
     
  #4075  
Old Posted Jul 30, 2018, 8:54 PM
Kumdogmillionaire's Avatar
Kumdogmillionaire Kumdogmillionaire is offline
Development Shill
 
Join Date: Nov 2015
Location: San Antonio
Posts: 1,136
Quote:
Originally Posted by jjk113 View Post
Is there an estimated time when the building will top out ?
Some time in the winter would be a very safe bet. Early December is my guess, maybe mid/late November if they can hit a 1.5 floor a week pace
__________________
For you - Bane
Reply With Quote
     
     
  #4076  
Old Posted Jul 30, 2018, 9:26 PM
lakeshoredrive lakeshoredrive is offline
Registered User
 
Join Date: Jul 2018
Posts: 542
Quote:
Originally Posted by Kumdogmillionaire View Post
Some time in the winter would be a very safe bet. Early December is my guess, maybe mid/late November if they can hit a 1.5 floor a week pace
That would be amazing!
Reply With Quote
     
     
  #4077  
Old Posted Jul 31, 2018, 1:17 AM
Skyguy_7 Skyguy_7 is offline
BANNED
 
Join Date: Dec 2012
Location: Chicago
Posts: 2,657
Can anyone recall the pace at which Trump Tower cycled? I once recall hearing 3 floors per week but that seems high.
Reply With Quote
     
     
  #4078  
Old Posted Jul 31, 2018, 5:50 AM
Bombardier Bombardier is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago, IL
Posts: 470
3 days per floor is pretty much the maximum. They can do 2 days per floor but the quality is garbage.
Reply With Quote
     
     
  #4079  
Old Posted Jul 31, 2018, 2:28 PM
Skyguy_7 Skyguy_7 is offline
BANNED
 
Join Date: Dec 2012
Location: Chicago
Posts: 2,657
Quote:
Originally Posted by Bombardier View Post
3 days per floor is pretty much the maximum. They can do 2 days per floor but the quality is garbage.
Thanks, that's probably where I heard the (3) figure.
Reply With Quote
     
     
  #4080  
Old Posted Jul 31, 2018, 5:52 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: CHI/MRY
Posts: 4,814
Western core is at level 68, as of Sunday 7/29
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 1:27 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.