HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #581  
Old Posted Jul 27, 2018, 10:57 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by McC View Post
That’s not a quote.
It is a quote from the article I referenced. I did a cut and paste. It is true the author did paraphrase what Manconi said if that’s what you mean.
Reply With Quote
     
     
  #582  
Old Posted Jul 27, 2018, 3:44 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,959
The Trillium Line will forever be an ongoing project. If the City continues with these very expensive "upgrades" that do next to nothing to improve service in the long run, along with stupid ideas like giving every institution its own station (just watch them give RCR its own spur), we're screwed for life. The line will continuously be out of service for sporatic periods the way it's going now.

The City should have shut it down for a few years in order to double track the entire length and electrify for LRVs. And then extend south, bit by bit.

I'm hopeful that City staff gives council a reality check and straight-up rejects a Civic Station. And maybe, if we're really lucky, the winning Stage 2 Trillium proponent will have included double track to Carling and re-alignment under the street with entrances on both ends. But that is beyond wishful thinking.
Reply With Quote
     
     
  #583  
Old Posted Jul 27, 2018, 7:36 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:54 AM.
Reply With Quote
     
     
  #584  
Old Posted Jul 27, 2018, 7:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,959
Soooo... Moose??
Reply With Quote
     
     
  #585  
Old Posted Jul 27, 2018, 7:51 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:54 AM.
Reply With Quote
     
     
  #586  
Old Posted Jul 27, 2018, 7:55 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by Reecemartin View Post
Moose was commuter peak only no?

The Trillium Line will very likely be electrified someday and also uses DMUs it has the potential to be much better than Moose.
They want(ed) to run hourly trains from 5 to midnight (or something like that).

MOOSE isn't opposed to electrification in any way, it's just waaaaaayyyyy past the scope of what they're working on right now.
Reply With Quote
     
     
  #587  
Old Posted Jul 27, 2018, 8:41 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:54 AM.
Reply With Quote
     
     
  #588  
Old Posted Jul 27, 2018, 8:46 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by Reecemartin View Post
Has there been any progress with Moose at all? Any suggestion that it might actually happen
I think they recently went to a new potential investor, but otherwise no.
Reply With Quote
     
     
  #589  
Old Posted Jul 27, 2018, 10:17 PM
acottawa acottawa is online now
Registered User
 
Join Date: Aug 2009
Posts: 18,861
Quote:
Originally Posted by Reecemartin View Post
Has there been any progress with Moose at all? Any suggestion that it might actually happen
There's already a pretty extensive thread on this.
Reply With Quote
     
     
  #590  
Old Posted Jul 28, 2018, 1:16 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Reecemartin View Post
With the current direction, things are going with Flirts and the Airport Spur maybe it makes more sense to turn the Trillium Line into a regional rail line? (With relatively high frequencies and even longer trains) You could have several branches North and South of the river all feeding a new expanded station at Bayview, while the trunk section is offered frequent service.
Arguably it already works like a German regional rail train, even using the same kind of signaling equipment and trains. German regional rail is a complementary system to urban metros and trams. But the city is trying to have it both ways, designing it as a rail line, but selling it as a light rail urban trunk
Reply With Quote
     
     
  #591  
Old Posted Jul 28, 2018, 10:07 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:54 AM.
Reply With Quote
     
     
  #592  
Old Posted Jul 28, 2018, 11:37 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by Reecemartin View Post
If you think about it even with only 2 tracks into and out of Bayview you could service a bunch of 15 minute regional lines, an interesting idea imo.
Part of MOOSE's plan would involve a bypass west of Bayview (presumably with its own platform(s)) since the bi-levels they want to use can't fit under the Albert Street bridge.

Bayview is certainly the best... or rather only option for any kind of regional commuter rail hub, but of course it'll probably never happen.

Edit: Speaking of the Albert Street bridge, I wonder if they'll regrade the Trillium Line tracks during Stage 2 back to being lower than they currently are. I can imagine the next-to-no clearance between the trains and the bridge might cause trouble with future electrification projects... plus they can avoid dealing with MOOSE as far as Albert Street is involved.

Last edited by OCCheetos; Jul 28, 2018 at 11:49 PM.
Reply With Quote
     
     
  #593  
Old Posted Aug 1, 2018, 4:29 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by OCCheetos View Post
Edit: Speaking of the Albert Street bridge, I wonder if they'll regrade the Trillium Line tracks during Stage 2 back to being lower than they currently are. I can imagine the next-to-no clearance between the trains and the bridge might cause trouble with future electrification projects... plus they can avoid dealing with MOOSE as far as Albert Street is involved.
That would be tough - the lower level of Bayview station is level with the existing and future Trillium line platforms. Lowering the track would require ramps down from the lower concourse level.

It could be done most easily with tracks that end at Bayview, but would be a challenge for through tracks.
Reply With Quote
     
     
  #594  
Old Posted Aug 1, 2018, 8:58 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Catenary View Post
That would be tough - the lower level of Bayview station is level with the existing and future Trillium line platforms. Lowering the track would require ramps down from the lower concourse level.

It could be done most easily with tracks that end at Bayview, but would be a challenge for through tracks.
Or....crazy idea... Moose could give up the idea of using bilevels and use the FRA complaint FLIRTs as well. No special exemption required and no need to worry about platform compatibility. Stadler is the only manufacture that seems to be targeting the North American market by adding that compliance
Reply With Quote
     
     
  #595  
Old Posted Aug 1, 2018, 10:02 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by kmcamp View Post
Or....crazy idea... Moose could give up the idea of using bilevels and use the FRA complaint FLIRTs as well. No special exemption required and no need to worry about platform compatibility. Stadler is the only manufacture that seems to be targeting the North American market by adding that compliance
I don't disagree with that. Heck, if they somehow get their act together fast enough maybe they can even tack their order on to the end of OC Transpo's and cut the costs down?
Reply With Quote
     
     
  #596  
Old Posted Aug 2, 2018, 2:50 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by kmcamp View Post
Or....crazy idea... Moose could give up the idea of using bilevels and use the FRA complaint FLIRTs as well. No special exemption required and no need to worry about platform compatibility. Stadler is the only manufacture that seems to be targeting the North American market by adding that compliance
I believe they only comply with the FRA's "Alternative Equipment Crashworthiness Standards" which replaces the previous practice of approving wavers but still limit their use on conventional rail lines.
Reply With Quote
     
     
  #597  
Old Posted Aug 2, 2018, 3:16 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by roger1818 View Post
I believe they only comply with the FRA's "Alternative Equipment Crashworthiness Standards" which replaces the previous practice of approving wavers but still limit their use on conventional rail lines.
As far as I can tell, Texrail will be using their FLIRTs in regular freight traffic. PTC and crash energy management seem to have played a big part in allowing that to happen.

Neither VIA nor CN seem to have any plans to implement PTC any time soon... so... hmmm.
Reply With Quote
     
     
  #598  
Old Posted Aug 2, 2018, 3:48 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
As far as I can tell, Texrail will be using their FLIRTs in regular freight traffic. PTC and crash energy management seem to have played a big part in allowing that to happen.

Neither VIA nor CN seem to have any plans to implement PTC any time soon... so... hmmm.
I thought otherwise about TexRail but you might be right (they are using segments of existing infrastructure belonging to the Fort Worth and Western Railroad, Union Pacific Railroad, Trinity Railway Express (TRE) line and Dallas Area Rapid Transit’s (DART) Cotton Belt rail line, but I don't know if there will be freight operations at the same time of day as passenger service).

For those who are interested, here is a video of a walk through and features of their FLIRTs. It shows the stairs between sections and the diesel section and some other features that may not exist on the Trillium Line trains.

Video Link
Reply With Quote
     
     
  #599  
Old Posted Aug 2, 2018, 2:57 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:53 AM.
Reply With Quote
     
     
  #600  
Old Posted Aug 2, 2018, 3:05 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by Reecemartin View Post
Given I don't think any of the stations on Line 2 have any bathrooms maybe onboard bathrooms isn't so bad an idea...
Bayview and Limebank (as well as the Airport) will have bathrooms.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:57 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.