Old Posted May 31, 2018, 9:57 PM
cganuelas1995 cganuelas1995 is online now
Registered User
 
Join Date: Jan 2017
Posts: 1,643
Quote:
Originally Posted by Dengler Avenue View Post
Oh is translink working on that? I've always thought that they would just have the routes heading south terminate at Bay 4 on Saba Road (although people have complained about the noise from the buses before), and the ones heading north end at Bay 2 (or 3) then park on Saba Road. As an interim solution, at least.
Yeah there was a lot of construction for a few months, and by that I mean every day I would go there, there would be more changes, then it suddenly stopped. I then saw an article that said it stopped because they were doing design work.

I mean, they have years to do that while they were waiting for the property to be acquired. Couldn't they do that while they wait?
     
     
  #18602  
Old Posted Jun 1, 2018, 12:17 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Quote:
Originally Posted by cganuelas1995 View Post
Yeah there was a lot of construction for a few months, and by that I mean every day I would go there, there would be more changes, then it suddenly stopped. I then saw an article that said it stopped because they were doing design work.

I mean, they have years to do that while they were waiting for the property to be acquired. Couldn't they do that while they wait?
I wouldn't be surprised if the situation is similar to Metrotown Stn's pedestrian overpass where city hall is delaying the bus loop due to some misguided belief that the bus loop is not "pedestrian friendly" or some kind of similar BS.

Splitting the 410 is easy. 410 will terminate at Brighouse and just bring back the 406 which will run between Steveston and Brighouse.
     
     
  #18603  
Old Posted Jun 1, 2018, 5:56 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
Quote:
Originally Posted by ilikeredheads View Post
bring back the 406 which will run between Steveston and Brighouse.
They will. And the 408 too.
     
     
  #18604  
Old Posted Jun 1, 2018, 8:56 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,675
What’s next? 407 and 420? I think translink’s also splitting that route.

After all, ridership’s growing along Gilbert Road but remains stagnant after Richmond Centre.

The caveat for passengers though is to not confuse 430 with the 420.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #18605  
Old Posted Jun 8, 2018, 6:11 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,620
Translink is taking over the Horseshoe Bay express route:

Quote:
“The change is going to be seamless for our customers. In fact, there is going to be increased capacity, consistency and frequency of service on the 257,” said Chris Bryan, TransLink spokesman.

Right now, the route is served by two articulated buses and three 40-foot buses. When Coast Mountain takes over, 257 riders will have a little more elbow room on five articulated buses.

The Blue Bus is the last municipally owned bus service in operation under the TransLink umbrella. Its staff are District of West Vancouver employees, although the municipality is reimbursed fully by TransLink for their costs. Operational decisions about routes and schedules are still made in collaboration with TransLink as they are in other municipalities.

Unlike TransLink though, Blue Bus has its own depot and maintenance yard on the North Shore. But that facility on Lloyd Avenue no longer has the capacity to deal with the articulated buses, according to the district.

“It was never built to maintain the number of buses that we currently have in operation,” said Donna Powers, District of West Vancouver spokeswoman. “The more complex the buses get and the bigger they get, the more of a challenge it puts on the size of our operation. This is really about making Blue Bus sustainable when there is just more than we can operate and maintain properly to the highest level that we would like to.”

All the 257 buses will be based and serviced at the Burnaby Transit Centre off Boundary Road when the change comes into effect, the same depot that houses all of the North Vancouver buses since TransLink closed the Third Street bus depot in 2016.

“We certainly have more maintenance resources available to us so we’re able to turn around that maintenance more quickly, which in turn ensures better reliability of service,” Bryan said.
http://www.nsnews.com/news/west-van-gives-257-blue-bus-run-to-translink-1.23328905
     
     
  #18606  
Old Posted Jun 9, 2018, 9:50 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Next round of transit service changes are coming on June 25th: https://www.translink.ca/Schedules-and-Maps/Transit-Service-Changes.aspx

Of particular note, they are changing the platform designations at Lougheed station to avoid wrong-railing trains at Burquitlam:
Quote:
Starting June 25, Millennium Line trains will use different platforms at Lougheed Town Centre Station.
  • To board a Millennium Line train heading towards VCC-Clark Station, your train will stop at platform 3, which is on the north side of the station and closest to the mall.
  • To board a Millennium Line train heading towards Lafarge Lake-Douglas Station, your train will stop at platform 1, which is on the south side of the station and furthest from the mall.
  • Expo Line platforms will not change.
     
     
  #18607  
Old Posted Jun 9, 2018, 11:54 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,675
Sadly enough, nothing for Richmond.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #18608  
Old Posted Jun 10, 2018, 12:14 AM
Colin4567 Colin4567 is offline
Registered User
 
Join Date: Oct 2017
Location: Lower Mainland-ish
Posts: 234
Quote:
Originally Posted by dpogue View Post
Next round of transit service changes are coming on June 25th: https://www.translink.ca/Schedules-and-Maps/Transit-Service-Changes.aspx

Of particular note, they are changing the platform designations at Lougheed station to avoid wrong-railing trains at Burquitlam:
Even if it does make it harder to get from Coquitlam to Surrey, it makes it a heck of a lot less confusing. Really happy with this.
     
     
  #18609  
Old Posted Jun 10, 2018, 12:51 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by dpogue View Post
Next round of transit service changes are coming on June 25th: https://www.translink.ca/Schedules-and-Maps/Transit-Service-Changes.aspx

Of particular note, they are changing the platform designations at Lougheed station to avoid wrong-railing trains at Burquitlam:
i seem to remember this was disussed here when evergreen was under construction, but it was dismissed as 'too complicated' by a few naysayers.

now it seems the wrong-railing that has been done since Evergreen opened was too hard or too complicated (or too hard on the switches?)
     
     
  #18610  
Old Posted Jun 10, 2018, 1:04 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Quote:
Originally Posted by jsbertram View Post
i seem to remember this was disussed here when evergreen was under construction, but it was dismissed as 'too complicated' by a few naysayers.

now it seems the wrong-railing that has been done since Evergreen opened was too hard or too complicated (or too hard on the switches?)
I suspect it's due to the issues they've had with switches. The current routing requires 8 switches (including the ones between Production Way and Lake City) moving frequently. The new routing would only involve 6.

In retrospect, if one switch were positioned further west, they could have the centre platform handle both outbounds and the side platform handle all the inbounds. Unfortunately, that switch was roughed in during the original M-Line construction and it would have been hugely disruptive to change it and likely involve rebuilding part of the guideway
     
     
  #18611  
Old Posted Jun 10, 2018, 3:06 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
I don't see the roughed in switch you speak of west of there station, can you show the location please?
     
     
  #18612  
Old Posted Jun 10, 2018, 4:16 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Quote:
Originally Posted by Mac Write View Post
I don't see the roughed in switch you speak of west of there station, can you show the location please?
It's labelled Switch DC155 on the guideway. It was roughed in during the original Millennium Line construction, leading to the side platform. It was fully built as part of the Evergreen extension, and is used now for trains coming from Production Way to switch from the inbound track over to the side platform.
     
     
  #18613  
Old Posted Jun 10, 2018, 4:31 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
There is room for Expo to use the side platform. The switch is still before the side platform.
     
     
  #18614  
Old Posted Jun 11, 2018, 6:21 PM
dothediu dothediu is offline
Registered User
 
Join Date: Sep 2015
Posts: 70
Quote:
Originally Posted by dpogue View Post
I suspect it's due to the issues they've had with switches. The current routing requires 8 switches (including the ones between Production Way and Lake City) moving frequently. The new routing would only involve 6.

In retrospect, if one switch were positioned further west, they could have the centre platform handle both outbounds and the side platform handle all the inbounds. Unfortunately, that switch was roughed in during the original M-Line construction and it would have been hugely disruptive to change it and likely involve rebuilding part of the guideway

I notice inbound train usually waited at Burquitlam for outbound train to crossover. And also sometimes inbound train waiting outside station bunching with Expo trains when they get towards Lougheed. This should eliminate the wait times.

Also they probably did this so Expo Line passengers switching to Millenium westbound are now forced to switch at Production Way. This will even out the passenger in/out distribution and make Lougheed westbound less busy but probably much tougher for those Expo Line folks to get a seat now!
     
     
  #18615  
Old Posted Jun 11, 2018, 11:53 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
So does the change at Lougheed mean that trains to VCC-Clark are split between 2 platforms? Millennium Line trains at Platform 3 and Expo Line trains at Platform 2.

The whole purpose of the wrong-railing was to combine trains to one platform so passengers wouldn't miss the "next" train to VCC-Clark.

I suppose if the Millennium Line frequency is high enough, it won't matter so much and that would be the "go-to" platform if headed to VCC-Clark.
     
     
  #18616  
Old Posted Jun 12, 2018, 12:07 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Quote:
Originally Posted by officedweller View Post
So does the change at Lougheed mean that trains to VCC-Clark are split between 2 platforms? Millennium Line trains at Platform 3 and Expo Line trains at Platform 2.

The whole purpose of the wrong-railing was to combine trains to one platform so passengers wouldn't miss the "next" train to VCC-Clark.

I suppose if the Millennium Line frequency is high enough, it won't matter so much and that would be the "go-to" platform if headed to VCC-Clark.
Expo line doesn't goto VCC Clark. It terminates at Production Way.
     
     
  #18617  
Old Posted Jun 12, 2018, 12:12 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Interesting report on electric buses; https://web.archive.org/web/201806112349.../27_Green_Bus_Technology_Plan_Update.pdf

A summary is provided by slides starting pg 31.

Has a bus comparison starting on pg 15, garage issues, bus standardization issues, charging profiles, discussion of required electrical upgrades (e.g. new substation), key performance indicators (e.g. 15% lifecycle cost saving), and 10 year procurement plan. They plan for 900 electric buses in the next 10 years. Interesting trial with CUTRIC.
     
     
  #18618  
Old Posted Jun 12, 2018, 6:48 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,782
Quote:
Originally Posted by ClaytonA View Post
Interesting report on electric buses; https://web.archive.org/web/201806112349.../27_Green_Bus_Technology_Plan_Update.pdf

A summary is provided by slides starting pg 31.
Really interesting, thanks for posting!
     
     
  #18619  
Old Posted Jun 12, 2018, 2:54 PM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Other than the long lost opportunity of designing and building Lougheed Station properly in the first place, this new configuration seems the best workaround solution to a botched mess.

Quote:
Originally Posted by dpogue View Post
Next round of transit service changes are coming on June 25th: https://www.translink.ca/Schedules-and-Maps/Transit-Service-Changes.aspx

Of particular note, they are changing the platform designations at Lougheed station to avoid wrong-railing trains at Burquitlam:
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
  #18620  
Old Posted Jun 12, 2018, 5:10 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
What would have been the best way to build Lougheed Station?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:42 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.