  #5241  
Old Posted Jun 2, 2018, 1:22 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by nname View Post
Expo Line ends at King George with a tail track pointing southwest, toward the direction of Langley. The tail track lined up exactly at the center of Fraser Highway.


Quote:
Originally Posted by nname View Post
That's what people against SkyTrain said, which I disagree to. People claim SkyTrain is too expensive because they have to elevate through the farm land. But go Port Moody to check out how at-grade SkyTrain works. The only thing extra is to close or elevate the roadways that crosses the track, and then the cost of SkyTrain or LRT is pretty much the same.
Exactly. Laying the tracks is pretty much the same price - grade separating it costs more. Elevating is costs some more but not $$$ more. A lot of the section between approx 170th to 180th (about 2.5km) could be low or on-ground.


Quote:
Originally Posted by SgtNeonPanda View Post
The only reason costs between LRT and Skytrain on the Evergreen line were so similar was due to the tunnel no? Otherwise, I think LRT wins cost wise, especially since it's unlikely to need very high capacity in the future that far south. At least the end of the Evergreen extension still has a significant population past its terminus.


The Evergreen tunnel was the most expensive section to build (tunnels cost $$$). Really the only reason Surrey LRT will be cheaper to build is due to no grade separation and very little traffic separation.

Meanwhile it's been shown that LRT operational costs will be waaaaay higher than Skytrain operational costs. Do we really want to spend less up front and end up paying a lot more to run it?
     
     
  #5242  
Old Posted Jun 2, 2018, 6:24 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,179
Quote:
Originally Posted by SgtNeonPanda View Post
I'd love for this thing to be Skytrain as well, but I'm trying to stay optimistic since we can't go back in time now, unfortunately.
Sheba and nname covered all the major points. Obviously no commuter ever wants to see a train line fail, but there really aren't any redeeming features so far.

Oh, and welcome to the forum.
     
     
  #5243  
Old Posted Jun 2, 2018, 7:32 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
i wouldn't hate this so much if Surrey paid for this political 🞵🞵🞵🞵 themselves. but nope, they need to waste my tax dollars on their stupid vanity project from a transit agency that is perpetually broke being tossed around like a hot potato. it should be illegal for politicians to pick what to do when it comes to anything that requires a brain.
     
     
  #5244  
Old Posted Jun 2, 2018, 8:12 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,025
Yeah, that is the sticking point it the cost and that Translink will get all the blame once any problem occurs on this line (despite its design being fully dictated by Surrey City government ).

Then there is the fact that they are also trying to sabotage the extension to Langley with their idealism (and sadly so far the provincial government seems to not have the backbone to counter them... wish they took properly building mass transit as seriously as their stance against KM... )
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #5245  
Old Posted Jun 2, 2018, 9:22 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Well if Translink doesn't want to be 🞵🞵🞵🞵 on once this white elephant finally gets built and within the first month you might have the first ped fatality. Then maybe Translink should tell Surrey to piss off and pay for it and operate it themselves. Instead Translink is playing along.
     
     
  #5246  
Old Posted Jun 2, 2018, 12:27 PM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,025
Unlike the provincial government Translink doesn’t have such authority. They work for the elected governments, not above. They can only recommend, that’s it.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #5247  
Old Posted Jun 2, 2018, 3:40 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,519
I would have to think that if there were grade-separated tracks at major intersection, much of the LRT/Skytrain debate would diminish.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #5248  
Old Posted Jun 2, 2018, 4:39 PM
Colin4567 Colin4567 is offline
Registered User
 
Join Date: Oct 2017
Location: Lower Mainland-ish
Posts: 234
Quote:
Originally Posted by s211 View Post
I would have to think that if there were grade-separated tracks at major intersection, much of the LRT/Skytrain debate would diminish.
If you go back in the forum you'll see this debated time and time again,so everyone let's not have another 10 page discussion on grade separation
     
     
  #5249  
Old Posted Jun 2, 2018, 4:53 PM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
^This. Instead of what you said, how about we do the ”let’s make the Surrey-Langley Line in to a SkyTrain extension instead of a botched LRT” thing?
     
     
  #5250  
Old Posted Jun 2, 2018, 5:46 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,519
Quote:
Originally Posted by Colin4567 View Post
If you go back in the forum you'll see this debated time and time again,so everyone let's not have another 10 page discussion on grade separation
Sorry, that wasn't my intent. I'm not following this thread in detail because it has shades of the mess Edmonton's going through on two of its existing lines (and about to get messier with its line currently under construction), and it gets too hard to read sometimes.

Will step back.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #5251  
Old Posted Jun 2, 2018, 9:32 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Went to the open house at 104th and 144th today to voice my concerns about the project. They told me it would be too expensive to make 104th ave all 4 lanes so they are only doing it in sections. They are making 100th ave 4 lanes from KG to 156th st. I asked about signal priority. The LRT won't have total signal priority but something call intelligent signalling. In other words, there will be times when it has to stop at lights just like the rest of us.

They said they changed some things about the project because of feedback. This means we need to make our voices heard so that the Langley section does not go LRT. Nothing has been decided about that section officially.
     
     
  #5252  
Old Posted Jun 2, 2018, 10:17 PM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 652
Quote:
Originally Posted by Trainguy View Post
Went to the open house at 104th and 144th today to voice my concerns about the project. They told me it would be too expensive to make 104th ave all 4 lanes so they are only doing it in sections. They are making 100th ave 4 lanes from KG to 156th st. I asked about signal priority. The LRT won't have total signal priority but something call intelligent signalling. In other words, there will be times when it has to stop at lights just like the rest of us.

They said they changed some things about the project because of feedback. This means we need to make our voices heard so that the Langley section does not go LRT. Nothing has been decided about that section officially.
104th isn't even wide enough to accommodate 4 lanes plus a pair of streetcar tracks, so it'll require land acquisition along the entire stretch of the road, driving up cost even more. And that's assuming there's even space for expansion. Well, at least they are expanding 100th to 4 lanes all the way.

Sounds like "intelligent signalling" is basically the light staying green a bit longer if a tram is approaching the intersection.
     
     
  #5253  
Old Posted Jun 2, 2018, 10:55 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by Trainguy View Post

They said they changed some things about the project because of feedback. This means we need to make our voices heard so that the Langley section does not go LRT. Nothing has been decided about that section officially.
Technically the fight isn't over until the shovels are in the ground...

And if this LRT 🞵🞵🞵🞵 gets built, you can bet your tax dollars that Translink will not be building ANYTHING for any municipality south of the Fraser river for a while.

This project is going to piss off the entire Lower Mainland, the Feds, and the Provincial Government.
     
     
  #5254  
Old Posted Jun 2, 2018, 11:08 PM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
1) Mods need to change the thread by taking out the "rapid"

2) We all need to stop calling this LRT; it's a streetcar/tram given the capacity and design. Calling it LRT is a misnomer muddying the waters. Besides Surrey streetcar has a nice ring to it anyways.

3) The biggest improvement would be two grade separations where the streetcar enters/exits City Blvd. Those are the highest risk of collision/largest creator of traffic congestion with longer crossing times. If there is any change you can motivate, this is the one.
     
     
  #5255  
Old Posted Jun 4, 2018, 2:55 AM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by nname View Post
Expo Line ends at King George with a tail track pointing southwest, toward the direction of Langley. The tail track lined up exactly at the center of Fraser Highway.
Don't you mean southeast?
     
     
  #5256  
Old Posted Jun 4, 2018, 10:55 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by ilikeredheads View Post
104th isn't even wide enough to accommodate 4 lanes plus a pair of streetcar tracks, so it'll require land acquisition along the entire stretch of the road, driving up cost even more. And that's assuming there's even space for expansion. Well, at least they are expanding 100th to 4 lanes all the way.

Sounds like "intelligent signalling" is basically the light staying green a bit longer if a tram is approaching the intersection.
city report has admitted that by the 2040's, 104th will need to be widened back to 4 lanes plus lh and rh turn lanes because the train as built won't have the capacity or ability to change driving habits at that time. even with 100th and 108th widened to 4 lanes today, they will run out of vehicle capacity in 20-30 years.

that's a problem and cost for a future council to deal with
     
     
  #5257  
Old Posted Jun 6, 2018, 4:13 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,121
__________________
belowitall
     
     
  #5258  
Old Posted Jun 7, 2018, 2:00 AM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Quote:
Originally Posted by SpongeG View Post
Typical slick propaganda that doesn't tell the whole story. I hope the protests ramp up even more and make people more aware of the mess this street car will create.
     
     
  #5259  
Old Posted Jun 7, 2018, 2:26 AM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by Trainguy View Post
Typical slick propaganda that doesn't tell the whole story. I hope the protests ramp up even more and make people more aware of the mess this street car will create.
What kind of stories they don’t tell, other than the huge costs with low returns?
     
     
  #5260  
Old Posted Jun 7, 2018, 2:56 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by Firebrand View Post
What kind of stories they don’t tell, other than the huge costs with low returns?
For starters that video smooths out most of the corners in the route - the only one it clearly shows is 104th to City Parkway.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:51 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.