HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jun 4, 2018, 1:27 PM
dmacc dmacc is offline
Registered User
 
Join Date: Dec 2017
Location: Winnipeg
Posts: 1,712
I hope you're right, I'm a bit more pessimistic though. I think after TNS and 300 main are built that we will see a slower growth in the downtown. I believe the apartments at 300 Assiniboine are only 30% filled. It may take a little longer to fill those suites. With the sale of 185 Smith we are essentially adding an extra apartment building to the market. I think we may see a bit of a pause to the building downtown. I do however believe we will see the positive windfalls as those sites begin to fill. We should see an increase of 25-30% in the downtown population. That will help with the critical mass, I just think were looking at something that will take closer to a decade to come to fruition.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 2:33 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.