Quote:
Originally Posted by SgtNeonPanda
The Expo Line at King George isn't configured very well to run to Langley either. Lougheed station wasn't well suited for the end design of the Evergreen extension either. In the scheme of things, the costs of adjusting the terminus stations would be a small percentage of the cost of an extension. Plus, it might be useful for short-turning.
|
Expo Line ends at King George with a tail track pointing southwest, toward the direction of Langley. The tail track lined up exactly at the center of Fraser Highway.
Millennium Line at Lougheed had a pre-build, unfinished third platform, with pre-build switch and banked track stub. Even the pillar leaves space for the future curve toward north road.
Evergreen Extension at Coquitlam have track stub and switches pre-built for potentional PoCo extension, and points toward the right direction, at an empty space between the warehouses and CPR track.
Evergreen Extension at Lafarge points north toward Westwood Plateau, with tail track pointing at park land beside the street, and high enough to cross over the entrance just beyond the station.
Even for Richmond-Brighouse... it's pointing south toward the possible extension direction.
Surrey LRT at Newton, however, there is no tail track, nor there's enough space for them. The station is East-West whereas the future extension should run south. The track also points directly toward Newton Area. So if they indeed decide to extend the line, are they going to shutdown Newton station for years during construction, or demolish Newton Area so they can make the track turn back to the main street?
It's just telling me that "future extension" is not even part of this plan. Basically, for the few advantage that LRT had over SkyTrain on this route, they are likely not taking advantage of any of them.