HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 24, 2018, 9:30 PM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
Quote:
Originally Posted by Azure View Post
Interesting. I would imagine they are still deciding who is doing other stuff like the steel work, electrical, carpentry etc?
Most major work is probably sorted out, ie steel because of required production lead times.

Things like flooring and finishes might be awarded, but obviously have way more flexibility going forward due to later installation.
Quote:
Originally Posted by rkspec View Post
The second TD sign compliments the existing one.

Also, the green on blue is kind of growing on me too.
I thought the second TD sign was also off centre, but also lower than the first TD sign lol.

I wonder who the "you had ONE JOB" guy is in this scenario haha!
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 11:03 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.