Quote:
Originally Posted by Kitchissippi
Might not be for hardcore TOD, but certainly within the catchment of collector bus routes. 2 kms isn't much, development has already crept beyond Pink. The big box centre could also be feasibly reconfigured and redeveloped to a more pedestrian focused area.
|
It could definitely be served with collector routes - agreed.
But that moots the argument that Allumettières could leverage greenfield TOD. After all, if you can't walk to it from transit, it just simply isn't TOD - hardcore, softcore, or otherwise.
So in a Chemin d'Aylmer scenario, instead of taking a collector bus to Allumettières, that same bus could continue another 1,5 km south. Because here's the thing - because of its pronounced curve north, Allumettières isn't actually a shorter route than Chemin d'Aylmer for anyone living west of Vanier Rd - it's about equivalent. But Allumettières
is a significantly longer route for anyone south of it. It's one of the reasons I'm not crazy about the route - it disadvantages the vast majority of Aylmer's population which lives to the south of the highway without significantly improving things for those living north of it.
And then the TOD arguments also enter in Chemin d'Aylmer's favour. I feel like we've established that Chemin d'Aylmer presents more opportunities for TOD greenfield development since it has more undeveloped, underperforming and
developable (unlike, say the parkland south of Allumettières or Forêt Boucher) land right beside it. In terms of redevelopment, you're right that the Smart Centre could be redeveloped. So could the Galeries d'Aylmer, which is of similar size. However, the Smart Centre is still doing well as it is and doesn't have as much incentive to reinvent itself because of that.