  #1141  
Old Posted Apr 7, 2018, 12:54 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
April 6, 2018 Pictures:

Not many changes but I'll post pictures anyway.



^^^^ I had a look at the walls between the units, and I don't see any double walls. Perhaps they will double up the walls between the units later. I can think of a whole host of logistical issues regarding constructing double walls, especially if there is drywall on one or both of the inside surfaces (as shown in the diagram in a previous post). Right now there does not appear to be any drywall being installed, but they are doing the plumbing and wiring.











^^^^ The red crane has not been used since it was moved. Part of the boom is still on the ground.
Reply With Quote
     
     
  #1142  
Old Posted Apr 7, 2018, 12:57 AM
YXE YXE is offline
Registered User
 
Join Date: Jun 2017
Posts: 285
Man, looks like the hotel and parkade are progressing really well. Would be nice to see a similar pace on the condo. I am growing impatient! Thanks for the pics.
Reply With Quote
     
     
  #1143  
Old Posted Apr 7, 2018, 8:20 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
It looks like tonnes of progress on all fronts! Now that height has plateaued, you've got to look a bit closer to see all the work that's being done on the condo. But then, if you've bought a unit, of course it'll never be fast enough until you get your bed into it! Cheers!

And thanks for the pics! For me, the changes are big. Two floors of the hotel are now ready for siding. The 3rd/4th floor of the condo is getting glass. The pit is deepening and widening.

Not much happening? Okay. But don't say that to the workers!>)
Reply With Quote
     
     
  #1144  
Old Posted Apr 7, 2018, 8:48 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
...And instead of doubling up thinner walls, can't they just make outer walls (studs) thicker? Like going from 5 to 10 cm, or 10 to 20? That's what I thought they'd be doing between units and for hallways, and that's what it looks like to me on this project.

Whatever. I just know whatever they do (builders), it usually works. High-rises are pretty silent from my experience. It's just so cool to live in a high-rise condo...with a cabin at the lake, of course!>)

Then again, we're all lucky just to be alive. Sorry to hear about the hockey players.

Enough from me!

Last edited by Ricopedra; Apr 7, 2018 at 9:07 PM.
Reply With Quote
     
     
  #1145  
Old Posted Apr 7, 2018, 8:53 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,998
Quote:
Originally Posted by Ricopedra View Post
...And instead of doubling up thinner walls, can't they just make outer walls (studs) thicker? Like going from 5 to 10 cm, or 10 to 20? That's what I thought they'd be doing between units and for hallways, and that's what it looks like to me on this project.

Whatever. I just know whatever they do (builders), it usually works. High-rises are pretty silent from my experience. It's just so cool to live in a high-rise condo...with a cabin at the lake, of course!>)

Enough from me!
Two thin walls with studs that do not make contact is far quieter than one thick wall.
Reply With Quote
     
     
  #1146  
Old Posted Apr 7, 2018, 9:29 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
Right. So. Back to Alt_Center and what he doesn't see from his observations. Patience, I guess;>)
Reply With Quote
     
     
  #1147  
Old Posted Apr 8, 2018, 3:43 PM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
Of course there is lots of progress. To me the next big milestone will be some siding on the hotel. Ledcor construction seems to be consistently working on weekends on the parkade excavation, which is getting gigantic. But now that the condo has topped out we're not going to be seeing a new floor per week. Until the office starts rising

Couple of pics from my run yesterday:



^^^ Everytime I look at the gallery I like it more. It pays tribute to the prairie water, land and sky. And even snow.



^^^^ It will be quite a sight if the north tower, which will be significantly taller than the condo, ever gets built. I really do feel that downtown is on the cusp of a renaissance, with the BRT, potential arena, potential grocery store, etc.
Reply With Quote
     
     
  #1148  
Old Posted Apr 9, 2018, 8:50 AM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
^Nice! That pic from Optimist Park(?) is a new perspective. Lookin' good!

Me Bro swims at Harry B. and sez he can see it from there, popping up about 4 stories over the downtown remand centre, aka H.I. Cheers!
Reply With Quote
     
     
  #1149  
Old Posted Apr 9, 2018, 8:59 AM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
Btw, it looks like there's a drone up casing the scene in your first pic...that'll be a good view!

Also, like you were saying Alt, awesome view once that tall one gets poured in the back. But then, I just had a vision of these guys building that original-height 27 (or 28) story condo on this 'leftover' site instead of an office building (if there's no interest for big-digs within a certain time), and throw Trivost(sp) a bone by helping them with RL2. Just a thought to speed things up if necessary;>) There's not a restaurant, pub or new grocery store downtown that would shake a stick at that! Prost!

[Too bad Cameco has no balls or pride. (Ah, give em a raise, anyway!) Does Mosaic have offices here? Nuff said n done! ~But hopefully the 2nd office tower does find a major tenant.]

Last edited by Ricopedra; Apr 9, 2018 at 3:17 PM. Reason: add
Reply With Quote
     
     
  #1150  
Old Posted Apr 12, 2018, 6:19 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
Nevermind

Last edited by Ricopedra; Apr 12, 2018 at 6:30 PM.
Reply With Quote
     
     
  #1151  
Old Posted Apr 13, 2018, 12:23 AM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
I am tooting my own horn, but I am telling you all that the River Landing Parkade is the NICEST looking appearance wise that I have EVER seen. It is well lit and bright and not a BLEMISH on the entire interior walls, columns and roof.

I did some take offs last week of the River Landing East tower. I have almost 330,000 sq ft between the parkade and tower component. Each Parkade level is approx 32,652 sq ft!
Reply With Quote
     
     
  #1152  
Old Posted Apr 13, 2018, 2:30 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,998
Quote:
Originally Posted by dsmmace View Post
I am tooting my own horn, but I am telling you all that the River Landing Parkade is the NICEST looking appearance wise that I have EVER seen. It is well lit and bright and not a BLEMISH on the entire interior walls, columns and roof.

I did some take offs last week of the River Landing East tower. I have almost 330,000 sq ft between the parkade and tower component. Each Parkade level is approx 32,652 sq ft!
Yes new parkades are nicer than old parkades. They are usually painted white inside and have lots of energy efficient lighting. They do get dirtier and banged up after a few decades.
Reply With Quote
     
     
  #1153  
Old Posted Apr 17, 2018, 12:24 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
April 16, 2018 Pictures:



^^^^ Still no siding on the hotel



^^^^ More glass and a banner





^^^^ Crane base installed





^^^^ Three excavators on the go today.
Reply With Quote
     
     
  #1154  
Old Posted Apr 17, 2018, 2:46 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
The fit and finish is moving along. V-cool and nice to see! Thanks, Man!
I think the height increases we used to see can now be replaced by window wall installs:>)
Reply With Quote
     
     
  #1155  
Old Posted Apr 19, 2018, 7:58 PM
Crisis's Avatar
Crisis Crisis is offline
Registered User
 
Join Date: Apr 2010
Posts: 1,330
2nd tower crane (the one down in the hole) at the office parkade should be getting erected tomorrow. Foundations to start next week, though there will still be excavation work happening as they work their way out of the hole.

They've been digging down for 4 months, now we get to watch it start to rise.
Reply With Quote
     
     
  #1156  
Old Posted Apr 19, 2018, 10:47 PM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Nanaimo, British Columbia
Posts: 676
I was hoping to see 3 cranes on site. Even if the height is minimal and 3 wont be around long..be cool to see for a little bit though with all on site working at the same time. Might as well get the 'rare' photograph lol
Reply With Quote
     
     
  #1157  
Old Posted Apr 20, 2018, 4:37 AM
YXE YXE is offline
Registered User
 
Join Date: Jun 2017
Posts: 285
I would imagine that this underground lot will attract many who work near by etc.; thus, creating 'competition' for the many nearby lots. I hope that this competition (which people will of course prefer to an outdoor parking lot that's exposed to the elements) will create some pressure to develop more quickly.
Reply With Quote
     
     
  #1158  
Old Posted Apr 21, 2018, 12:41 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
April 20 Pictures



^^^^ From bottom of Broadway Bridge



^^^^ From top of Broadway Bridge



^^^^ Could not see my screen while taking these pictures...





^^^^ Glass going onto 5th floor already!
Reply With Quote
     
     
  #1159  
Old Posted Apr 21, 2018, 2:02 AM
saskatoonborn saskatoonborn is offline
Registered User
 
Join Date: Aug 2013
Posts: 297
Once again all beautiful pictures Alt!I am kind of surprised that the hotel windows arn't all done yet they must be taking some time to manufacture. seems like they did about a third then stopped for a few weeks then did another third.
Reply With Quote
     
     
  #1160  
Old Posted Apr 24, 2018, 1:18 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
April 23 Pictures



^^^^ Hard to see but Riders and Rush flags on the cranes.



^^^^ They are excavating a very steep wall into the dirt on the west side. Its hard to get a good look at it but I think there are some anchors in the dirt wall.



^^^^ Its hard to see into the interior but this looks like it could be a double wall between units.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 9:53 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.