Quote:
Originally Posted by CoryB View Post
So glad to see this Under Construction.
Or at least "Site Prep". Like, er, Capital Pointe.
Reply With Quote
     
     
  #1842  
Old Posted Apr 6, 2018, 7:08 PM
tvor202 tvor202 is offline
Registered User
 
Join Date: Nov 2016
Posts: 64
Quote:
Originally Posted by Roger Strong View Post
Or at least "Site Prep". Like, er, Capital Pointe.
haha... should probably update the thread
Reply With Quote
     
     
  #1843  
Old Posted Apr 11, 2018, 8:13 PM
vid's Avatar
vid vid is offline
I am a typical
 
Join Date: Apr 2004
Location: Thunder Bay
Posts: 39,065
This site generally doesn't consider a building to be under construction until the structure is rising above street level.
Reply With Quote
     
     
  #1844  
Old Posted Apr 12, 2018, 3:38 AM
Bluenote Bluenote is offline
BANNED
 
Join Date: Jun 2012
Location: Winnipeg / St Vital
Posts: 1,101
Quote:
Originally Posted by vid View Post
This site generally doesn't consider a building to be under construction until the structure is rising above street level.
Well technically it has been above street lvl for 38 years lol
Reply With Quote
     
     
  #1845  
Old Posted Apr 12, 2018, 3:21 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,374
They've had the new mechanical exhaust location installed above street level since last year.

What exactly was being poured on the last page? Something underground?
Reply With Quote
     
     
  #1846  
Old Posted Apr 12, 2018, 4:00 PM
dmacc dmacc is offline
Registered User
 
Join Date: Dec 2017
Location: Winnipeg
Posts: 1,712
Quote:
Originally Posted by bomberjet View Post
They've had the new mechanical exhaust location installed above street level since last year.

What exactly was being poured on the last page? Something underground?
My guess is they were pouring the concrete for the reinforcement of the foundations they've been working on.
Reply With Quote
     
     
  #1847  
Old Posted Apr 12, 2018, 4:24 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,374
Right. The column strengthening and whatever else they're doing.
Reply With Quote
     
     
  #1848  
Old Posted Apr 16, 2018, 10:31 PM
BuildUpWpg BuildUpWpg is offline
Registered User
 
Join Date: Nov 2014
Posts: 470
There are now little sections of the food court in Wpg Square enclosed in temporary drywall. I assume more prep work going on for the new tower? Things are moving at a snails pace on this project (compared to how quickly True North got up and going), but at least they are moving! I wonder when the brown caps covering the original piles on the roof of the food court are going to get removed and work started on what ever needs to be done with those piles.
Reply With Quote
     
     
  #1849  
Old Posted Apr 16, 2018, 11:09 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
Umm there has been a ton of work going on for it already. Most of it out of sight though.
Reply With Quote
     
     
  #1850  
Old Posted Apr 17, 2018, 12:53 PM
dmacc dmacc is offline
Registered User
 
Join Date: Dec 2017
Location: Winnipeg
Posts: 1,712
I think it was just easier to see at TNS because it was just one big hole. It took almost a year I feel before the hole got to ground level. 300 will get there... I'm impatient also. I just want to see a crane on site already. I hope they have a camera to show progress just like TNS.
Reply With Quote
     
     
  #1851  
Old Posted Apr 17, 2018, 3:30 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 6,206
This has been "above grade" since work started something like a year ago now.

Among the changes that are visible:

- the southeast corner of the food court was configured
- Chamberlains was gutted and turned into something site related
- the retail stalls opposite Shoppers said to be the elevator shafts are being cleared of tenants
- to the Fort side of the food court major new duct word was installed
- the mall entrance closer to Portage has had all tenants removed including several relocations within the mall.
- there is a visual facelift of the mall itself underway.

And I am sure I has missed a whole bunch. This has definitely moved well past being "proposed".

As for some of the work being "slow" I think the landlord has a long standing arrangement that work on the mall level doesn't happen during hours it is open. That would seem to explain why other changes seemingly take forever, ie Pizza Hotline being almost a full year behind their originally posted opening date.
Reply With Quote
     
     
  #1852  
Old Posted Apr 17, 2018, 4:22 PM
DowntownBooster DowntownBooster is offline
Registered User
 
Join Date: May 2006
Posts: 320
Quote:
Originally Posted by dmacc View Post
I think it was just easier to see at TNS because it was just one big hole. It took almost a year I feel before the hole got to ground level. 300 will get there... I'm impatient also. I just want to see a crane on site already. I hope they have a camera to show progress just like TNS.
I think that's what we're all waiting for.
Reply With Quote
     
     
  #1853  
Old Posted Apr 17, 2018, 8:22 PM
robertocarlos robertocarlos is offline
Registered User
 
Join Date: Jul 2015
Posts: 820
The new work in the food court is to strengthen the elevator shafts with new columns on the corners and thicker concrete walls.
Reply With Quote
     
     
  #1854  
Old Posted Apr 18, 2018, 5:42 PM
BuildUpWpg BuildUpWpg is offline
Registered User
 
Join Date: Nov 2014
Posts: 470
Quote:
Originally Posted by robertocarlos View Post
The new work in the food court is to strengthen the elevator shafts with new columns on the corners and thicker concrete walls.
Also, if you look through the opening in the temporary wall set up in the entrance of Shoppers, you can see a bunch of holes drilled into the column that's in there. I assume that will be done as well to all the visible and non-visible columns in that whole end of the mall.
Reply With Quote
     
     
  #1855  
Old Posted Apr 18, 2018, 6:22 PM
DowntownBooster DowntownBooster is offline
Registered User
 
Join Date: May 2006
Posts: 320
Quote:
Originally Posted by robertocarlos View Post
The new work in the food court is to strengthen the elevator shafts with new columns on the corners and thicker concrete walls.
I'm not sure I understand the need to strengthen the columns before the tower goes up. Had they proceeded with the second office tower when the first one was going up, does it mean that the columns that were originally poured would have been too weak to actually support it? I had thought that although the tops of the columns were capped due to the second tower not going up as originally planned, the columns would be ready should a structure go up in the future.
Reply With Quote
     
     
  #1856  
Old Posted Apr 18, 2018, 6:57 PM
OTA in Winnipeg OTA in Winnipeg is offline
Registered User
 
Join Date: Mar 2016
Location: Silver Heights
Posts: 1,798
Quote:
Originally Posted by DowntownBooster View Post
I'm not sure I understand the need to strengthen the columns before the tower goes up. Had they proceeded with the second office tower when the first one was going up, does it mean that the columns that were originally poured would have been too weak to actually support it? I had thought that although the tops of the columns were capped due to the second tower not going up as originally planned, the columns would be ready should a structure go up in the future.
As I understand it they are building a tower approximately ten stories taller than it was originally designed for. Also steel frame construction if that makes any difference.
Reply With Quote
     
     
  #1857  
Old Posted Apr 18, 2018, 7:07 PM
Cam Cam is offline
Registered User
 
Join Date: Oct 2011
Location: Wpg
Posts: 56
Quote:
Originally Posted by DowntownBooster View Post
I'm not sure I understand the need to strengthen the columns before the tower goes up. Had they proceeded with the second office tower when the first one was going up, does it mean that the columns that were originally poured would have been too weak to actually support it? I had thought that although the tops of the columns were capped due to the second tower not going up as originally planned, the columns would be ready should a structure go up in the future.
Building codes have changed, as has the plan for the new tower
Reply With Quote
     
     
  #1858  
Old Posted Apr 18, 2018, 8:42 PM
DowntownBooster DowntownBooster is offline
Registered User
 
Join Date: May 2006
Posts: 320
Quote:
Originally Posted by OTA in Winnipeg View Post
As I understand it they are building a tower approximately ten stories taller than it was originally designed for. Also steel frame construction if that makes any difference.
I think the fact it is to be steel construction is what caused a little confusion for me. Although the new tower is to be about 10 stories taller than the building originally planned for the site, I thought the steel would be lighter weight than concrete and that the original columns could handle the load. I guess that isn't the case after all.
Reply With Quote
     
     
  #1859  
Old Posted Apr 18, 2018, 8:44 PM
DowntownBooster DowntownBooster is offline
Registered User
 
Join Date: May 2006
Posts: 320
Quote:
Originally Posted by Cam View Post
Building codes have changed, as has the plan for the new tower
I'm kind of glad the original tower did not go up as I think this new one will look so much better.
Reply With Quote
     
     
  #1860  
Old Posted Apr 18, 2018, 8:47 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by DowntownBooster View Post
I'm kind of glad the original tower did not go up as I think this new one will look so much better.
You think so? I like the height of this and one and clearly it will be a modern addition to the skyline, but that said I think there is something to be said for the sizable floorplate of the original proposal. 300 Main will only cover a small portion of the overall site... by contrast, the original design would have covered almost the entire south end of the block.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:55 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.