Quote:
Originally Posted by GlassCity
Yeah, in terms of service to the Fraser Valley exurbs, I think we're doing fine for the demand and population that exists there. You could theoretically bus from Hope to Vancouver, though it would take forever.
|
Population of Hope: 5,000. Doesn't make sense to bring rail to hope, unless it's on the way to somewhere more populous.
Abbotsford, though, that's what the WCE is, Mission is essentially the Surrey of Abbotsford ( geographically speaking... it's across the river )
Quote:
|
But the point is, those communities are being slowly woven into the overall Lower Mainland transit system, and we can keep building from that. Demand will build and service will increase accordingly. Same with the HSR idea from Vancouver to Portland. Keep improving what we have now, and make that jump when needed. I think some people are just too impatient and want the highest level of service, even when there may not be the demand for it.
|
I do agree, but I think that without political push into it, we wont' have the corridors. The corridor is a geographically a good fit for HSR, to be honest. This is particularly with an unpredictable border crossing. The approaches into both cities is what is the most challenging and preserving corridors really should be a high priority.
We don't even have an idea of what a corridor would LOOK like. Follow #99 to a station at the airport? Go up 176th to #1 and then the Grandview cut?
GO through Surrey like it does now? A new GM bridge with a rail component?
[quote]
To give it a comparison, the future route between Kanazawa and Osaka has been talked about for years, particularly the last 185km between Tsuruga and Osaka. It's an expensive proposition, and they need all new tracks ( most trains in Japan are narrow gauge and not compatible with HSR trainsets at all ).
Anyhow, they JUST decided on a route this year, and the planned construction date is to start in 2030 to be completed in 2045. Japan is really crazy about planning and takes forever to make decisions, and it STILL takes time.
I think (and others agree) that for Vancouver-Seattle is that we should be considering alignment now and preserving ROWs now. YVR had the Canada Line built at ground level, because they had a plan ( that was decades away ) of building an overpass connecting North and South runways. They were planning for the future of being a 30 Million pax airport.
We should be planning for the future of being a 20 million person corridor.
Quote:
|
I'll also never get the fantasy of rail to the ferry terminals. Rail is expensive as all hell, and has way too much capacity that would not come close to being filled by the couple hundred people an hour that come in by ferry. For rail to make sense, you need a consistent heavy stream of people taking it in both directions. Ferry terminals don't provide that type of trip generation.
|
I agree with this. train to the boat is just people connecting lines on a map. The Ferry doesn't come often enough and is too remote to justify a station. A shuttle bus to a station up the hill at Horseshoe bay would work just as well.