Posted Mar 30, 2018, 1:18 AM
|
 |
New Yorker for life
|
|
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 56,214
|
|
https://commercialobserver.com/2018/...e-to-be-saved/
Does 270 Park Avenue Deserve to Be Saved?
BY REBECCA BAIRD-REMBA
MARCH 28, 2018
Quote:
The disassembly of buildings like Union Carbide is exactly what the city intended when it dramatically upzoned Midtown East in August 2017. Mayor Bill de Blasio’s administration hoped that the new zoning would encourage the redevelopment of the area’s century-old office stock, which has been eclipsed by newer buildings in hipper parts of Manhattan.
Still, preservationists were shocked to hear that 270 Park would meet the wrecking ball. “270 Park was not even identified as a development site” because the building already took up much of the site’s potential floor area, said Simeon Bankoff, the president of the Historic Districts Council. “Honestly it took everyone I know by surprise. The rezoning really changed the rules for development in East Midtown.”
When Union Carbide bites the dust early next year, the 1.3-million-square-foot structure—which occupies a full block between Park and Madison Avenues and East 47th and 48th Streets—will be the world’s largest voluntary demolition. It will take that title from the Singer Building, the 47-story, 612-foot tall skyscraper at 149 Broadway that was constructed in 1908 and torn down in 1967 to make room for One Liberty Plaza.
|
Quote:
Robert Knakal, the chairman of New York investment sales at Cushman & Wakefield, pointed out that once the bank considered the cost of land in Midtown, it was cheaper to demolish and rebuild at 270 Park than to buy another site and try to develop it.
“If that was a vacant lot today, the land value would be arguably approaching $1,000 a square foot,” he said. “So by the time they demolish the building, their land basis is going to be less than that. And that’s a heck of a lot less than it would be today.” (Land basis equals what you paid for the property, plus the cost of capital improvements and construction.)
|
Quote:
Construction experts predict that it will take at least a year to demolish the 700-foot-tall property, which will have to be torn apart mostly by hand.
First, in order to prevent dust and debris from affecting neighboring buildings or people walking by, the project’s contractor will shroud the building in scaffolding or netting. Then workers will have to remove any harmful materials, like asbestos and lead paint, and use hand tools to remove windows, fixtures and doors. The deconstructing of the building comes next. Metal facade panels would be carefully removed by hand. Excavators—like BobCats—and smaller tools would likely be used to break apart the concrete slabs of each floor, although some projects have deployed demolition robots to accomplish the task. In the final steps of the demolition, workers would take acetylene torches to the steel beams and superstructure, cutting the steel into smaller pieces floor by floor.
Ken Colao, of CNY Construction, explained the demolition of such a large building offers an opportunity to think about more efficient ways to take apart skyscrapers. “New regulations need to be developed with the building department to address the demolition of large-scale developments,” he said. “The current method—to enclose it with scaffolding and dismantle it by hand with small equipment—would be too time consuming.”
The contractors on 270 Park could use cranes to remove large pieces of the building. And disassembling the steel frame could be faster if workers cut through pieces of steel, and then a crane lifted the steel onto a truck, he said.
|
__________________
NEW YORK is Back!
“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
|