HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #4941  
Old Posted Mar 29, 2018, 8:04 PM
Canucks223 Canucks223 is offline
Registered User
 
Join Date: Mar 2018
Posts: 87
There will never be an expansion on the LRT to South Surrey/White Rock. Surrey cant justify the cost of it since there are several km's of nothing south of Newton. The cost would be enormous and they think there isn't enough ridership in that area.
     
     
  #4942  
Old Posted Mar 29, 2018, 8:20 PM
Rico Rico is offline
Registered User
 
Join Date: Feb 2012
Posts: 319
Quote:
Originally Posted by Reecemartin View Post
People keep acting like these intersections won't be signalized. Given that pretty much the only chance of getting t-boned by an LRV is by running a red light, or disobeying another signal. Again since the only place where trains and cars interact is intersections.

In terms of the Downtown the intersections are less of an issue since the streets are not intended to carry significant car traffic in the future. At the intersection with KGB the trains will cross with other cross traffic.
The Edmonton intersection is signalized. The problem is the effects on road traffic are so bad they are reducing the effectiveness of the LRT. The same will happen at this intersection, every train will back traffic up enough they will not be able to clear the backlog unless frequency is more than 5 minutes....and maybe more. The result will be they will either drop signal priority resulting in more reliability issues and slower speeds or they will have poor frequency. Take this intersection out and the LRT can have the capacity you think it will. Keep it in and it will have the capacity calculated by Surrey and talked about forever here.
     
     
  #4943  
Old Posted Mar 29, 2018, 9:06 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,799
Quote:
Originally Posted by Reecemartin View Post
If LRT gets built its not going to be ripped up. Plan and simple, the world is moving away from private automobiles and all the transit capacity we can muster will be needed.
This statement is self-contradictory, since LRT will at some point have to be replaced by something that can handle more people.
     
     
  #4944  
Old Posted Mar 29, 2018, 9:39 PM
KPELLY KPELLY is offline
Registered User
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 159
Quote:
Originally Posted by aberdeen5698 View Post
This statement is self-contradictory, since LRT will at some point have to be replaced by something that can handle more people.
He's really good at that.
     
     
  #4945  
Old Posted Mar 29, 2018, 10:19 PM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
Quote:
Originally Posted by aberdeen5698 View Post
This statement is self-contradictory, since LRT will at some point have to be replaced by something that can handle more people.
The LRT lines in Surrey will almost certainly never require an upgrade in capacity. They are well fitted to their context. Even if they did need upgrading at some point - say 50 years from now - transportation will have changed so much by then (self driving cars / drones?) that public transit will be irrelevant.

LRT is not intended as a regional commuter train - they are more localized transit lines that require more capacity than bus.

Every rapid transit line in a city does not need to be SkyTrain. Major cities all over the world function with complex rapid transit networks that have both subways, elevated, and LRT all combining to form a layered grid serving different purposes.

The L-line is the first introduction of a new layer to our transit system - and will likely be introduced elsewhere. Get used to it.
     
     
  #4946  
Old Posted Mar 29, 2018, 10:58 PM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by Shift View Post
The LRT lines in Surrey will almost certainly never require an upgrade in capacity. They are well fitted to their context. Even if they did need upgrading at some point - say 50 years from now - transportation will have changed so much by then (self driving cars / drones?) that public transit will be irrelevant.

LRT is not intended as a regional commuter train - they are more localized transit lines that require more capacity than bus.

Every rapid transit line in a city does not need to be SkyTrain. Major cities all over the world function with complex rapid transit networks that have both subways, elevated, and LRT all combining to form a layered grid serving different purposes.

The L-line is the first introduction of a new layer to our transit system - and will likely be introduced elsewhere. Get used to it.
You keep spitting the same old rhetoric about LRT for the past couple of pages in this thread. It does not work at all on Fraser Hwy. Just because LRT/streetcars/trams are popular around the world doesn’t mean they’re the “best” type of “rapid transit”, it because it’s the cheapest form. What Surrey is doing is putting a horribly implemented LRT in one of the busiest streets in the Lower Mainland. I feel like I’m in Edmonton doing this.

Also, it is better to have consistency within the rapid transit system to bring costs down and reduce transfers. The Canada Line would be better for that (had it not fallen to the Province’s P3 🞵🞵🞵🞵), but even then, you still have to transfer since it’s a North-South line, so it gets somewhat a pass. The Langley Line, however, is no excuse.
     
     
  #4947  
Old Posted Mar 29, 2018, 11:01 PM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by KPELLY View Post
He's really good at that.
I dread when I read comments like that.
     
     
  #4948  
Old Posted Mar 29, 2018, 11:20 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,729
Quote:
Originally Posted by Firebrand View Post
It does not work at all on Fraser Hwy.
How do you know? Are you a transportation planner or engineer? Throwing bold around words doesn't make your statement more true.

There's a whole lot of "definitive" statements being thrown around here without much to back them up, and it's coming from everybody. You can point at Edmonton as an example of a "failed" LRT system just fine, but it's different from Surrey. Others can point to other cities as examples of fantastic LRT systems, but they're different from Surrey too. Maybe LRT down Fraser Highway would work, maybe it won't, but you can't come out and say "it does not work at all on Fraser Highway" without anything at all to back that up.
     
     
  #4949  
Old Posted Mar 29, 2018, 11:25 PM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
I got that info from Skytrain for Surrey.

Last edited by Firebrand; Mar 29, 2018 at 11:26 PM. Reason: Forgot to put a link
     
     
  #4950  
Old Posted Mar 29, 2018, 11:27 PM
Galaxy's Avatar
Galaxy Galaxy is offline
Registered User
 
Join Date: Mar 2017
Location: Vancouver
Posts: 475
I feel like for 248+/- Pages of this thread we could probably condense it down a lot considering the same thing gets talked about over and over and over again like an infinite loop.

Although since Translinks looking for a new OMC for the existing Skytrain network I would think it makes sense to make the new OMC in Surrey for both the existing fleet increase and the extension of the network to Langley. Therefore Translink is making a single large investment that benefits there strategic goal. Also, it would be nice if the provincial government could convince Bombardier to build the manufacturing plant in Surrey to build the new trains there as well then convert the space over to the new maintenance centre after the trains are built. I see this as a win-win since it will create jobs in Surrey and give everybody(region-wide) what they want. Just my 10 cents in the topic.
     
     
  #4951  
Old Posted Mar 29, 2018, 11:29 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,174
Quote:
Originally Posted by Reecemartin View Post
Literally talking about White Rock and the 321, are you really arguing that an electrified train in a dedicated ROW is going to be only slightly faster than a bus that is packed to the brim and stops seemingly every 2 blocks and runs in mixed traffic....

The 96 does not go to White Rock

I will ask you yet again to read what someone has said and to research routings etc. before you start telling people they are wrong.
A) The 96 doesn't go to White Rock right now. No reason it can't be extended for much less than $1B.

B) One more time: Surrey's own study shows a two-minute improvement over current 96 service, and by extension, saves four minutes going to White Rock.
     
     
  #4952  
Old Posted Mar 29, 2018, 11:41 PM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
This whole thread is a time loop. Maybe we should take Galaxy’s advice to break that loop.
     
     
  #4953  
Old Posted Mar 30, 2018, 12:03 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,174
Quote:
Originally Posted by Shift View Post
LRT is not intended as a regional commuter train - they are more localized transit lines that require more capacity than bus.

Every rapid transit line in a city does not need to be SkyTrain. Major cities all over the world function with complex rapid transit networks that have both subways, elevated, and LRT all combining to form a layered grid serving different purposes.
And that's the problem right there - the major cities in question have a subway/elevated backbone to do all the heavy lifting, leaving streetcars and trams to pick up the slack. It works because each technology has a niche that complements the other; RRT as rapid transit across the city, LRT as semi-rapid transit for more local trips.

There will be no RRT backbone within the SoF region to do the heavy lifting for the LRT - the LRT will have to BE the backbone.

Quote:
Originally Posted by Shift View Post
The LRT lines in Surrey will almost certainly never require an upgrade in capacity. They are well fitted to their context.


^ So this isn't going to happen? If Newton-Whalley-Guildford grows into a concrete jungle the way Surrey First want it to, the LRT ends up overcapacity and makes the Canada Line look like a stretch limo. If it doesn't, and it ends up as townhomes and low-rises the way you predict the Langley line will, then all we need is better bus service. Either way, LRT on King George is a solution in search of a problem.

Quote:
Originally Posted by Shift View Post
Even if they did need upgrading at some point - say 50 years from now - transportation will have changed so much by then (self driving cars / drones?) that public transit will be irrelevant.
Even if Uber somehow breaks even with autonomous cars ($5 a trip and still losing money), they've still got basic physics to deal with.

Technology marches on, math doesn't. A grade-separated rapid transit network is still the most effective way to move around a city.

Quote:
Originally Posted by Shift View Post
The L-line is the first introduction of a new layer to our transit system - and will likely be introduced elsewhere. Get used to it.
Yeah, about that...

LRT would work on the Arbutus ROW. It'd work on the Marine Drive ROW. It'd work on Surrey's interurban. Expecting it to work on a busy street like KGB? Don't hold your breath.
     
     
  #4954  
Old Posted Mar 30, 2018, 12:12 AM
cganuelas1995 cganuelas1995 is online now
Registered User
 
Join Date: Jan 2017
Posts: 1,663
Quote:
Originally Posted by Migrant_Coconut View Post
And that's the problem right there - the major cities in question have a subway/elevated backbone to do all the heavy lifting, leaving streetcars and trams to pick up the slack. It works because each technology has a niche that complements the other; RRT as rapid transit across the city, LRT as semi-rapid transit for more local trips.

There will be no RRT backbone within the SoF region to do the heavy lifting for the LRT - the LRT will have to BE the backbone.





^ So this isn't going to happen? If Newton-Whalley-Guildford grows into a concrete jungle the way Surrey First want it to, the LRT ends up overcapacity and makes the Canada Line look like a stretch limo. If it doesn't, and it ends up as townhomes and low-rises the way you predict the Langley line will, then all we need is better bus service. Either way, LRT on King George is a solution in search of a problem.



Even if Uber somehow breaks even with autonomous cars ($5 a trip and still losing money), they've still got basic physics to deal with.

Technology marches on, math doesn't. A grade-separated rapid transit network is still the most effective way to move around a city.



Yeah, about that...

LRT would work on the Arbutus ROW. It'd work on the Marine Drive ROW. It'd work on Surrey's interurban. Expecting it to work on a busy street like KGB? Don't hold your breath.
Could a streetcar work in White Rock, as part of a tourism/vanity project?
     
     
  #4955  
Old Posted Mar 30, 2018, 12:17 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,174
Quote:
Originally Posted by cganuelas1995 View Post
Could a streetcar work in White Rock, as part of a tourism/vanity project?
If a streetcar in Steveston won't work, I don't see why a streetcar in White Rock would.
     
     
  #4956  
Old Posted Mar 30, 2018, 12:49 AM
Cypherus's Avatar
Cypherus Cypherus is offline
Registered User
 
Join Date: Jan 2007
Location: Surrey
Posts: 1,759
Quote:
Originally Posted by Migrant_Coconut View Post
And that's the problem right there - the major cities in question have a subway/elevated backbone to do all the heavy lifting, leaving streetcars and trams to pick up the slack. It works because each technology has a niche that complements the other; RRT as rapid transit across the city, LRT as semi-rapid transit for more local trips.
Are you not just agreeing with what Shift indicated when there needs to be multiple layers of transit to serve a common purpose? Central City already has RRT to support the concrete jungle you show in the render. That concrete jungle is actually growing because RRT has been the backbone that connects Surrey to the rest of the region.

LRT will simply herd people from the satellite areas of Surrey into downtown Central City. It's a slower alternative to collect people from surrounding areas, but it achieves transportation into the city core. From there they can jump on RRT and travel the region and go to work. In the process of collecting people from the satellite areas of Surrey, the city believes it will achieve density and community development along its multiple corridors. At least that is the vision and idea.

I understand you want RRT to go "across the city" to connect the small town centres with a rapid commuter train - connecting people to the region immediately. That is not what the city wants due to aforementioned reasons. Even Vancouver doesn't have skytrain across the city, perhaps because it is not suitable or needed with respect to the city's vision and land use policies....but you appear to give Vancouver a pass in your narrative of prior posts.

Quote:
There will be no RRT backbone within the SoF region to do the heavy lifting for the LRT - the LRT will have to BE the backbone.
I agree that perhaps in the future, RRT would be best to connect Langley and eventually Abbotsford to Surrey and to the rest of North of the Fraser. It doesn't hurt from a regional perspective to connect cities, but the problem is that RRT may not be appropriate to connect the smaller communities within a city. It does not influence street level community development that LRT will attempt to do. For example, San Francisco's cable car system pictured below created a wonderful streetside community of 4-5 storey buildings along its corridor. It's pedestrian friendly lined with multiple streetlevel stores and people are regularly collected from outside the downtown area and pulled into the central business district seamlessly.



What the city of San Francisco did years ago would have not been something you would have agreed with.

Quote:
If {LRT} doesn't, and it ends up as townhomes and low-rises the way you predict the Langley line will, then all we need is better bus service. Either way, LRT on King George is a solution in search of a problem.
There are many real world cases where development of apartment buildings and townhomes, as well as mixed use developments, are not "driven" by a rapid bus going down a street. This is because a rapid bus stopping at every red light while queuing up behind cars is not really rapid service, nor a selling feature to people. The City of Surrey and Vancouver already know that, as well as anyone with a basic understanding of city planning and transit. Not sure why you contradict yourself as you previously cite land policy to be a driver in development, and then hear argue "better bus service" can implicitly be that driver. Doesn't work that way.

Quote:
A grade-separated rapid transit network is still the most effective way to move around a city.
Okay, but that is not what the City of Surrey wants, and you keep repeating your narrative. They are not looking for a commuter train to interconnect communities within the city. I also don't think running the line down KGB is a good idea, but I do agree with the city's vision. As long as it is grade separated and KGB is still 4 lanes, they can achieve that vision.
     
     
  #4957  
Old Posted Mar 30, 2018, 1:22 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by Migrant_Coconut View Post


^ So this isn't going to happen? If Newton-Whalley-Guildford grows into a concrete jungle the way Surrey First want it to, the LRT ends up overcapacity and makes the Canada Line look like a stretch limo. If it doesn't, and it ends up as townhomes and low-rises the way you predict the Langley line will, then all we need is better bus service. Either way, LRT on King George is a solution in search of a problem.
That is Downtown Surrey only. King George south of 96th (basically the left side of the image) may end up like Cambie but it's unlikely to be towers down to Newton. I agree with you though that LRT on King George is a solution in search of a problem.
     
     
  #4958  
Old Posted Mar 30, 2018, 1:35 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by Cypherus View Post
I understand you want RRT to go "across the city" to connect the small town centres with a rapid commuter train - connecting people to the region immediately. That is not what the city wants due to aforementioned reasons. Even Vancouver doesn't have skytrain across the city, perhaps because it is not suitable or needed with respect to the city's vision and land use policies....but you appear to give Vancouver a pass in your narrative of prior posts.
Wha...?

Vancouver doesn't have Skytrain across the city??? What is the Expo Line from Waterfront to Joyce, the Canada Line from Waterfront to Marine Drive and the Millennium Line from VCC-Clark to Rupert (also the planned extension along Broadway). That's a lot of Skytrain across the city.

Currently Surrey has a whopping *four* Skytrain stations - for the entire city. Even New West (that's a hell of a lot smaller) has five stations. While I'll agree that running Skytrain down King George is overkill, running it down Fraser Hwy is not. Even then Surrey would only have a single line vs the three that Vancouver has.
     
     
  #4959  
Old Posted Mar 30, 2018, 2:40 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
wooooooooweeeeeee i love being on an infinite loop.

in other news, anyone have anything new to add? so far the past 200 pages have been a repeat of the same argument over the years. we could delete 50% of this thread and still have multiple copies of this argument.
     
     
  #4960  
Old Posted Mar 30, 2018, 5:06 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,174
Quote:
Originally Posted by VancouverOfTheFuture View Post
wooooooooweeeeeee i love being on an infinite loop.

in other news, anyone have anything new to add? so far the past 200 pages have been a repeat of the same argument over the years. we could delete 50% of this thread and still have multiple copies of this argument.
Or you could surrender.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:24 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.