Old Posted Mar 23, 2018, 8:54 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
March 18, 2018 from the Ottawa photos thread
Quote:
Originally Posted by TMA-1 View Post
Through the window on a bumpy day. Always a pleasure.




D820202 Claridge Icon
by Chuck Clark, on Flickr
Reply With Quote
     
     
  #1122  
Old Posted Mar 23, 2018, 10:35 PM
BlueJay's Avatar
BlueJay BlueJay is offline
Bulid Up, Not Out
 
Join Date: Aug 2009
Location: Ottawa
Posts: 393
Quote:
Originally Posted by McC View Post
No, it's the (by)law. Supposed to be 7AM on weekdays and 9 AM on weekends, unless they've been granted an exemption.
https://ottawa.ca/en/noise-law-no2017-255#construction-sites-or-machinery

It's not NIMBYism to expect people to play by the rules.
I wouldn't assume they didn't play by the rules unless you know more than I do.

Those hours matter only if it exceeds over 50 DB at point of origin. You are allowed to work 24/7 in Ottawa. That webpage is nimbyism. It's obvious they were not jackhammering at 7am on a Saturday and this moron that created this page is just simply a person that loves to complain and get attention which to me is "Nimbyism at it's finest"
Reply With Quote
     
     
  #1123  
Old Posted Mar 24, 2018, 12:16 AM
Hamada Hamada is offline
Registered User
 
Join Date: Sep 2016
Posts: 46
Will the work be halted for a while after a worker was injured and taken to hospital?? Because I heard the ministry of labour will investigate the incident.
Reply With Quote
     
     
  #1124  
Old Posted Mar 24, 2018, 2:58 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,871
Quote:
Originally Posted by BlueJay View Post
I wouldn't assume they didn't play by the rules unless you know more than I do.

Those hours matter only if it exceeds over 50 DB at point of origin. You are allowed to work 24/7 in Ottawa. That webpage is nimbyism. It's obvious they were not jackhammering at 7am on a Saturday and this moron that created this page is just simply a person that loves to complain and get attention which to me is "Nimbyism at it's finest"
What possible construction activity would be under 50 db? A normal conversation is 60.
Reply With Quote
     
     
  #1125  
Old Posted Mar 24, 2018, 10:01 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by BlueJay View Post
I wouldn't assume they didn't play by the rules unless you know more than I do.

Those hours matter only if it exceeds over 50 DB at point of origin. You are allowed to work 24/7 in Ottawa. That webpage is nimbyism. It's obvious they were not jackhammering at 7am on a Saturday and this moron that created this page is just simply a person that loves to complain and get attention which to me is "Nimbyism at it's finest"
I don't know how you can say "I wouldn't assume..." and then say "It's Obvious..." in the same post. You then make an assumption that the person is a "moron" who "loves to complain". The truth probably lies somewhere between the story each side presents.
Reply With Quote
     
     
  #1126  
Old Posted Mar 25, 2018, 12:03 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,655
Worker injured at Claridge construction site where man died two years ago

Paula McCooey, Ottawa Citizen
Published on: March 23, 2018 | Last Updated: March 23, 2018 7:42 PM EDT




A construction worker was injured at a Claridge construction site Friday afternoon, the same site where a worker died two years ago.

The Ottawa Paramedic Service was called to the Icon condo building at the corner of Preston Street and Carling Avenue just after 2:30 p.m. A spokesperson said the man had been working on the seventh floor and was discovered injured on the fifth floor. He was transported to the hospital for treatment.

On March 23, 2016, 25-year-old surveyor Olivier Bruneau was struck and killed by a falling slab of ice at the same site. Also, a Ministry of Labour inspector had visited the site six weeks before the fatal incident after another worker was struck by falling ice in February 2016. That worker was not reported injured.

Following Bruneau’s death, the ministry laid multiple charges against Claridge Homes, builder of the project, and against its employer, Gatineau subcontractor Bellai Brothers Construction Ltd. under the Occupational Heath and Safety Act.

While police attended the scene Friday afternoon, it is the Ministry of Labour that is investigating the incident.



http://ottawacitizen.com/news/local-news...uction-site-where-man-died-two-years-ago
Reply With Quote
     
     
  #1127  
Old Posted Mar 25, 2018, 11:37 AM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
I would be calling in sick for work on March 23, 2019..
Reply With Quote
     
     
  #1128  
Old Posted Mar 25, 2018, 12:59 PM
Flemay Flemay is offline
Registered User
 
Join Date: Sep 2017
Posts: 127
Quote:
Originally Posted by harls View Post
I would be calling in sick for work on March 23, 2019..
THANK god it's going to be a Saturday
Reply With Quote
     
     
  #1129  
Old Posted Mar 26, 2018, 2:39 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,895
Quote:
Originally Posted by Flemay View Post
THANK god it's going to be a Saturday
Go up a page, they are working on Saturdays starting at 7am
Reply With Quote
     
     
  #1130  
Old Posted Mar 26, 2018, 5:27 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,858
Site has been shutdown...again....



http://www.cbc.ca/news/canada/ottawa/orders-injury-claridge-construction-site-1.4593269
Quote:
Claridge construction site shut down after worker falls
Ministry of Labour issues stop work order at Preston Street site following incident Friday
CBC News · Posted: Mar 26, 2018 1:01 PM ET | Last Updated: 22 minutes ago

Police responded to reports of a workplace injury at the Claridge Icon construction site on Preston Street on March 23, 2018. (Marc-André Cossette/CBC)
The Ministry of Labour ordered work to stop Friday after a man fell three metres from a concrete forming panel at a Claridge construction site on Preston Street — the same site where a worker died two years ago.

In a news release Monday, the ministry said it issued the order against the injured worker's employer, Bellai Brothers Construction Ltd, after he was rushed to hospital with a head injury. He's since been released, police said Saturday.

Ministry of Labour investigating workplace injury at Claridge construction site
A ministry inspector and engineer visited the site following the incident.

Bellai Brothers has complied with an order to ensure construction materials are stacked to prevent tipping, but the stop work order will remain in place until the man's employer installs a fall protection system at the site near Preston Street and Carling Avenue, where the Claridge Icon condominium is currently under construction.

The worker fell when a forming panel tipped, the ministry said. The ministry also demanded documentation from Claridge Homes.

Worker died 2 years ago
Olivier Bruneau, a 24-year-old surveyor, was killed at the same site on March 23, 2016, when he was struck by falling ice while working at the bottom of a 30-metre-deep construction pit.

Ministry of Labour lays charges in construction death of Olivier Bruneau
Family heartbroken construction death trial set for 2019
In that case, the ministry charged developers and supervisors working on the project with a total of eight offences under the Health and Safety Act.

Their trial is scheduled to take place next year.

The Ministry of Labour is continuing to investigate Friday's incident.
Reply With Quote
     
     
  #1131  
Old Posted Mar 26, 2018, 6:05 PM
BlueJay's Avatar
BlueJay BlueJay is offline
Bulid Up, Not Out
 
Join Date: Aug 2009
Location: Ottawa
Posts: 393
[QUOTE=acottawa;8131219]What possible construction activity would be under 50 db? A normal conversation is 60.[/QUOTE

50 db at origin of complaint. My apologies if I made it sound that 50 db at origin of activity of the work taking place.
Reply With Quote
     
     
  #1132  
Old Posted Mar 26, 2018, 6:08 PM
BlueJay's Avatar
BlueJay BlueJay is offline
Bulid Up, Not Out
 
Join Date: Aug 2009
Location: Ottawa
Posts: 393
Quote:
Originally Posted by Catenary View Post
I don't know how you can say "I wouldn't assume..." and then say "It's Obvious..." in the same post. You then make an assumption that the person is a "moron" who "loves to complain". The truth probably lies somewhere between the story each side presents.
I was saying I wouldn't assume to the original poster who was the one that "assumed" so yea, I believe that I am okay to say "assume" and " it's obvious" in the same post unless that violates the SSP rules?
Reply With Quote
     
     
  #1133  
Old Posted Mar 26, 2018, 6:26 PM
BlueJay's Avatar
BlueJay BlueJay is offline
Bulid Up, Not Out
 
Join Date: Aug 2009
Location: Ottawa
Posts: 393
[QUOTE=c_speed3108;8133232]Site has been shutdown...again....



As it should be. Unavoidable incidents like this latest one should have been preventable if the Construction management team took safety seriously considering the death of Olivier Bruneau on this site. As much as I want to see this project rise, worker safety must be first and foremost which doesn't seem to be the case on this project at all.
Reply With Quote
     
     
  #1134  
Old Posted Mar 26, 2018, 6:35 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,871
[QUOTE=BlueJay;8133303]
Quote:
Originally Posted by acottawa View Post
What possible construction activity would be under 50 db? A normal conversation is 60.[/QUOTE

50 db at origin of complaint. My apologies if I made it sound that 50 db at origin of activity of the work taking place.
Thanks for clarifying.

Still, a single 95 DB power tool at 50 metres (which is farther than the closest houses) would still be over 50 db (at least according to this calculator http://hyperphysics.phy-astr.gsu.edu/hbase/Acoustic/isprob2.html). Until the building is enclosed it would be hard to do much.
Reply With Quote
     
     
  #1135  
Old Posted Mar 27, 2018, 2:24 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,003
Taking bets here. Who has Trinity at Bayview taking over the tallest moniker before (and in permanency) Icon.
Reply With Quote
     
     
  #1136  
Old Posted Mar 28, 2018, 1:18 PM
ars ars is offline
Registered User
 
Join Date: Feb 2013
Location: Ottawa
Posts: 473
Quote:
Originally Posted by J.OT13 View Post
Taking bets here. Who has Trinity at Bayview taking over the tallest moniker before (and in permanency) Icon.
Have sales started for the Trinity project?

I checked the project's website and don't see anything there.
Reply With Quote
     
     
  #1137  
Old Posted Mar 28, 2018, 2:22 PM
cr872190 cr872190 is offline
Registered User
 
Join Date: Aug 2013
Posts: 413
Quote:
Originally Posted by ars View Post
Have sales started for the Trinity project?

I checked the project's website and don't see anything there.
Commercial/retail sales have begun but the residential component is rental so there will be no details till a few months out from completion.
Reply With Quote
     
     
  #1138  
Old Posted Mar 29, 2018, 2:14 PM
Hamada Hamada is offline
Registered User
 
Join Date: Sep 2016
Posts: 46
I think stop order work has been lifted, because I passed by carling avenue and construction is active after latest work injury but not written in the news that work order has been lifted.

Last edited by Hamada; Mar 29, 2018 at 2:17 PM. Reason: additional info
Reply With Quote
     
     
  #1139  
Old Posted Mar 29, 2018, 3:53 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,003
Quote:
Originally Posted by Hamada View Post
I think stop order work has been lifted, because I passed by carling avenue and construction is active after latest work injury but not written in the news that work order has been lifted.
Or it's Claridge being Clardige and not giving a shit.
Reply With Quote
     
     
  #1140  
Old Posted Mar 29, 2018, 7:51 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 763
Quote:
Originally Posted by J.OT13 View Post
Or it's Claridge being Clardige and not giving a shit.
I'm no expert, and not in real estate or development, but wouldn't claridge be hiring a construction firm to manage the project? Wouldn't they not be directly involved in the actual construction?

I could be way off base here, just asking the question. My understanding would be they'd outsource the actual project work to be performed to their specifications with a standard contract.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 11:26 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.