Quote:
Originally Posted by austlar1
Yes, probably at least a decade. We are talking about:
4,709 apartment units
600 hotel rooms
3,987,300 square feet of office space
436,250 square feet of general retail space
60,000 square feet of medical/dental space
Hard to imagine a single lender or developer taking all that on at one time. There will eventually be a master plan or road map, if this thing progresses. Multiple developers will probably share in the building of this thing.
|
Again, it's smaller than the Domain, which is almost built out at this point (~10 years), and was (after a short while) basically just Endeavor.
It's a nice development, but you're acting like this is some new unprecedented thing.
It's also much smaller than Mueller, and I believe that's been all Catellus so far.
*And that's _if_ they get the max zoning they're asking for (no sure thing) and build out to the max of the traffic analysis they're doing (also not guaranteed).