HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #8521  
Old Posted Jan 12, 2018, 10:05 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:19 AM.
     
     
  #8522  
Old Posted Jan 12, 2018, 10:37 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,708
Quote:
Originally Posted by Migrant_Coconut View Post
Again, the telecomms utilities are all on 10th - couldn't put them on Broadway at the time, because of the streetcar - and relocating them is a significant increase in capital cost. Same reason (among others) that LRT down 16th is unworkable.
Not to mention Vancouver General Hospital on 10th, and its emergency room entrance is on 10th. I highly doubt anybody would allow 10th to be torn up and made unaccessible to ambulances to allow a subway through.
     
     
  #8523  
Old Posted Jan 12, 2018, 11:15 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,522
Access was maintained over the Cambie trench using Bailey bridges and excavating in sequence
(so an adjacent area was maintained for access while the bridge was installed).
The same could be done at VGH.
     
     
  #8524  
Old Posted Jan 12, 2018, 11:19 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
I wonder if VGH would ever consider a relocation/renovation of their emergency entrance. It's always seemed like a weird area of the campus to me. Usually the ED is front and centre, just off the main entrance (think Surrey Memorial).
     
     
  #8525  
Old Posted Jan 13, 2018, 2:19 AM
retro_orange retro_orange is offline
retro_orange
 
Join Date: Sep 2014
Location: East Van
Posts: 2,029
Quote:
Originally Posted by WarrenC12 View Post
I wonder if VGH would ever consider a relocation/renovation of their emergency entrance. It's always seemed like a weird area of the campus to me. Usually the ED is front and centre, just off the main entrance (think Surrey Memorial).
Yeah there's always tons of slow traffic, pedestrians and bicyclists on 10th getting in the way of emergency vehicles. On that note I have had to go to emergency at VGH twice in a taxi because no ambulances were available. People get out of the way for an ambulance but if a taxi is speeding to emergency people don't give a fuck as they think it's just another speeding taxi going where-ever. The Emergency entrance should be on Broadway or 12th in a new building.
     
     
  #8526  
Old Posted Jan 14, 2018, 8:10 AM
casper's Avatar
casper casper is offline
Registered User
 
Join Date: Nov 2011
Location: Victoria
Posts: 12,701
Quote:
Originally Posted by WarrenC12 View Post
I wonder if VGH would ever consider a relocation/renovation of their emergency entrance. It's always seemed like a weird area of the campus to me. Usually the ED is front and centre, just off the main entrance (think Surrey Memorial).
I think you are asking a lot. There is a bunch of complex workflow, building layouts and related departments that they to keep close to the emergency room. I don't think it is all that easy to move.
     
     
  #8527  
Old Posted Feb 12, 2018, 1:30 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
was in the area of 10th/laurel last week, and the sidewalks on 10th are a mess for 'roadway imorovements' -- giving a preview of what it will be like when broadway is dug up for the subway stations.
     
     
  #8528  
Old Posted Feb 12, 2018, 2:43 AM
Colin4567 Colin4567 is offline
Registered User
 
Join Date: Oct 2017
Location: Lower Mainland-ish
Posts: 234
Quote:
Originally Posted by jsbertram View Post
was in the area of 10th/laurel last week, and the sidewalks on 10th are a mess for 'roadway imorovements' -- giving a preview of what it will be like when broadway is dug up for the subway stations.
Just remember this will be the worst part of it. The final leg to UBC won't be nearly as bad.
     
     
  #8529  
Old Posted Feb 14, 2018, 12:33 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,522
One of the reasons that Cambie was bad (and it wasn't all that bad) traffic-wise - was because the bridge funnelled into it.

For east-west travel there are several different alternate routes people can take.

If necessary, the City - if so willing - can prohibit parking on 12th Ave and 6th Ave during those construction years.
     
     
  #8530  
Old Posted Feb 14, 2018, 3:50 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:19 AM.
     
     
  #8531  
Old Posted Feb 14, 2018, 4:33 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by officedweller View Post
One of the reasons that Cambie was bad (and it wasn't all that bad) traffic-wise - was because the bridge funnelled into it.

For east-west travel there are several different alternate routes people can take.

If necessary, the City - if so willing - can prohibit parking on 12th Ave and 6th Ave during those construction years.
That is a good point. Oak is 900m west of Cambie and Main is 1km east.

On the other hand Broadway has:

- 6th Ave 300m north
- 4th Ave 450m north
- 12th Ave 300m south
- 16th Ave 700m south
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
     
     
  #8532  
Old Posted Mar 12, 2018, 6:46 AM
Feathered Friend Feathered Friend is offline
Registered User
 
Join Date: Jun 2016
Posts: 2,513
Overwhelming Public Support and Political Hopefuls Seen at Millennium Expansion Event













Quote:
What better way to spend a sunny Saturday afternoon than learning about Vancouver’s plan to respond, implement, and guide the future Millennium Line expansion to Arubutus. Admittedly, there are plenty of better things to do, but Hannah and I still made our way down to the former Lulu Lemon Labs at Cambie and Broadway. While the project has been waiting for funding, the city has repeatedly consulted with the public, business groups, and other stakeholders. The result of this is that the guidelines not only respond to previously raised issues, but received clear public support.There is a clear demand from the public for this Skytrain expansion. Even though most of the material is still very high level, over 200 people attended this event. A lot of the principles focus around obvious matters, like support for businesses and minimizing impacts on all modes of commute. Others show that the City has heard the public’s cries
Will Cambie get it's second entrance? It seems likely, read here to learn that and the name of one of the two political parties that had a representative attend the event.
https://cityduo.wordpress.com/2018/03/11...llennium-expansion-draft-policies-event/
     
     
  #8533  
Old Posted Mar 12, 2018, 7:16 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,047
So long as both stations have an underground connection, all should be well.

Regarding the comments, everybody wanting a line built straight to UBC with all those features immediately - especially given the funding situation - must be a little bit frustrating for TransLink right now.
     
     
  #8534  
Old Posted Mar 12, 2018, 4:11 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by Migrant_Coconut View Post
So long as both stations have an underground connection, all should be well.

Regarding the comments, everybody wanting a line built straight to UBC with all those features immediately - especially given the funding situation - must be a little bit frustrating for TransLink right now.
I think TransLink wants that too. The frustrating thing for them is that it doesn't seem to be a priority for governments.
     
     
  #8535  
Old Posted Mar 12, 2018, 4:24 PM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by GlassCity View Post
I think TransLink wants that too. The frustrating thing for them is that it doesn't seem to be a priority for governments.
And they’re forced to promote the Surrey LRT more than the Broadway Extension.
     
     
  #8536  
Old Posted Mar 12, 2018, 5:03 PM
svlt svlt is offline
Registered User
 
Join Date: Apr 2014
Location: Canada
Posts: 1,021
Quote:
Originally Posted by Migrant_Coconut View Post
So long as both stations have an underground connection, all should be well.

Regarding the comments, everybody wanting a line built straight to UBC with all those features immediately - especially given the funding situation - must be a little bit frustrating for TransLink right now.
Great to see the turnout and public support at that event.

I just hope with how long it took to get a line just out to Arbutus running that it won't be decade(s) before we see it completed to UBC. At least that's a stated end goal for them.
     
     
  #8537  
Old Posted Mar 12, 2018, 7:26 PM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Quote:
Originally Posted by Feathered Friend View Post

(Images Removed)

Will Cambie get it's second entrance? It seems likely, read here to learn that and the name of one of the two political parties that had a representative attend the event.
Enough with the studies and surveys and meetings and open houses. We already know all this. Just start construction for god's sakes.

Last edited by deasine; Mar 13, 2018 at 1:09 AM.
     
     
  #8538  
Old Posted Mar 12, 2018, 7:42 PM
VarBreStr18 VarBreStr18 is offline
Registered User
 
Join Date: Nov 2014
Posts: 750
Flipper316, this is their job requirement. Bet you they need to do this a few more times to capture wider audience even if no new info. This is written into their job specification.
     
     
  #8539  
Old Posted Mar 12, 2018, 7:58 PM
cganuelas1995 cganuelas1995 is online now
Registered User
 
Join Date: Jan 2017
Posts: 1,639
Quote:
Originally Posted by svlt View Post
Great to see the turnout and public support at that event.

I just hope with how long it took to get a line just out to Arbutus running that it won't be decade(s) before we see it completed to UBC. At least that's a stated end goal for them.
Could they at least rough in the entire tunnel structure first while doing the excavations for first phase of stations?
     
     
  #8540  
Old Posted Mar 12, 2018, 8:52 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by VarBreStr18 View Post
Flipper316, this is their job requirement. Bet you they need to do this a few more times to capture wider audience even if no new info. This is written into their job specification.
Can we not just get rid of them and use the saved money for a longer extension?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:59 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.