Quote:
Originally Posted by Novacek
Thanks
That really surprises me though, that with non-double tracked and limited sidings, and slow freight trains (that would take over an hour to travel through the corridor) that they'd run at the same time in the passenger corridor.
Or maybe they mean this is necessary but not sufficient, that they still need full double tracking to do that (in the future).
Or "at the same time" means passenger service in the passenger corridor, and freight at the same time west of Leander and on the green line.
|
Yea it's surprising. It would require a very dependable and timed system so you don't have trains parked at stations waiting for the freight to pass them.
in terms of a complete double track, do you think they can just lay down a 2nd track next to the current one? The track seems centered in a relatively narrow ROW for a lot of the route. I wonder if they'll have to build 2 new tracks along the edges of the ROW.