HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 7, 2018, 9:38 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,383
Quote:
Originally Posted by Novacek View Post
Thanks

That really surprises me though, that with non-double tracked and limited sidings, and slow freight trains (that would take over an hour to travel through the corridor) that they'd run at the same time in the passenger corridor.

Or maybe they mean this is necessary but not sufficient, that they still need full double tracking to do that (in the future).

Or "at the same time" means passenger service in the passenger corridor, and freight at the same time west of Leander and on the green line.
Yea it's surprising. It would require a very dependable and timed system so you don't have trains parked at stations waiting for the freight to pass them.

in terms of a complete double track, do you think they can just lay down a 2nd track next to the current one? The track seems centered in a relatively narrow ROW for a lot of the route. I wonder if they'll have to build 2 new tracks along the edges of the ROW.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 9:10 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.