Old Posted Mar 2, 2018, 4:13 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OtrainUser View Post
Trillium line does get full sometimes and i never see cyclists try to board the train then, they always wait for the next one and i do see that happening with confederation line. No cyclist would be dumb enough to bring their bike onto a full train. It hasn't happened with Trillium and it won't happen with Confederation line.
Probably not as big an issue initially, but will grow after stage 2 (even on the Trillium Line), what if a cyclist is already onboard when the train fills up? Not only is it occupying 3 seats, but it could be difficult to maneuver the bike through the crowds to the doors.
     
     
  #6402  
Old Posted Mar 2, 2018, 4:59 PM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,117
Quote:
Originally Posted by roger1818 View Post
Probably not as big an issue initially, but will grow after stage 2 (even on the Trillium Line), what if a cyclist is already onboard when the train fills up? Not only is it occupying 3 seats, but it could be difficult to maneuver the bike through the crowds to the doors.
The designated area is right next to the door.

     
     
  #6403  
Old Posted Mar 2, 2018, 5:55 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,687
Quote:
Originally Posted by OCCheetos View Post
The designated area is right next to the door.

I sure hope that wheelchair users have priority over cyclists to this designated area.
     
     
  #6404  
Old Posted Mar 2, 2018, 5:56 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by roger1818 View Post
Probably not as big an issue initially, but will grow after stage 2 (even on the Trillium Line), what if a cyclist is already onboard when the train fills up? Not only is it occupying 3 seats, but it could be difficult to maneuver the bike through the crowds to the doors.
Montreal now allows bikes on the metro during rush hour.
     
     
  #6405  
Old Posted Mar 2, 2018, 6:28 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
The designated area is right next to the door.

True, but there is a pillar in the way. I still say it would be awkward if the train is full, especially when the platform is on the opposite side.
     
     
  #6406  
Old Posted Mar 2, 2018, 6:31 PM
ars ars is offline
Registered User
 
Join Date: Feb 2013
Location: Ottawa
Posts: 473
Quote:
Originally Posted by rocketphish View Post
I sure hope that wheelchair users have priority over cyclists to this designated area.
From what I've read, it does seem like wheelchairs and strollers have priority over bikes, but I don't know what would happen in the scenario that a cyclist gets on a full train and then a passenger in a wheelchair wants to get on in the next stop.
     
     
  #6407  
Old Posted Mar 2, 2018, 6:48 PM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,117
Quote:
Originally Posted by roger1818 View Post
True, but there is a pillar in the way. I still say it would be awkward if the train is full, especially when the platform is on the opposite side.
It'd be awkward for anyone using that designated area. It wouldn't be a problem exclusive to bikes, and it isn't exclusive to the trains. The same thing happens on buses too.
     
     
  #6408  
Old Posted Mar 2, 2018, 7:03 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by ars View Post
From what I've read, it does seem like wheelchairs and strollers have priority over bikes, but I don't know what would happen in the scenario that a cyclist gets on a full train and then a passenger in a wheelchair wants to get on in the next stop.
Good Day...

well, we have had fights over competing wheelchairs demanding service, holding the bus up,
and competing strollers, and competing strollers .vs. wheelchairs, ....so....

'fraid I can and probably will see fights over bikes .vs. all of the above.

Same ol' proviso - most are good, but a few ruin it for all !!!!
Very tiring, fighting the same ol' fights !
     
     
  #6409  
Old Posted Mar 2, 2018, 8:05 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,697
I don't see Rack and Roll on the buses being used to capacity at rush hour, I suspect similar usage, maybe just slightly better with the LRT. People will still have to ride to the station and there's a catchment factor, and once most cyclists are out the door and dressed for the weather they would just prefer a continuous journey. Rain or strong winds on the way home might change things a bit for some people, though.

The Confederation line will have 10+K pphpd capacity, but is current peak demand really going to top out more than 5 to 6K? Total transit a.m. rush into the core is roughly 36K from all directions and automatically discounting 20% from Gatineau, that's less than 30K spread out over 3.5 hours shared between the LRT and all incoming buses. I guess it remains to be seen later this year.
     
     
  #6410  
Old Posted Mar 2, 2018, 8:52 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
If we are having conflicts between bikes, strollers and wheelchairs on crowded trains, it is time to be investing in more trains.

Hopefully, a cyclist will have the sense of positioning himself or herself near a door.

The problem comes when they actually block access to a door. I see this on buses all the time with passengers standing right in front of the back door with no intention to exit at the next stop.
     
     
  #6411  
Old Posted Mar 2, 2018, 9:09 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,858
This is no different than the issues they have had with the design of some streets in the city. (cars, parking, bikes, transit, pedestrians). There are a number of places in the city where there is room for a number of the above but definitely not all..or at least not all well. Rank those in order and the street design will easily follow.

Council is completely unwilling to set any sort of priority as it entails telling someone else (a voter) that they are a lower priority/less important.

The stroller vs wheelchair debate on buses a few years back was a classic example of this. Council final decision was not to make one. They deferred to the bus operators...which isn't a terrible policy however you have to actually be willing to back the bus operators, whatever decision they make....even the bad ones that make you cringe. Don't like that...set a policy...set a priority...set a peaking order and then the answer will follow.
     
     
  #6412  
Old Posted Mar 5, 2018, 4:27 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day.

A 6 second video twitter post from City of Ottawa on coupling two LRVs together.

https://twitter.com/twitter/statuses/969326469108334593

It might be faster and easier than I had previously thought,
but I still do not know how the couplers are stored under the nose,
nor how fast and easy it is to remove or replace the nose shroud.

We shall see.
     
     
  #6413  
Old Posted Mar 5, 2018, 2:32 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by PHrenetic View Post
Good Day.

A 6 second video twitter post from City of Ottawa on coupling two LRVs together.

https://twitter.com/twitter/statuses/969326469108334593

It might be faster and easier than I had previously thought,
but I still do not know how the couplers are stored under the nose,
nor how fast and easy it is to remove or replace the nose shroud.

We shall see.
Now let's see the uncoupling operation.
     
     
  #6414  
Old Posted Mar 5, 2018, 3:12 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by PHrenetic View Post
It might be faster and easier than I had previously thought,
but I still do not know how the couplers are stored under the nose,
nor how fast and easy it is to remove or replace the nose shroud.
Interesting to note that the headlights on both trains turn off simultaneously after they have been coupled.

Not specific to the Citadis Spirit, but Alstom has a page about how trains are coupled.

http://3minutesstop.alstom.com/infographie/how-does-coupling-between-two-trains-work/

Quote:
Today, coupling or uncoupling is no longer carried out manually: it is directly controlled by the driver, using the control panel in the driver’s cab.
During coupling, one train approaches another at low speed to limit the effect of the “jolt”. They are then linked together by an automatic coupler, consisting of: mechanical systems to ensure the connection between the two trains, pneumatic ducts to guarantee continuity between the two trains, and finally, electrical connector heads to allow both trains to be controlled from a single cabin. To optimise aerodynamics, coupling systems are sometimes hidden away behind hatches.
     
     
  #6415  
Old Posted Mar 5, 2018, 6:03 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,687
I watched a small shunt (tug? mule?) pulling an LRV train though the Belfast LMSF yard on Friday evening. I assume that it was remotely operated. Kinda neat.
     
     
  #6416  
Old Posted Mar 6, 2018, 3:38 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Not LRT, but south Florida's new HSR service, Brightline, have bike racks on each train. There is speculation that VIA Rail could be buying these same trainsets.

     
     
  #6417  
Old Posted Mar 6, 2018, 4:18 PM
OtrainUser OtrainUser is offline
Registered User
 
Join Date: Jul 2017
Posts: 619
Quote:
Originally Posted by roger1818 View Post
Not LRT, but south Florida's new HSR service, Brightline, have bike racks on each train. There is speculation that VIA Rail could be buying these same trainsets.


That is something the City of Ottawa should have got if they were smart enough. At least this way there is no conflict between passengers.
     
     
  #6418  
Old Posted Mar 6, 2018, 4:26 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by OtrainUser View Post
That is something the City of Ottawa should have got if they were smart enough. At least this way there is no conflict between passengers.
That seems like something that would work on a genteel, intercity train where there are no standing passengers and seats are reserved. That doesn't seem like a solution for a packed urban train with lots of standing passengers.
     
     
  #6419  
Old Posted Mar 6, 2018, 5:37 PM
Radster Radster is offline
Registered User
 
Join Date: Oct 2007
Location: Chelsea
Posts: 997
Quote:
Originally Posted by acottawa View Post
That seems like something that would work on a genteel, intercity train where there are no standing passengers and seats are reserved. That doesn't seem like a solution for a packed urban train with lots of standing passengers.
This works in LRT, as long as the hooks are right by the door, like shown a few pages back in Portland, Oregon. And I have seen this work first hand, even used the hooks for my bike in rush hour afternoon commute last summer, no issues at all, and it was crowded, and I was with my gf and my 9 month baby and a second bike with baby seat.
     
     
  #6420  
Old Posted Mar 6, 2018, 11:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Dates back nearly a year, but interesting angles;











More on the website;

http://www.frontpagemediagroup.ca/?portfolio=ottawa-confederation-line
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 1:37 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.