HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #6361  
Old Posted Feb 26, 2018, 8:12 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OTSkyline View Post
What was the point of naming trains anyways? Will the name actually be listed on the it or plastered on the side of it?
My guess is it is a throwback to the old days. Not so common here in North America (though the CPR did name the Château, Manor and Park cars used on The Canadian) but in England most (if not all) steam engines had a names (Mallard, Flying Scotsaman, etc).
     
     
  #6362  
Old Posted Feb 26, 2018, 8:18 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,014
Sort of strange that they named individual cars instead of trains. Oh well. Publicity never hurts. And this probably costs close to nothing as they can get for PR.
     
     
  #6363  
Old Posted Feb 26, 2018, 8:26 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,014
Quote:
Originally Posted by kmcamp View Post
You're advocating for the status quo, instead of the way things could be. By North American standards we're even too small for the system we're getting. Right now only very large 4 million+ cities get fully segregated metros (Vancouver is also below the typical size). I'm not saying it'll change overnight, but we shouldn't reject it out of hand just because "it's not the way it's done here"

I've been through this discussion on here before. Ottawa lucked out by getting $5 billion in transit investment between Stage 1 and Stage 2. Ottawa is shouldering maybe 40% of that. Sure, there's a lot of things that could happen. And it's nice to dream I suppose, but the province and the feds are practically done investing in major Ottawa transit infrastructure for at least a decade after Stage 2. They have made some very atypical investments in Ottawa for its size. And they'll have to move on to other regions and other priorities.

Best case scenario is some Stage 3 LRT extensions and BRT on critical corridors like Baseline, Carling and (hopefully) Montreal. And having all of that before 2030, would be a massive (and highly improbable) accomplishment. Another line through the core is pure fantasy. And we don't do ourselves favours by not recognizing that.
     
     
  #6364  
Old Posted Feb 26, 2018, 8:38 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,072
Quote:
Originally Posted by Truenorth00 View Post
Sort of strange that they named individual cars instead of trains. Oh well. Publicity never hurts. And this probably costs close to nothing as they can get for PR.
How permanent is a "train"?
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #6365  
Old Posted Feb 26, 2018, 8:40 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,072
Quote:
Originally Posted by Truenorth00 View Post
Best case scenario is some Stage 3 LRT extensions and BRT on critical corridors like Baseline, Carling and (hopefully) Montreal.
The 2030 plan for Montreal Road has already been thrown out, shredded, scrapped, deep-sixed, kiboshed, in favour of limited hours of bus-only lanes, in one direction only, and bike lanes.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #6366  
Old Posted Feb 26, 2018, 9:32 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by Uhuniau View Post
How permanent is a "train"?
Good Day, all who question what a 'train' is.

The term has been bandied about and severely mis-used in too many connotations, which is where I proffer the RailRoad format I have been using:

Phase 1 has 34 Light Rail Vehicles (LRVs).
Phase 2 has 38 LRVs.
Each of the 72 LRVs are composed of 4 (expandable to 5) cars.

These are 1-vehicle consists, or 'trains', which are commonly referred to as 'trains'.

Each LRV can be coupled to another to make up a 2-vehicle consist, which is also sometimes referred to as a 'train'.
This gives Phase 1 17 2-vehicle consists; Phase 2 adds 19 2-vehicle consists. Total = 36 2-vehicle consists.

Bottom Line - we will unlikely to be operating 1-vehicle consists, so most will be 2-vehicle consists.
And these are what will end up being referred to when we 'just missed the train' .

For the PR naming exercise, they used 'train' to refer to each 4 car LRV.

And BTW, they named 40 names - the other 6 are for the T-Line units.

Overall - pure PR. No reality, No meaning, No useage, No S###.
A good way to divert from 6 more months of pain.

Use what you will.

Last edited by PHrenetic; Feb 27, 2018 at 12:47 AM. Reason: corrections.
     
     
  #6367  
Old Posted Feb 27, 2018, 12:40 AM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,014
Quote:
Originally Posted by Uhuniau View Post
How permanent is a "train"?
I get your point, but I don't see it as a challenge. Name half the end cars. And you have names for trains.
     
     
  #6368  
Old Posted Feb 27, 2018, 12:49 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
When I think of the future phases of the LRT, I think to Boston's Green line.

They have 5 branches with a single downtown tunnel. It works there, it can work here.
     
     
  #6369  
Old Posted Feb 27, 2018, 3:51 AM
GeoNerd GeoNerd is offline
Registered User
 
Join Date: May 2010
Location: Ottawa, ON.
Posts: 552
     
     
  #6370  
Old Posted Feb 27, 2018, 3:02 PM
Norman Bates Norman Bates is offline
Living With My Mother
 
Join Date: Feb 2009
Posts: 1,027
Quote:
Originally Posted by GeoNerd View Post
That’s pretty good. Though I think the Hazeldean / Robertson / Richmond / Baseline / Herron / Walkley / Innes corridor is a natural one that has never yet been explored for untapped ridership.
     
     
  #6371  
Old Posted Feb 27, 2018, 3:47 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by GeoNerd View Post
Doesn't this belong in the Dream Transit Plan thread?
     
     
  #6372  
Old Posted Feb 27, 2018, 4:47 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by Norman Bates View Post
That’s pretty good. Though I think the Hazeldean / Robertson / Richmond / Baseline / Herron / Walkley / Innes corridor is a natural one that has never yet been explored for untapped ridership.
To me, the natural desire lines on Bank Street are more north-south than east-west. If we were ever to get to that stage where a Bank Street subway was feasible, I would use it to run service to Billings Bridge and then branch to Baseline, the airport and the southern suburbs. Interlining only the Trillium Line, which is least able to handle it does not make sense. Furthermore, directing airport trains to downtown Hull seems to have minimal benefit to airport passengers.
     
     
  #6373  
Old Posted Feb 27, 2018, 5:18 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,014
Quote:
Originally Posted by swimmer_spe View Post
When I think of the future phases of the LRT, I think to Boston's Green line.

They have 5 branches with a single downtown tunnel. It works there, it can work here.
We'll end up with branched service, when you consider the Barrhaven and Kanata branches.

I'm not sure how any other lines would fit into this framework though. At most, if we ended up with a tunnel on Rideau/Montreal, that could feed into the DOTT. But that's a stretch obviously. All the rest are standalone BRTs: Carling, Baseline, Innes.
     
     
  #6374  
Old Posted Feb 27, 2018, 6:02 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by Truenorth00 View Post
We'll end up with branched service, when you consider the Barrhaven and Kanata branches.

I'm not sure how any other lines would fit into this framework though. At most, if we ended up with a tunnel on Rideau/Montreal, that could feed into the DOTT. But that's a stretch obviously. All the rest are standalone BRTs: Carling, Baseline, Innes.
There should be a matching branch on the east side as well.
     
     
  #6375  
Old Posted Feb 27, 2018, 6:08 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,072
Quote:
Originally Posted by lrt's friend View Post
There should be a matching branch on the east side as well.
The city of Ottawa, invest on its east side?

That's crazy talk. Public expenditures, especially the big-ticket ones, are reserved for the half of the city west of the Rideau River.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #6376  
Old Posted Feb 27, 2018, 6:10 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by lrt's friend View Post
There should be a matching branch on the east side as well.
Good Day.

Which is where the Blair split-off southeastward thru the southside of Blackburn Hamlet out to Frank Kenny Rd. proposed transitway has been bandied as a direct-to-LRT, like the Riverside South proposal, and the western Kanata / Stittsville expansion.

We shall see ??
     
     
  #6377  
Old Posted Feb 27, 2018, 6:16 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by Uhuniau View Post
That's crazy talk. Public expenditures, especially the big-ticket ones, are reserved for the half of the city west of the Rideau River.
*Or Orleans
     
     
  #6378  
Old Posted Feb 27, 2018, 6:37 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by Uhuniau View Post
The city of Ottawa, invest on its east side?

That's crazy talk. Public expenditures, especially the big-ticket ones, are reserved for the half of the city west of the Rideau River.
I assure you that the second branch will not go down Montreal Road.
     
     
  #6379  
Old Posted Feb 27, 2018, 6:41 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by PHrenetic View Post
Good Day.

Which is where the Blair split-off southeastward thru the southside of Blackburn Hamlet out to Frank Kenny Rd. proposed transitway has been bandied as a direct-to-LRT, like the Riverside South proposal, and the western Kanata / Stittsville expansion.

We shall see ??
Yes, we have a right of way, don't we? But I love how it bypasses pretty much everything. Meanwhile, we set up a bus route as a precursor to the Transitway right on Innes Road. Frankly, that is where the ridership is. We should have kept an allowance on the south side of Innes Road before it was all built up but our focus was on buses.
     
     
  #6380  
Old Posted Feb 27, 2018, 9:39 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,072
Quote:
Originally Posted by lrt's friend View Post
I assure you that the second branch will not go down Montreal Road.
Nor will there be another eastern branch for a very long time.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:35 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.