Quote:
Originally Posted by roger1818
I like the idea of the NCC taking over the bridge, but I can't imagine they would want the responsibility even if it was "discontinued" (they certainly wouldn't want it if it wasn't).
|
It wouldn't be "discontinued". The NCC, even with their past peccadilloes, is a perfect 'guardian' of the structure and that portion of the rail line.
Be aware that the Transport Ministry alone has the power to 'assume' the structure, but best that it be a separate motion of Parliament to take possession, and have the ability to immediately compensate the City by doing so and grant money to the NCC specifically to refurbish it for all users to share, including OC Transpo (via their certified rail division), pedestrians, cyclists and any other future certified users (MOOSE, VIA, etc).
Quote:
Works for general advantage of Canada
25 All works of the Commission, whether constructed or executed before or after February 6, 1959, are hereby declared to be for the general advantage of Canada.
R.S., c. N-3, s. 23.
|
National Capital Act (R.S.C., 1985, c. N-4)
http://laws-lois.justice.gc.ca/eng/acts/N-4/page-3.html#h-9
The Plan for Canada’s Capital, 2017–2067
[...]
MILESTONE 17
IMPROVED INTERPROVINCIAL
TRANSPORTATION
The NCC will collaborate with the cities, transport
authorities and various community groups in the
Capital Region to continue the development of
multi-modal and interprovincial connections and
better transit integration. An initial element may be
a project by the City of Ottawa to create a multi-use
pathway across the Prince of Wales railway bridge
connecting Ottawa and Gatineau. In the medium
term, the NCC will advocate for the construction of a
full public transit connection on this bridge in order
to integrate the transit systems of both cities on their
primary north–south axis.
http://capital2067.ca/wp-content/uploads/2017/05/PFCC-English-complete-optimized.pdf pg 70 of the printed report, pdf pg 79
MOOSE' projected plan is to do both rail and added cycle/walkways across the bridge.