Quote:
Originally Posted by Migrant_Coconut
To be fair, the train routes are mostly for the industrial zones and completely out of the way for most of Richmond. I'm guessing that any light rail to Steveston would branch off the Arbutus Line and continue down Garden City/Granville, then Railway.
|
That's right - I had always heard that an LRT, etc. would travel down Granville Ave. then the Railway RoW.
Quote:
Originally Posted by cganuelas1995
To be honest, and inb4 "The Canada line was never meant to be extended because it's oBvIoUsLy single tracked at the Richmond terminus", they should either extend the Canada line down No.3 and maybe have a frequent bus or a B-line between Steveston and Riverport, with connections to the future Steveston highway-99 interchange bus station, or have it go down No.3, turn left on Granville, Railway, and stop at a future Steveston interchange.
|
One the of the requirements was that it be capable of being extended southwards.
Now that doesn't require a 2-track guideway.
Remember when there were plans for the No. 3 Rd. guideway to be single tracked for a segment near Capstan, then return to being 2-track south of there? It was eventually rejected because of the impact on train operations - but it was seriously considered.
So if the guideway is extended south of Brighouse Station, I would expect poorer frequencies on that segment, simply due to the intervening single track section (if it is not replaced).