Here we go again....again.
Project Connect has a preliminary system map with 3 light rail lines, 4 bus rapid lines, a circulator line that could be electric bus or train and some changes to commuter rail.
Light Rail will basically be a straight line going from N Lamar / Tech Ridge to S. 1st / Slaughter via N. Lamar/Guadalupe/S. 1st. There would also be a light rail line that connections to this one which goes down Riverside to the Airport.
Bus Rapid would be:
West to East Austin via Lake Austin/W. 7th/E 7th
North Austin from the Convention Center to Highland Mall (2014 light rail northern route)
East Austin Via Dean Keaton/Manor to Muller and maybe Colony Park
SouthWest Austin via S. Lamar/290 to Oak Hill
-Red Line would get double track, increased evening/late night commuter and freight service
-Starter Green Line would be built from the convention center to Manor (not Elgin). No station at MLK was a surprise but it was nice to see a station at Pleasant Valley. 270 million to setup.
-LRT would include lots of elevated rail downtown to Crestview.
-Electric Bus or Train Circulator line going from UT to S. Congress with 3 East-West sections: Dean Keanton between Guad and San Jacinto, Maybe MLK between Guad and San Jacinto and 4th between Guad and the Convention Center.
-Possible LRT spur from N. Lamar to Domain Proper
The plan could cost up to 8 billion. This will be presented to a bunch of folks and could get changes. Later this year they will have to determine phasing which means deciding what to put on a bond request. I don't see how they couldn't be ready to put a bond on the ballot in November 2019 but I'm not sure how much is going to be available and I think they would rather put something like this on 2020 in a presidential vote. It's just so far away.