Quote:
Originally Posted by Catenary
The Heron road cycle track project mentioned grade separation as well. It will be interesting to see how they pull this off, both railways are constrained by bridges under and over and the nearby station.
|
I really would have to believe that the T-Line will be totally regraded - depressed, with the roads mostly, and VIA tracks utterly, remaining as they are.
The Transitway under the T-Line will become a bridge over the T-Line, and any opportunity to widen the rail passage under the Bronson/Parkway road bridge
(reinforced trenching past the foundations) to accommodate double track will be taken as they depress the T-Line.
The station will be regraded with the T-Line, basically re-built, during the shutdown,
and the T-Line will dive under the VIA rails, leaving the VIA grade untouched, like at the Belfast connector, also done during the shutdown.
With this, they can expand the passing track (or call it extend the double tracking) north, right up to the Heron Rd. bridge (too much to hope for?).
The biggest problem will be to handle the Sawmill Creek bed.
Hope ? Hope dashed ? We shall see !