HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Would you like to separate this thread for individual station projects?
Yes 19 31.15%
No 42 68.85%
Voters: 61. You may not vote on this poll

Reply

 
Thread Tools Display Modes
     
     
  #3001  
Old Posted Jan 7, 2018, 6:46 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,121
Quote:
Originally Posted by BobLoblawsLawBlog View Post
It's not too hard. Commercial Broadway is a really popular spot for graffiti in Vancouver. The way to get on the shoppers building is to go climb on the fence where the hide the trash on the far east part of the building, then jump on the little glass part that hangs over the sidewalk. Jump on the roof and you're up there.
That's dedication for a crappy looking tag.
Whoever did the one down on the brick wall you can clearly went to arts school in comparison.
Reply With Quote
     
     
  #3002  
Old Posted Jan 10, 2018, 9:38 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,129
will braodway/commercial completed in 2018? or is it set for 2019?

seems like its never going to happen
Reply With Quote
     
     
  #3003  
Old Posted Jan 14, 2018, 8:33 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 516
Quote:
Originally Posted by SpongeG View Post
will braodway/commercial completed in 2018? or is it set for 2019?

seems like its never going to happen
Looking at the progress so far it seems like it could be completed by the end of the year. This is just my own mostly uneducated guess though.
Reply With Quote
     
     
  #3004  
Old Posted Jan 14, 2018, 8:21 PM
stump's Avatar
stump stump is offline
Registered User
 
Join Date: Sep 2009
Posts: 126
Quote:
Originally Posted by SpongeG View Post
will braodway/commercial completed in 2018? or is it set for 2019?

seems like its never going to happen
I feel the same way about Metrotown station since I overlook it every day at work. Blows my mind how long it's taking for such a relatively small thing. It started almost 3 years ago.
Reply With Quote
     
     
  #3005  
Old Posted Jan 15, 2018, 3:10 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,806
Quote:
Originally Posted by stump View Post
I feel the same way about Metrotown station since I overlook it every day at work. Blows my mind how long it's taking for such a relatively small thing. It started almost 3 years ago.
The Metrotown overhaul isn't a "small thing" - they've essentially rebuilt the entire station, one piece at a time. To do that while keeping the station in operation isn't a simple task.

On the other hand, yeah - it seems like it's been taking forever.
Reply With Quote
     
     
  #3006  
Old Posted Jan 15, 2018, 4:11 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Remember that their original plan was to close the station during construction
- so keeping the station open probably resulted in a huge change in timing.

Found this:
15 months with station closure or 28 months without closure.
http://www.metronews.ca/news/vancouver/2...town-skytrain-station-for-15-months.html
Reply With Quote
     
     
  #3007  
Old Posted Jan 15, 2018, 8:47 PM
Transiteer Transiteer is offline
Registered User
 
Join Date: Mar 2017
Posts: 25
Quote:
Originally Posted by stump View Post
I feel the same way about Metrotown station since I overlook it every day at work. Blows my mind how long it's taking for such a relatively small thing. It started almost 3 years ago.
Relevant before / after shot from VIA Architecture's Twitter shows the extent of upgrades https://twitter.com/viaarchitecture. Note that a lot of work can only be done in the 4 hour window when the station is shut. https://pbs.twimg.com/media/DHSP-MSVYAIPVZ5.jpg
Reply With Quote
     
     
  #3008  
Old Posted Jan 15, 2018, 9:03 PM
stump's Avatar
stump stump is offline
Registered User
 
Join Date: Sep 2009
Posts: 126
Quote:
Originally Posted by aberdeen5698 View Post
The Metrotown overhaul isn't a "small thing" - they've essentially rebuilt the entire station, one piece at a time. To do that while keeping the station in operation isn't a simple task.

On the other hand, yeah - it seems like it's been taking forever.
Fair enough, that does make sense.
Reply With Quote
     
     
  #3009  
Old Posted Jan 23, 2018, 1:55 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Speaking of metrotown station, according to station access all 3 elevators went out of service at the same time for a bit this evening.

Last edited by Express691; Jan 23, 2018 at 2:57 AM.
Reply With Quote
     
     
  #3010  
Old Posted Jan 23, 2018, 7:36 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Quote:
Originally Posted by Express691 View Post
Speaking of metrotown station, according to station access all 3 elevators went out of service at the same time for a bit this evening.
Let me guess they are all on the same controller an the controller BSOD.
Reply With Quote
     
     
  #3011  
Old Posted Jan 23, 2018, 4:45 PM
stump's Avatar
stump stump is offline
Registered User
 
Join Date: Sep 2009
Posts: 126
Quote:
Originally Posted by Mac Write View Post
Let me guess they are all on the same controller an the controller BSOD.
Must be on the same controller as the escalators in the mall and elevators in the towers. Always broken, always being repaired.
Reply With Quote
     
     
  #3012  
Old Posted Jan 24, 2018, 7:15 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Quote:
Originally Posted by stump View Post
Must be on the same controller as the escalators in the mall and elevators in the towers. Always broken, always being repaired.
Some have said that there is no standard for elevator and escalator specifications and designs, leading to parts shortages and "inventory headaches".
Reply With Quote
     
     
  #3013  
Old Posted Jan 25, 2018, 3:31 AM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
I noticed today that the new platform at Commercial-Broadway has almost all of the yellow edge tiles poking out underneath the plywood construction hoarding. The passerelle will be the bottleneck I'd bet, as it has a roof and floor, but still needs glass, electrical, stairs, and an escalator.
Reply With Quote
     
     
  #3014  
Old Posted Jan 25, 2018, 3:34 AM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 770
Quote:
Originally Posted by Spork View Post
I noticed today that the new platform at Commercial-Broadway has almost all of the yellow edge tiles poking out underneath the plywood construction hoarding. The passerelle will be the bottleneck I'd bet, as it has a roof and floor, but still needs glass, electrical, stairs, and an escalator.
I was hoping they'd prioritize the widened passerelle to the Commercial platform, but that is still encased in plywood, waiting for glass to be installed
Reply With Quote
     
     
  #3015  
Old Posted Jan 25, 2018, 4:18 PM
stump's Avatar
stump stump is offline
Registered User
 
Join Date: Sep 2009
Posts: 126
Quote:
Originally Posted by Express691 View Post
Some have said that there is no standard for elevator and escalator specifications and designs, leading to parts shortages and "inventory headaches".
I work in one of the towers and there have been numerous people stuck in elevators up to 2 hours as recently as this morning. Not a good situation to say the least for whatever the problem is; parts, inventory, lack of upkeep. Hopefully the Skytrain stations don't have the same problem in 10 years.
Reply With Quote
     
     
  #3016  
Old Posted Jan 25, 2018, 5:07 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,739
When I went to Metrotown couple of weeks ago, it was raining pretty hard. Riding down one, I felt rain water coming down all over as if there was no shelter above. Would this have contributed to the escalators breaking down? I imagine they are not built for outdoor use.
Reply With Quote
     
     
  #3017  
Old Posted Jan 25, 2018, 10:35 PM
vannick vannick is offline
Registered User
 
Join Date: Oct 2009
Location: Vancouver
Posts: 24
Construction on the commercial/broadway station is taking way to long. I have witnessed THREE 40+ towers go up near Brentwood mall in a shorter time then this is taking. The amount of money being wasted on the crane that sits near the lower tracks has got to be tremendous, I bet they could have purchased one for less then what they have leased/rented it for.
Reply With Quote
     
     
  #3018  
Old Posted Jan 25, 2018, 11:04 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,820
Stick people walking through the job site while they're building the towers then keep talking.
Reply With Quote
     
     
  #3019  
Old Posted Jan 25, 2018, 11:09 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,739
Quote:
Originally Posted by jollyburger View Post
Stick people walking through the job site while they're building the towers then keep talking.
No one walks through the new link and platform, which are totally separate from the existing link and platform. Agree that the construction is taking way too long.
Reply With Quote
     
     
  #3020  
Old Posted Jan 28, 2018, 11:12 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Quote:
Originally Posted by Spork View Post
I noticed today that the new platform at Commercial-Broadway has almost all of the yellow edge tiles poking out underneath the plywood construction hoarding. The passerelle will be the bottleneck I'd bet, as it has a roof and floor, but still needs glass, electrical, stairs, and an escalator.
Quote:
Originally Posted by dpogue View Post
I was hoping they'd prioritize the widened passerelle to the Commercial platform, but that is still encased in plywood, waiting for glass to be installed
Also noticed today that trains are entering platform 3 at walking speed.

Last edited by Express691; Jan 28, 2018 at 11:48 AM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:38 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.